1 / 127100%
1
Chapter 1: Introduction to the Study
Introduction
Project failures continue to occur at an alarming rate. Globally, there are still
more project failures than successes (Gupta et al., 2019). Failed projects can lead to cost
overruns, loss of market share, and unmet stakeholder expectations and can impede
strategic opportunities (Ahmed & Anantatmula, 2017; Burrell, 2018; Hassan et al., 2017).
In addition to the organizational impacts, project failure can deny society products,
services, and programs that could improve quality of life (Holcomb et al., 2021).
Therefore, researchers have continued to study factors that influence project success,
including project approach, project type, stakeholder perceptions, and project manager
characteristics (Maqbool et al., 2017).
Many global profit and nonprofit organizations have adopted talent management
strategies to hire competent project managers (He et al., 2018). For example, Millhollan
and Kaarts-Brown (2016) argued that job announcements seek project managers who
possess the Project Management Institute (PMI) certification. Chen et al. (2019) reported
an increase in professional development among project managers. Other evidence
corroborates the idea that competent project managers can influence project success
(Maqbool et al., 2017). Therefore, for-profit and nonprofit organizations must attract and
retain the most competent project managers to achieve project success (Alvarenga et al.,
2018; Hassan et al., 2017).
Personality traits are also an important factor in achieving successful project
outcomes (de Moura et al., 2017). For instance, careers in project management are best
2
suited for those who can handle ambiguity, volumes of disparate information, criticism,
diverse groups, and a high degree of stress (Noor et al., 2020). Therefore, project
manager personality traits are considered when staffing project managers at different
work experience levels (Chen et al., 2019; Henkle et al., 2019).
Although for-profit and nonprofit organizations consider project manager
competence and personality traits in personnel decisions, project failure persists (Gupta et
al., 2019). Continued project failure can lead to fewer quality and timely goods and
services offered by for-profit companies and diminished social good flowing through
nonprofit organizations (Hassan et al., 2017). Therefore, it is important to better
understand how project manager competencies and personality traits can influence
project success among project managers at different work experience levels.
This study contributes to the project management literature by identifying that
project manager competency is a stronger predictor of project success than personality
traits among project managers at different work experience levels (Chen et al., 2019).
This study provides information to help improve learning and develop interventions for
for-profit and nonprofit project managers at different work experience levels (Chen et al.,
2019; Hassan et al., 2017). Also, the study supplies knowledge to help improve project
management outcomes that benefit vulnerable communities.
This chapter begins with a description of project success, project manager
competencies, personality traits, and work experience. In the chapter, I discuss the
study’s problem, purpose, research questions, theoretical framework, nature, and
definitions. The remainder of the chapter provides assumptions, delimitations,
3
limitations, and significance. The chapter concludes with a summary, the importance of
the study to the literature, and a transition to Chapter 2.
Background
Growing research on project success has revealed unclear results (Ika, 2009).
There remains no universal definition of project success, complicating measurement (De
Wit, 1988). However, studies have revealed that assigned project managers influence
project success or failure (Alvarenga et al., 2019). Unsuccessful projects are costing
profit and nonprofit organizations $50 billion to $150 billion in losses annually (Gruden
& Stare, 2018). Although other factors can influence project success, employing project
managers with the right skills and personality is vital to an organization’s financial
performance, mission, and competitive advantage (Ijaola et al., 2020).
Project success is higher among project managers who possess specific skills and
abilities (Luţaş et al., 2020). Millhollan and Kaarts-Brown (2016) argued that technical
skills are the minimum requirements for project managers to plan and manage projects of
different complexity and context. For example, project managers must be able to
communicate effectively with a variety of internal stakeholders, including project
sponsors, team members, functional managers, and the public (Gunter, 2020). El-Sabaa
(2001) found and grouped 18 essential project manager skills into three categories:
human skills, conceptual and organizational skills, and technical skills, with human skills
being the most important. However, when project managers lack critical skills, including
effective communication, leading others, and planning, then project success is less likely
4
(Chen et al., 2019). Researchers tend to agree that project manager competency is one of
the most predictive factors of project success (Hassan et al., 2017).
Project managers’ personal traits are also a critical factor in project success (de
Moura et al., 2017). In addition to technical project management techniques, project
managers must possess interpersonal skills such as decision making to know how and
when to apply their technique to see the most significant project results (Alvarenga et al.,
2020). Personality traits such as curiosity, reliability, and collaboration tend to help
project managers experience more success than those who do not demonstrate these traits
(Henkel et al., 2019). Additionally, project managers who effectively manage their
emotions are also associated with consistent project success (Podgórska & Pichlak,
2019). Other studies show that project managers who are enthusiastic, organized,
imaginative, and cooperative tend to be the most successful (Masood et al., 2018).
Conversely, project managers who are perceived as unconcerned, haphazard, and
disagreeable are associated with project failure (Mansour et al., 2021). Many scholars
now consider personality a satisfactory predictor of project success (Noor et al., 2020;
Thal & Bedingfield, 2010).
The relationship between work experience and project success findings have been
mixed. Hoxha and McMahan reported that work experience does not predict project
success (2018). However, other scholars have identified a significant relationship
between work experience and project success (Noor et al., 2020). Still other researchers
have found that work experience influences knowledge, training, performance, and
project success (Luţaş et al., 2020). Work experience has been operationalized as the
5
number of years a project manager has spent planning, leading, guiding, and supervising
projects (Podgórska & Pichlak, 2019). The present study is needed because to add clarity
to how work experience moderates the relationship between project manager
competencies, personality traits, and project success among project managers at different
work experience levels. This study was conducted to address this research gap.
Problem Statement
Project success is vital to an organization, especially to achieving and maintaining
competitive advantage (Henkel et al., 2019). Project success has been characterized as a
project that satisfies the specified purpose and achieves a high level of stakeholder and
project team member satisfaction (Moradi et al., 2020). Despite substantial research
related to the antecedents, templates, and consequences of project success, 55% of
projects are considered a failure or unsuccessful (Burrell, 2018; Gruden & Stare, 2018).
Scholars have argued that an assigned project manager is the main driving force behind a
project (Alvarenga et al., 2019; Araújo & Pedron, 2016; Shet et al., 2019). Other studies
have shown that project managers’ competence coupled with personality traits can make
a difference in whether a project succeeds or fails (Burrell, 2018; Ijaola et al., 2020).
A general problem among for-profit and nonprofit organizations is continued
project failures characterized by missed requirements, cost overruns, and poor
stakeholder acceptance. For example, Gruden et al. (2018) reported that projects continue
to fail 50%–70% of the time. Two reasons for project failure include lacking or
ineffective project manager competencies and negative personality traits (Araújo &
Pedron, 2016; Millhollan & Kaarts-Brown, 2016). With project management being used
6
to achieve strategic goals, organizations must find ways to get the most out of their
projects (Ahmed & Anantatmula, 2017). The answer lies in hiring and assigning project
managers with the knowledge, skills, abilities, and other traits most associated with
project success (Alvarenga et al., 2019). However, securing the most effective project
manager qualities remains a challenge given the enduring high project failure rate (Gupta
et al., 2019). The specific problem in this study is the lack of information about the
relationship between project manager competencies, personality traits, and project
success among project managers at different work experience levels. This study also
addresses a lack of information about how project manager competencies and personality
traits uniquely predict project success when moderated by work experience.
Understanding how project manager competencies and personality traits are related to
project success may contribute to project manager recruitment and selection decision,
professional development, and certification.
Purpose of the Study
The purpose of this quantitative study was to provide information about the
relationship between project manager competencies, personality, and project success by
(a) investigating the relationship between project manager competencies, personality
traits, and project success; and (b) identifying whether project competencies or
personality traits is the strongest predictor of project success among project managers at
different work experience levels. The predictor variables were project manager
competencies and personality traits. The criterion variable was project success. The
moderating variable was work experience. Researchers have suggested additional
7
investigation into the role work experience plays in the relationship between project
manager competencies, personality traits, and project success.
Research Questions and Hypotheses
The following research questions and hypotheses guided this quantitative study:
RQ1: Do project manager competencies as assessed by the three skills of effective
administrators measure predict project success as assessed by the Project Implementation
Profile measure?
H
0
1: Project manager competencies do not predict project success.
H
a
1: Project manager competencies do predict project success.
RQ2: Do personality traits as assessed by the Big Five personality measure
predict project success as assessed by the Project Implementation Profile measure?
H
0
2: Personality traits do not predict project success.
H
a
2: Personality traits do predict project success.
RQ3: Does work experience as assessed by a project manager’s years of
experience predict project success as assessed by the Project Implementation Profile
measure?
H
0
3: Work experience does not predict project success.
H
a
3: Work experience does predict project success.
RQ4: To what extent do project manager competencies as assessed by the three
skills of effective administrators measure and personality traits as assessed by the Big
Five personality measure contribute uniquely to predicting project success as assessed by
the Project Implementation Profile measure?
8
H
0
4: Project manager competencies and personality traits do not contribute
uniquely to predicting project success.
H
a
4: Project manager competencies and personality traits do contribute uniquely
to predicting project success.
RQ5: Does work experience as measured by a project manager’s years of
experience moderate the relationship between project manager competencies as assessed
by the three skills of effective administrators measure and project success as assessed by
the Project Implementation Profile measure?
H
0
5: Work experience does not moderate the relationship between project
manager competencies and project success.
H
a
5: Work experience does moderate the relationship between project manager
competencies and project success, such that the relationship between project
manager competencies and project success will be more strongly positive at
greater project manager years of experience than at lower project manager years
of experience.
RQ6: Does work experience as measured by a project manager’s years of
experience moderate the relationship between personality traits as assessed by the Big
Five personality measure and project success as measured by the Project Implementation
Profile measure?
H
0
6: Work experience does not moderate the relationship between personality
traits and project success.
9
H
a
6: Work experience does moderate the relationship between personality traits
and project success, such that the relationship between personality traits and
project success will be more strongly positive at greater project manager years of
experience than at lower project manager years of experience.
Theoretical Framework for the Study
Project Management Competency
There is no agreement on a universal theory of project management (Niknazar &
Bourgault, 2017). Therefore, I based this study on El-Sabaa’s (2001) findings that 18
essential project manager competencies can be grouped into three categories: (a) human
skills, (b) conceptual and organizational skills, and (c) technical skill. El-Sabaa grounded
the 18 essential competencies in Katz’s (2009) three skills of effective administrators.
Project management competency is the proven ability to conduct activities exceptionally
within a project’s complex atmosphere, leading to anticipated results. El-Sabaa’s 18
essential project management competencies match other project management competency
findings (Ahmed & Anantatmula, 2017; Alvarenga et al., 2019).
Big Five Personality Traits
Personality has been described as a preset system of settings distinctive for every
individual (Kraczla, 2017). The Big Five personality traits framework, originally defined
by Costa and McCrae (1985) as a five-factor personality assessment, was used for this
study. The Big Five personality traits framework is a well-established conceptualization
and measurement of five broad dimensions of personality that provides sufficient
assurance and strength in personality analyses (de Moura et al., 2019). The Big Five
10
personality traits framework was used because project manager personality has been a
strong predictor of project success.
Work Experience
Tesluk and Jacobs’s (1998) theory of work experience has been characterized as
the attainment of job-related knowledge, skills, and abilities acquired over time. Work
experience considers the length of time working on a task, a job, or within an
organization. In addition to length of time, work experience considers the number of
times a duty or an assignment has been performed. Key knowledge, skills, and abilities
gained from work experience include taking on new assignments, implementing changes,
and overcoming job demands from difficulties. Tesluk and Jacobs also argued that the
length of time in a job would increase opportunities for a variety of projects that could
challenge and stimulate growth and development. The theory of work experience
framework was used because project manager work experience has been positively linked
to project success.
Project Success
Pinto and Slevin’s (1987) framework of project success is generally regarded as
one of the leading ways of understanding how to identify and measure project success
(Orouji, 2016; Pinto & Prescott, 1988; Pinto & Slevin, 1988). The key components of
Pinto and Slevin’s theory are (a) clear goals, (b) project manager competence, (c) top
management support, (d) team member competence, (e) sufficient resources, (f) adequate
communication, (g) control mechanisms, (h) feedback capabilities, and (i) client
responsiveness. The framework provided the foundation for developing a behavioral
11
instrument to assess project status. Pinto and Slevin’s theory of project success has been
used extensively in project management education and fieldwork (Pinto & Prescott,
1988). This framework provided a set of project success factors to use in this study when
exploring project manager competencies and personality which have been found to
influence project success.
Much research has been done to investigate the influence of project manager
competencies and personality traits on project success. However, what is not known is
which is the better predictor of project success. In this study, I aimed to address this gap
by exploring the relationship between project manager competencies, personality traits,
and project success to determine whether project manager competencies or personality
trait was the better predictor of project success.
Nature of the Study
The nature of this study was quantitative and nonexperimental. Quantitative
research is consistent with comparing the variation in ratings of project manager
competencies and personality traits among project managers at different position levels,
which was the focus of this doctoral study (Frankfort-Nachmias et al., 2015). In this
cross-sectional study, I used a questionnaire to collect ratings of project manager
competencies and personality traits from professional project managers with varying
degrees of work experience. Primary data were used to test the hypotheses. The predictor
variables were project manager competencies and personality traits, the criterion variable
was project success, and the moderating variable was work experience. There were no
12
exclusions based on industry. However, I focused on project managers with at least 2
years of professional experience in the field of project management.
This study was conducted using quantitative survey research to investigate the
relationship between project manager competencies, personality traits, and project
success among project managers at different work experience levels. The survey design
was cross-sectional with the data collected electronically at one point in time. Survey
research is a recommended method to investigate and identify the variables most likely to
predict project success among project managers at different stages of their careers.
Project manager competencies were defined as the knowledge, skills, and abilities that
contribute to project success and was measured using the three skills of effective
administrators measure (El-Sabaa, 2001; Katz, 1991). Personality traits were defined as
are individual differences in patterns of thinking, feeling, and behaving and was
measured using the Big Five personality measure (Cattell, 1943; Costa & McCrae, 1985).
Work experience was defined as the number of years in a project manager position and
was measured using five classifications on a demographic questionnaire (Denton &
Kleiman, 2001). Project success was defined as the state when a project’s technical
performance conditions and mission are met and stakeholder satisfaction is high and was
measured by the Project Implementation Profile measure (Pinto & Slevin, 1987).
Simple linear regression was performed to analyze project manager competencies,
personality, and work experience as predictors of project success. Using the Statistical
Package for Social Sciences Version 28 (SPSS 28), I analyzed the relationship between
the predictor variables project manager competencies and personality traits, the criterion
13
variable project success, and the moderating variable work experience. Moderation
analysis was used to assess the moderating effect work experience had on the strength of
the relationship between the predictor variables and the criterion variable (Hayes, 2017).
Definitions
In the following section, I provide definitions of variables in this study.
Personality traits: Individual differences in patterns of thinking, feeling, and
behaving (Cattell, 1943).
Project manager competencies: Knowledge, skills, and abilities that contribute to
project success (El-Sabaa, 2001).
Project success: The state when a project’s technical performance conditions and
mission are met and stakeholder satisfaction is high (De Wit, 1988; Kloppenborg &
Opfer, 2002; Pinto & Prescott, 1988)
Work experience: The number of years in a project manager position (Quińones et
al., 1995; Tesluk & Jacobs, 1998).
Assumptions
There were several assumptions related to this study. One assumption was that all
participants would provide an honest assessment of their work experience. Another
assumption was that I would recognize the names of any project managers I know to
remove those individuals from the participant pool. A third assumption was that
participants would be familiar with the Project Management Institute project management
framework and terms in the survey.
14
Scope and Delimitations
The scope of this study included understanding how the relationship between
project competencies, personality traits, and project success is moderated by work
experience among project managers at different work experience levels. There were no
exclusions by industry. However, the scope of the study was limited to project managers
at different work experience levels who possess at least 2 years of work experience,
which would likely be required to respond to the measurement instruments. Although
studies have been conducted to assess the influence of project competencies and
personality traits on project success, there have been few studies conducted to investigate
the relationship between project manager competencies, personality traits, and project
success when moderated by work experience. Data were obtained from a quantitative
survey that resulted in scores for project manager competencies, personality traits, work
experience, and project success. The measurements were the three skills of effective
administrators to measure project managers competencies, the Big Five Personality Trait
Short Questionnaire to measure personality traits, a demographic scale to measure work
experience or project manager years of experience, and the Project Implementation
Profile to measure project success.
Limitations
In this study, I used a convenience sample of project managers solicited through
social media platforms and the Amazon Mechanical Turk website. The lack of a random
sample weakened the generalizability of the findings.
15
Significance
As business activities grow more multifaceted and dynamic, project managers at
all levels are held accountable for growing technical and interpersonal skills to lead
projects in complex environments (de Moura et al., 2019; Gruden & Stare, 2018). The
results of this study provide information to help human resources professionals and
certification organizations create training to prepare project managers for success at each
career stage. Also, this study adds to the literature by joining the conversation about
reevaluating current project management certification programs to strengthen the
alignment with certain competencies and personality traits needed at specific career
stages.
The study could yield positive social change results in the nonprofit sector, where
these organizations play a significant role in developing countries (Hassan et al., 2017).
Nonprofit organizations are not always able to invest in the training and development of
their project management staff. This study might provide practitioners and educators with
role-specific training and development needs, improving project managers’ social change
project management within vulnerable communities.
With the findings of this study, I aimed to address a gap in the literature by using
a single study to investigate the influence of project manager competencies and
personality traits on project success among project managers at specific work experience
levels (Chen et al., 2019). This study explains whether project manager competencies or
personality traits are the most significant predictor of project success. In addition, this
16
study provides insight into the most critical project manager competencies and
personality required at different work experience levels (Chen et al., 2019).
Summary
Chapter 1 introduced several impacts of project failure. The chapter provided
definitions of and background about project manager competencies, personality traits,
work experience, and project success. Project manager competencies and personality
traits are two of the most critical factors that impact project success (Millhollan & Kaarts-
Brown, 2016). The background information about project manager competencies,
personality traits, and work experience helps with understanding how project manager
competencies and personality traits can influence project success. This chapter also
included a problem statement, a purpose of the study, and the aligning research questions
and hypotheses. Chapter 1 also highlighted the potential applications of the study,
including informing human resources professionals and certification organizations about
possible project management training for different work experience levels.
Chapter 2 includes the relevant literature related to project success. The chapter
consists of the foundation of project success and the influence of project manager
competencies, personality traits, and work experience. In Chapter 3, I explain the purpose
of the study, the research design and methods, and the data analysis procedures. In
Chapter 4, I describe the results, data collection, statistical tests, data analysis, and minor
changes to the research proposal. Lastly, Chapter 5 concludes the study by interpreting
the findings and providing recommendations, limitations, and a final summary.
17
Chapter 2: Literature Review
Introduction
The purpose of this quantitative study was to provide information about the
relationship between project manager competencies, personality, and project success by
(a) investigating the relationship between project manager competencies, personality
traits, and project success; and (b) identifying whether project competencies or
personality traits is the strongest predictor of project success among project managers at
different work experience levels. Organizations depend on project management to
achieve initiatives and maintain competitive advantage (Alvarenga et al., 2019; Henkel et
al., 2019). Unsuccessful projects result in billion-dollar losses annually (Hughes et al.,
2020).
There has been extensive study on project success and factors influencing project
outcomes, including project manager competencies and personality traits (Baccarini,
1999; De Wit, 1988; Maqbool et al., 2017). For example, Davis (2014) argued that
numerous factors can influence project success including project manager competencies.
In another study, Hassan et al. (2017) found that project success was positively related to
personality traits including extraversion, agreeableness, conscientiousness, and openness
to experience. Although work experience was not a strong predictor of project success,
some research has revealed that project managers’ work experience is significantly linked
with personality, which could moderate the relationship between project managers’
personality traits and project success (Hoxha & McMahan, 2018; Noor et al., 2020).
However, little research has been conducted to investigate if project managers’
18
competencies or personality traits are the most significant predictor of project success
among project managers at different work experience levels (Chen et al., 2019). This
literature review provides insight into the relationship between project manager
competencies, personality, and project success.
In this chapter, I review relevant literature on project manager competencies,
personality, and project success. I include the literature search parameters used for this
literature review. Finally, a comprehensive literature review of project manager
competencies, the five-factor personality model, and project success follows, and I close
with a summary and conclusion.
Literature Search Strategy
I searched for relevant peer-reviewed scholarly literature from PsycINFO,
Business Source Complete, Emerald Insight, Sage Premier, ProQuest Central, and
Science Direct databases. I searched Google Scholar in addition to these databases. The
keywords and phrases used included project managers, project manager competencies,
project success, skills, information technology project managers, personality traits, work
experience, career path, development path, and project manager and personality traits
and project success. I primarily examined literature published from 2017 to 2020. I
selected articles from the following categories: project manager competency articles,
personality trait-related articles, project success-related articles, and work experience.
Some selected articles included seminal works and articles from 1985, where there is
little information about the relationship between project managers, personality traits, and
project success.
19
Theoretical Foundation
Project Management Competency
Project success is influenced by several factors: project manager skills, project
management approach, project team, project size, senior leadership support,
organizational hierarchy, external factors, and environmental factors (Hassan et al., 2017;
Wu et al., 2017). Project manager technical and interpersonal skills have received
substantial attention in the literature (Burrell, 2018; Omar & Fayek, 2016). One standard
definition of competency is the combination of knowledge, skills, and attitude (Chen et
al., 2019; He et al., 2019; Moradi et al., 2020). Researchers generally agree that project
manager technical skills, such as planning and control, are necessary but insufficient for
project success without the use of interpersonal skills, including leadership and
communication (Gruden & Stare, 2018; Maqbool et al., 2017; Millhollan & Kaarst-
Brown, 2016).
Project management competency is the proven ability to carry out activities
within a project’s complex atmosphere, leading to anticipated results. There is no
agreement on a universal theory of project management (Niknazar & Bourgault, 2017).
Therefore, this study was based on El-Sabaa’s (2001) project manager competencies
categories: human skills, conceptual and organizational skills, and technical skills. El-
Sabaa grounded the three project manager competencies in Katz’s (1991) three skills of
effective administrators. El-Sabaa’s project manager competencies matched other project
management competency findings (Ahmed & Anantatmula, 2017; Alvarenga et al.,
2019). Therefore, the three El-Sabaa project manager competencies provided a
20
foundation for evaluating project managers’ human, conceptual and organizational, and
technical skills in this study.
The Big Five Personality Traits
Personality, another literature focus, has been linked to project success (Aretoulis
et al., 2017; de Moura et al., 2019; Henkel et al., 2019). Some researchers describe
personality as a preset system of thought, emotions, motivation, and behavior for every
individual (Kraczla, 2017; Thielmann et al., 2020). In this study, I used Costa and
McCrae’s (1985) Big Five personality traits framework. The Big Five personality traits
framework is a well-established conceptualization and measurement of five broad
personality dimensions that provide sufficient assurance and strength in personality
analyses (de Moura et al., 2019). The Big Five personality traits approach assumes that
the five personality dimensions cover and incorporate the most known personality traits
and are expected to describe the basic structure behind all personality traits across a given
culture (Barańczuk, 2019; Do & Minbashian, 2020; Pletzer et al., 2019).
The Costa and McCrae (1985) Big Five personality traits model incorporates a
myriad of traits into the following five predictor dimensions:
• Extraversion: Individuals with extraverted personalities tend to exhibit warmth,
assertiveness, sociability, and energy. The extraversion trait is related to
dominance with a team and the propensity for creative performance, which can be
beneficial in modern project management settings (Ling et al., 2020; Masood et
al., 2018). Project managers with higher extraversion scores tend to experience
greater project success (Henkel et al., 2019; Thal & Bedingfield, 2010).
21
• Agreeableness: Individuals with agreeable personalities tend to be cooperative,
honest, compliant, sympathetic, and trustworthy. Agreeable project managers are
known for getting along well with others (Ersoy-Kart et al., 2018; Ling et al.,
2020). In a project setting, a project manager’s agreeableness personality trait can
foster collaborative team and psychologically safe environments (de Moura et al.,
2019).
• Openness to Experience: Individuals with open personalities tend to demonstrate
creativity, intellectual curiosity, sensitivity to beauty, and openness to emotion.
The openness to experience trait has been linked to leader performance and
overall project success (Bell, 2007). Project managers who score higher on the
openness to experience trait tend to be willing to consider innovative problem
solving and novel ideas, which can be useful in project management situations
(Aretoulis et al., 2017).
• Conscientiousness: Individuals with conscientious personalities tend to be self-
disciplined, responsible, orderly, dutiful, and dependable (Goldberg, 1993; Novo
et al., 2017). Conscientiousness traits such as accountability are essential for
project success (Mac Donald et al., 2020). Conscientious project managers
demonstrate more control over their resources and environments, which tends to
lead to effective project team outcomes (Hassan et al., 2017).
• Neuroticism: The neuroticism personality trait is characterized by negative
emotions, insecurity, and anxiousness (de Moura et al., 2019). Project managers
who score higher on neuroticism struggle to maintain emotional stability during
22
times of uncertainty (McCrae & John, 1992). Project managers who are given to
neuroticism tend to score lower on leader performance and team performance
(Deinert et al., 2015).
Individual behavior and emotional differences have been correlated with project
success (Modranský et al., 2020; Ram & Ronggui, 2018; Vo et al., 2019). For example,
research has shown that project deliveries are more successful when project managers’
personalities are a strong match with project success factors, including the project team,
project size, and project type (Ahmed & Anantatmula, 2017; Jabar et al., 2018; Rogo et
al., 2020). In this study, I used the Big Five personality traits framework because project
manager personality has been a strong predictor of project success (Mount & Barrick,
1998; Henkel et al., 2019; Masood et al., 2018).
Work Experience
Work experience is critical for project manager performance and success (Luţaş et
al., 2020; Noor et al., 2020). Several personnel processes involve work experience,
including selection, compensation, promotion, training, performance management, and
career development (Ash & Levine, 1985; Van Iddekinge et al., 2019). Early
conceptualization of work experience began without a guiding theoretical framework
(Tesluk & Jacobs, 1998). Several researchers primarily conceptualized work experience
by using tenure or years in a job or organization (Borman et al., 1993; McDaniel et al.,
1988; McEnrue, 1988; Waldman & Avolio, 1993).
Tesluk and Jacobs (1998) developed an integrated work experience model of
three quantitative and qualitative components that exist at different levels of specificity,
23
which accrue and interact over time and influence job performance. The core components
of the Tesluk and Jacobs work experience model are: (a) the traditional time-based
measures of work experience that capture the length of time on a task, in a job, or with an
organization (McDaniel et al., 1988); (b) the number of times a task or duty has been
performed (Ford et al., 1992); and (c) the type of work challenges and interactions that
accrue over time (DuBois & McKee, 1994; McCauley et al., 1994).
Tesluk and Jacobs argued that a work experience model would involve
interactions between tenure, amount, and density of work components. The Tesluk and
Jacobs work experience framework assumes that tenure repeatedly exposes an individual
to several challenging situations, which can create richer work experiences leading to the
development of knowledge, skill, and job performance (Chen et al., 2019; El-Sabaa,
2001; Hoxha & McMahan, 2018; Noor et al., 2020). In this study, I used the Tesluk and
Jacobs work experience framework because project manager work experience has been
associated with project success (Luţaş et al., 2020; Noor et al., 2020).
Project Success
Project success theory is the basis for this research. Project success has been
developed into a notable research subject within project management literature (Hassan et
al., 2017; Müller & Jugdev, 2012; Pinto & Slevin, 1987). Despite the growing body of
knowledge, the project management literature offers no consistent definition of the
project success construct (Radujković & Sjekavica, 2017; Wu et al., 2017). Early
definitions of project success focused on meeting the technical aspects of a project and
accomplishing the project management approach (Baccarini, 1999; Shenhar et al., 2001;
24
Turner et al., 1999). Today, a project is considered successful when the technical
performance conditions and mission are met and if stakeholder satisfaction is high (De
Wit, 1988; Kloppenborg & Opfer, 2002; Pinto & Prescott, 1988). Researchers have
continued to provide clear definitions of project success (Jugdev & Müller, 2005; Müller
& Turner, 2007). Other scholars have conducted studies to identify the factors and
criteria for project success for various projects and specific types of projects (Cooke-
Davies, 2002; Martin et al., 2018; Shahnazari et al., 2013).
The Pinto and Slevin (1987) framework of project success is considered one of
the top ways to identify and measure project success (Orouji, 2016; Pinto & Prescott,
1988; Pinto & Slevin, 1988). Pinto and Slevin’s theory’s key components are clear goals,
project manager competence, top management support, team member competence,
sufficient resources, adequate communication, control mechanisms, feedback
capabilities, and client responsiveness. The framework provides the foundation for
developing a behavioral instrument to assess project status. Pinto and Slevin’s project
success theory has been used extensively in project management education and fieldwork
(Pinto & Prescott, 1988). This framework provided a set of project success factors for this
study exploring project manager competencies and personality, both of which influence
project success.
Researchers have investigated the influence of project manager competencies and
personality traits on project success. However, the literature is unclear on which is the
better predictor of project success. In this study, I aimed to address this gap by exploring
the relationship between project manager competencies, personality traits, and project
25
success to determine whether project manager competencies or personality traits would
better predict project success.
Literature Review
Project Manager Competencies
The concept of competency has been applied within organizations for decades
(Adero & Odiyo, 2020; Chow et al., 2017; Koeppen et al., 2008). Competency
frameworks became the solution to replace traditional job descriptions (Sanchez &
Levine, 2009). Hartig et al. (2008) described competencies as complex ability constructs
closely related to real-life performance. Specifically, project managers need diverse
competencies to meet stakeholder expectations, lead project teams, and interact with
others at different levels within an organization (do Vale et al., 2018; Novo et al., 2017).
The list of project manager competencies has grown over time (Belassi & Tukel, 1996;
Chua et al., 1999; Jugdev & Müller, 2005). One adverse impact of the growing list of
competencies is the unrealistic expectation that project managers acquire and maintain
essential competencies (Alvarenga et al., 2019). Loufrani-Fedida and Missonier (2015)
argued that the expanding list of competencies requires project managers to be wizards.
As a result, studies have been conducted to narrow down the essential competencies
associated with project manager performance (Ahsan et al., 2013; de Araújo & Pedron,
2015; Pinto et al., 2017).
Scholars tend to agree that project manager performance is central to project
success (Ahmed & Anantatmula, 2017; Maqbool et al., 2017). However, project manager
success assessment is often comingled and confounded by the project management
26
approach (De Wit, 1988; Ika, 2009). Although project manager competence and project
management approach have been linked to project success, they measure different
factors. Baker et al. (1988) found that project inputs, processes, and outputs positively
influenced project success. In another study, researchers discovered that project
managers’ knowledge, skills, and abilities increased the likelihood of successful projects
(Freeman & Beale, 1992; Pinto & Slevin, 1987). Researchers have reported that a project
management approach is essential to project success but insufficient to achieve overall
project success (Bauer et al., 2014; Gale & Brown, 2003; Sopa et al., 2020;). Recent
studies have shown that project managers’ characteristics and behaviors significantly
impact project success more than the project management approach (Wu et al., 2017;
Yang et al., 2021). For example, Pinto and Slevin (1988) argued that project manager
selection would differentiate project success or failure. The literature is clear that project
manager competence is one of the reasons for successful or unsuccessful projects
(Ahmed & Philbin, 2020; Wen & Qiang, 2019).
Effective project managers have been studied extensively (Crosby, 2012;
Zavadskas et al., 2008). Millhollan and Kaarst-Brown (2016) argued that project
managers are unique from other managers because they hold specialized project
management training and general business management skills. Gray and Ulbrich (2017)
found that competent project managers possess a diverse skill set that contributes directly
to project success. Millhollan and Kaarst-Brown (2016) advanced the project
management literature by developing a list of seven project manager hard skills and soft
skills that consider stakeholder influence, including the following: (a) project
27
management skills, (b) business management skills, (c) knowledge of project techniques
and disciplines, (d) interpersonal skills, (e) managing the project sponsor, (f) situational
awareness, and (g) integration management. Other studies have revealed that soft skills
enhance the ability to use hard skills in various situations (Araújo & Pedron, 2016;
Ballesteros-Sánchez et al., 2017; Hutagalung et al., 2020; Rao, 2018). To better
understand what constitutes a good project manager, Fisher (2011) developed and
triangulated an extensive list of the most critical soft skills, including (a) managing
emotions, (b) building trust, (c) communication, (d) motivating others, (e) influencing
others, (f) cultural awareness, (g) leading, and (h) team building. Despite an increased
study on soft skills, there is no universal set of project manager soft skills, possibly
because of the unique projects and fluid situations in which their soft skills are used
(Cohen et al., 2013).
Although a standard list of soft skills has not been identified, Alvarenga et al.
(2019) surveyed 257 project managers. They found communication ranked as the highest
of all, which aligns with other studies that have reported that effective communication
can motivate teams, reduce confusion, increase clarity, enhance team performance, and
foster project success. Alvarenga et al. also discovered that commitment ranked the
second highest and technical or hard skills ranked third among the most crucial project
manager competencies.
Scholars have also explored the most important project manager competencies in
different industries (Al-Ghareeb & Al-Wotayan, 2021; Correa et al., 2018; Sang et al.,
2018). Hassan et al. (2017) found that effective project managers possess project
28
management expertise, business management knowledge, technical abilities, and
interpersonal skills in the information technology field. Alvarenga et al. (2019) found that
the most vital construction project manager competencies are communication, leadership,
and conflict management skills. Despite the industry, the project managers who
combined interpersonal and technical project management skills experienced the most
project success, which is consistent with other studies (Podgórska & Pichlak, 2019; Sopa
et al., 2020; Zuo et al., 2018).
In addition to technical and interpersonal skills, personality plays a role in project
manager performance (Bedingfield & Thal, 2008; Denney et al., 2020; Thal &
Bedingfield, 2010). Cohen et al. (2013) found that project managers tend to have unique
traits when contrasted with the rest of the population, such as handling high amounts of
ambiguity. Scholars have found that project managers scored higher on intuitive and
thinking traits than others in the population (Leybourne & Sadler-Smith, 2006; Ling et
al., 2020). These findings align with other studies that suggest that project managers often
rely on their intuition in uncertain situations (Cohen et al., 2013).
The literature is clear that effective project managers require interpersonal skills,
project management skills, and business acumen (Cheng et al., 2005; Gillard, 2009;
Jewell et al., 2020). Project managers must possess flexibility throughout the project life
cycle and be responsive to stakeholders (Matturro et al., 2019). However, there is no
guarantee of project success without a competent project manager who knows what
knowledge and interpersonal skills to use to promote overall project success (do Vale et
al., 2018; Jena & Satpathy, 2017; Sanchez & Terlizzi, 2017). Alvarenga et al. (2019)
29
argued that a competent project manager would know when to use leadership skills,
communication, problem-solving rather than financial acumen, scheduling, and quality
management. Later literature highlights the positive outcomes when project managers
combine proven project management techniques with superior interpersonal skills
(Henkel et al., 2019; Jones et al., 2018; Putra et al., 2020).
Katz Three Skills of Effective Administrators Model of Leadership
Katz (1991), one of the forerunning researchers of managerial skills, proposed
that effective administrators possess three developable skills that focus on what ideal
leaders do rather than on what leaders are. The Katz model of leadership assumes that
developing the core three administrator traits would preclude the need for identifying
specific traits. The three skills of effective administrators approach applies those who (a)
direct the activities of others and (b) assume the responsibility for achieving certain
objectives through those efforts (Floris et al., 2020; Katz, 1991). Katz (1991) described
the human skill as working effectively as a group member and building cooperation
within their teams. Katz characterized conceptual skill as the capability to envision the
enterprise as a whole including recognizing the dependencies between various parts of
the enterprise. Katz defined technical skill as specialized knowledge, analytical
capability, and tools and technique proficiency within that discipline. The Katz’s
leadership model has been adapted by other scholars to develop conceptual models
including El-Sabaa’s (2001) project manager competencies model used in this study.
30
El-Sabaa Model of Project Manager Skills
El-Sabaa (2001) developed a conceptual framework based on Katz’s (1991) three
skills of effective administrators model of leadership. El-Sabaa clustered 18 project
manager characteristics into the following three main categories: human skill, conceptual
and organizational skill, and technical skill. Each of the skill categories represent the
best-in-class personal traits, characteristics, and competencies of the project managers.
Project Manager Human Skill
El-Sabaa described project manager human skills as the ability for a project
manager to lead, work collaboratively with others, and participate in groups. El-Sabaa
also identified that project managers with proficient human skills would be sufficiently
sensitive to the needs and motivations of sponsors, project team members, and
stakeholders. In addition to sensitive to the needs of others, Ahmed and Anantatmula
(2017) argued that project managers must develop trust among their project team
members and demonstrate trusting behaviors with stakeholders to promote project
success. Along with being trustworthy, El-Sabaa argued that project managers with
strong human skill must possess the self-awareness to recognize their own point of view
and emotions related to human activity. For example, Dulewicz and Higgs (2004)
identified three project manager leadership dimensions: emotional, managerial, and
intellectual. Of the three project manager dimensions Dulewicz and Higgs found self-
awareness was the most related to job performance, which aligns with El-Sabaa and other
studies (Gong et al., 2019). Project managers with highly developed human skills tend to
possess the self-awareness and self-esteem communicate and influence constructively
31
across all levels of an organization, leading to greater project success (Gunter, 2020;
Katz, 1991).
Silva (2016) described the human skill of leadership as a process of influence. A
significant part of project managers’ leadership role includes motivating, influencing, and
mobilizing team members, stakeholders, and vendors to drive project performance
(Karlsen & Berg, 2020; Müller & Turner, 2007; Sankaran et al., 2019). Several studies
found that project manager’s ability to work with people are the most critical competency
for influencing project success (Liu et al., 2019; Maqbool et al., 2017; Raziq et al., 2018).
According to El-Sabaa (2001), effective project managers are leaders who can mobilize
their subordinates’ mental and emotional energy, which is linked to project success. For
example, project managers who score high on human skills can build trust fosters a
team’s willingness to accomplish tasks, which positively influences project performance
(Boyatzis et al., 2019; Cleveland & Cleveland, 2020; Rezvani et al., 2018). Some
researchers found that leadership competency such as delegating correlated with project
success, suggesting that an effective leader may be less likely to be a poor project
manager (Dulewicz & Higgs, 2004). Research has shown that relating behaviors are the
most critical project manager competency (Nicholas & Steyn, 2008). Turner et al. (1999)
identified seven personal leadership characteristics for effective project managers: (a)
problem-solving ability, (b) result orientation, (c) energy and initiative, (d) self-
confidence, (e) perspective, (f) communication, and (g) negotiation skills. Other studies
have been done to understand the effect of project managers’ human skills on project
32
success (Afzal et al., 2018; Ahmed & Anantatmula, 2017; Clarke, 2010; Maqbool et al.,
2017; Sergey et al., 2019; Yang et al., 2021).
The literature is clear that a competent project manager must possess adaptable
human skills, including managing their emotions in various project situations
(Ballesteros-Sánchez et al., 2017; de Rezende & Blackwell, 2019). Researchers
discovered that emotional dimensions such as self-awareness and political sensitivity are
important to effective project management leadership and project success (Dulewicz &
Higgs, 2004). For example, political sensitivity influences decision making, which is a
significant part of a project manager’s role (Katz, 1991; Khosravi et al., 2020; Livesey,
2017; Zhang et al., 2018). El-Sabaa (2001) found that human skills, including managing
emotions ranked as the most important project manager skill among the 126 project
managers who were asked to rate the most important skills for the ideal project manager.
Project Manager Conceptual and Organizational Skill
El-Sabaa (2001) described the conceptual and organization skill as a project
manger’s ability to think of the project as a whole. The conceptual and organization skill
includes recognizing how the various components of a project are interdependent and
how this interdependence reaches to the community, political, economic, and social
domains (Chen et al., 2019; Gray & Ulbrich, 2017). El-Sabaa argued that an effective
project manager could visualize the relationship between an individual project and the
parent organization. Project managers would use their conceptual and organizational skill
to plan and organize the project in a way that benefits the project and the organization
(El-Sabaa, 2001; Horváth, 2019). In addition to the planning and organization skill,
33
project managers with strong conceptual and organizational skill have strong goal
orientation and problem orientation, which have been linked to project success (Krchová,
2019; Novo et al., 2017).
Project Manager Technical Skill
El-Sabaa (2001) defined project manager technical skill as the understanding and
specialization in approaches, processes, procedures, and tools. According to El-Sabaa,
effective project managers should have related experience or knowledge of project
management methodology and technology. Studies show such technical skills can be
learned in a classroom setting or on the job (Henkel et al., 2019). In another study,
Starkweather and Stevenson (2011) argued that project managers with and without
project management certification should be able to deliver successful projects. Although
project management approaches and related software is insufficient to guarantee project
success, successful project managers must possess these technical skills to promote
project success (Millhollan & Kaarst-Brown, 2016).
Big Five Personality Traits
The relationship between personality traits and project manager performance has
been studied for two decades (Dvir et al., 2006). Turner and Müller (2006) found that
project managers matched with suitable projects were more effective than project
managers who were mismatched with their work assignments. Sasu (2018) also stressed
the importance of aligning project managers’ characteristics with specific project features
to achieve greater project success. Although there are several personality measures, the
Big Five personality traits framework has been used in various studies to evaluate the
34
relationship between project manager personality and overall project results (de Moura et
al., 2019; Gray & Ulbrich, 2017; Hassan et al., 2017).
The five fundamental dimensions of personality are extraversion, agreeableness,
openness to experience, conscientiousness, and neuroticism (Kutta et al., 2020; Oshio et
al., 2018; Stajkovic et al., 2018). This five-factor model surfaced when two researchers
concluded that five factors explained most of human behavior (Goldberg, 1993; Tupes &
Christal, 1992). Before the five-factor personality framework was operationalized, Cattell
(1943) reduced the number of adjectives, eliminated synonyms, and developed the self-
report Sixteen Personality Factor Questionnaire. Although there has been criticism that
the Big Five Personality traits framework may omit some personality traits, the
framework has been used consistently to measure personality traits among project
managers (Digman, 1990; Goldberg, 1993; Mount & Barrick, 1998; Noor et al., 2020).
Elements of the Big Five Personality
Traits
Despite a hiatus in the research and questions about its predictive power, the Big
Five personality traits framework has been used consistently to assess the personality
traits of leaders, including project managers who are a specific type of leader (Do &
Minbashian, 2020; Hogan et al., 1994; Pelt et al., 2017). Using different methods, four
sets of researchers have identified the same five personality traits with somewhat
different names and definitions (Cattell, 1943; Costa & McCrae, 1985; Goldberg, 1993;
Tupes & Christal, 1992). The Big Five Personality traits framework has been used to
explore the impact of project manager personality on job performance and overall project
35
success in different settings and across different cultures (Choudhry & Zafar, 2017; Vo et
al., 2019; Zheng et al., 2020).
Extraversion. Extraversion is characterized by warmth, sociability, assertiveness,
excitement-seeking, and dominance (Aretoulis et al., 2017; Hassan et al., 2017).
Extraverted individuals tend to demonstrate dominance and action orientation (Spark &
O’Connor, 2020; Tran et al., 2020; Wihler et al., 2017). Those who score high on
extraversion appear ambitious and often seek opportunities for visibility (Greif et al.,
2019; Saatci & Ovaci, 2020). Compared to more introverted individuals, extraverted
people may seem to dominate team settings (Henkel et al., 2019). Aretoulis et al. (2017)
found that extraverted project managers can work with teams and motive them to desired
performance. These findings align with other studies that report extraverted project
managers are associated with team performance and project success (Bradley & Hebert,
1997; Masood et al., 2018; Thal & Bedingfield, 2010; Wang & Li, 2009).
Agreeableness. Agreeableness is characterized by kindness and an optimistic
view of human nature, which is important in complex and volatile work environments
such as project management offices (Miralam et al., 2020). Agreeable individuals seek
social harmony, are sympathetic, engender trust, and are helpful to others (Conard, 2020;
Sutin et al., 2020; Tobin & Graziano, 2020). The agreeableness trait has been associated
with a preference for cooperation, collaboration, and acceptance of others (Collodi et al.,
2020; Khan, 2021; Proto et al., 2019). Conversely, disagreeable individuals may be
perceived as skeptical, unfriendly, and generally unconcerned about others (Barlett &
Anderson, 2012; Hofmann & Jones, 2005; Joseph & Zhang, 2021). Agreeable project
36
managers can build trust and establish collaborative work environments, which has been
linked to project success (Aronson, 2018; Gunter, 2020; Ling et al., 2020). de Moura et
al. (2019) argued that building trust is an essential trait for successful project managers
because it is related to superior leadership outcomes. Agreeable project managers tend to
be transformational leaderships capable of achieving effective job performance (Ding et
al., 2017; Jiang et al., 2017; Shokory & Suradi, 2018). These findings are like those
reported by other researchers (Aga et al., 2016; Bond-Barnard et al., 2018; Urton &
Murray, 2021).
Openness to Experience. The openness to experience trait is characterized by
curiosity, aesthetics, ideas, and imagination (Forthmann et al., 2018; McCrae, 1993; Tan
et al., 2019; Zhang et al., 2019). Compared to individuals who score low on openness to
experience, these individuals appear to be more aware of their feelings and creative
(Furtner et al., 2018; Naz & Khan, 2018). Although some studies did not show openness
to experience as a strong predictor of performance, the trait has been linked to leader
performance and team outcomes (Bell, 2007; Deinert et al., 2015). Individuals who score
higher on openness to experience tend to demonstrate intellectual curiosity, a general art
appreciation and are willing to explore novel ideas (Silvia & Christensen, 2020; Sobkow
et al., 2018; Xu et al., 2021). Project managers who score high on openness to experience
are more innovative leaders who can solve problems leading to project success (Hachana
et al., 2018; Martin et al., 2018; Thal & Bedingfield, 2010).
Conscientiousness. Those conscientious are described as dependable, persistent,
and self-disciplined (Babcock & Wilson, 2020; Shahzad et al., 2020; Topino et al., 2021).
37
Individuals who score high on conscientiousness tend to be more goal-oriented and
organized than others who score lower on this trait (Kim & Rho, 2017; Mansour et al.,
2021; Sarhangpour et al., 2018). Managers high in conscientiousness demonstrate a
greater control over their environments and engender the same quality in their teams
(Peterson et al., 2003). Aronson et al. (2006) argued that project managers high in
conscientiousness would experience greater success, supported by findings that suggest
that conscientiousness is the primary predictor of project success (Aretoulis et al., 2017;
Masood et al., 2018; Thal & Bedingfield, 2010).
Neuroticism. Neuroticism or emotional instability is the propensity to experience
negative emotions such as anger, anxiety, or depression (Ahmad & Khan, 2019; Martin et
al., 2000; Zajenkowski & Gignac, 2018). Individuals who score high on neuroticism may
demonstrate irritability, recklessness, and impulsiveness (Hassan et al., 2017; Mao et al.,
2018; Sindermann et al., 2020). Conversely, those who score low on neuroticism are
generally emotionally stable, positive, and self-confident (Hussein, 2017; Ling et al.,
2020; Stieger et al., 2020). Leaders who demonstrate the neuroticism trait tend to be
vulnerable to organizational stress, overact to situations leading, and create poor
performance outcomes (Bertsch et al., 2017; Miralam et al., 2020; Shahzad et al., 2020).
Neuroticism is also connected to a cynical view of work, which decreases creativity and
hinders leadership ability (Guo et al., 2017; Kolawole et al., 2020; Noor & Esa, 2021).
The literature is clear that project managers who score higher on neuroticism can
negatively influence leadership outcomes, team performance, and overall project success
(Boudreau & Anis, 2020; Kolawole et al., 2020; Sadeh & Dvir, 2019).
38
Work Experience
Tesluk and Jacobs (1998) argued that work experience should include measures
for tenure, amount, and nature of work. Work experience has been defined as the time
spent in a specific job or the number of times a certain task has been completed
(Quińones et al., 1995). For example, tenure would be the number of years an individual
spends in the project manager role and amount is the number of projects worked by an
individual (Noor et al., 2020; Tesluk & Jacobs, 1998). The tenure view of work
experience assumes that individuals accumulate job-related knowledge, skills, and
abilities over time (Quińones et al., 1995; Tesluk & Jacobs, 1998; Van Iddekinge et al.,
2019).
Some scholars contend that tenure does not account for the contextual nature of
work experience (Srikanth, 2020; Tesluk & Jacobs, 1998). For example, experiential
learning theorists argue that individuals learn more from the nature of their work
experience rather than tenure and amount of work (Kolb, 2014; McCauley et al., 1994).
However, Chen et al. (2019) and El-Sabaa (2001) discussed that project manager
competency takes tenure, or time in a project manager specific role. Although tenure does
not include the amount or context of work completed, tenure provides sufficient insight
into work experience for this study (Dragoni et al., 2011; Ford et al., 1992; Noor et al.,
2020; Tesluk & Jacobs, 1998; Van Iddekinge et al., 2019).
Studies have shown that tenure, or time spent in a role can lead to work density
(Srikanth, 2020; Tesluk & Jacobs, 1998). Density of work experience has been described
as a “developmental punch” derived from various challenges encountered on the job
39
(Tesluk & Jacobs, 1998). Density of work experience has been characterized as those
experiences likely to have a dramatic effect on career trajectories such as learning,
motivation, and performance (Tesluk & Jacobs, 1998). Srikanth (2020) defined density of
work experience as the product of various roles such as individual contributor, team lead,
and manager and the corresponding time spent in those roles across the challenging work
activities throughout a person’s career.
The density of work experience view of work experience assumes that project
managers have sufficient tenure in a project manager role to consistently engage in
challenging work, which tends to lead to project success and promotion (Chen et al.,
2019; El-Sabaa, 2001; Gewanlal & Bekker, 2015). Research has revealed that density of
work experience can have a profound effect on job performance (Kolz et al., 1998; Noor
et al., 2020; Srikanth, 2020). For instance, some scholars have argued that most
challenging projects should be reserved for the individuals the most likely to use time in
role to grow their competencies (Ahmed & Philbin, 2020; Chen et al., 2019; De Pater et
al., 2009; Dragoni et al., 2009; Hughes et al., 2020; Wen & Qiang, 2019). In another
study, Ramazani and Jergeas (2015) found that diverse project manager work experience
gained over time was related to project success. Gewanlal and Bekker (2015) argued that
project manager wide-ranging experience qualifications significantly affected project
success. In another study, Edum-Fotwe and McCaffer (2000) found that practical and
varied project management experience is the most vital requirement for improving
project manager performance.
40
Scholars tend to agree that tenured project managers receive more diverse and
challenging experiences resulting in greater competence and work experience than
project managers whose lack of tenure affords them fewer opportunities for various
challenging work experiences (Ford et al., 1992; Schmidt & Hunter, 2004). Research has
shown that more time on the job exposes project managers to greater opportunities for the
density of work experience which could lead to greater performance (Noor et al., 2020;
Srikanth, 2020). Noor et al. (2020) and Srikanth (2020) found that the quality of work
experience can also influence project manager competence and project success. For
example, project managers with density of work experience are more likely to achieve
project success (Luțaș et al., 2020). Conversely, project managers’ work experiences that
lack density will not produce the developmental opportunities that lead to the most
challenging work assignments (Chen et al., 2019; El-Sabaa, 2001).
In addition to the influence tenure, work experience studies acknowledge that
personality, or individual differences may influence work experience outcomes (Barrick
& Mount, 1991; Dragoni et al., 2009). Tesluk and Jacobs (1998) stated that individual
differences provide insight into work experience. Other researchers have found positive
relationships between work experience and individual differences. In one study, Hassan
et al. (2017) found that work experience was significantly correlated with personality.
Other researchers like Barrick and Mount (1991) argued that being open to new
opportunities demonstrates a propensity for learning. Yang (2004) discovered that the Big
Five personality trait openness to experience was linked to applying on-the-job lessons
learned. Henkel et al. (2019) found that project managers who score higher on openness
41
to experience and conscientiousness tend to be motivated to take on developmental
opportunities that enhance work experience. Uppal et al. (2014) argued that individuals
high in openness to experience are more likely to see performance gaps as opportunities
to learn and grow rather than failures. Scholars have also found that individual
differences in openness to experience, and conscientiousness led to persistence, ambition,
hard work, and reliability, linked to job performance over course of a project manager’s
career (Barrick & Mount, 1991; Noor et al., 2020; Srikanth, 2020). The work experience
literature suggests that personality traits such as openness to experience and
conscientiousness have contributed to an individuals’ participation in developmental
activities during their tenure such as problem solving (Barrick & Mount, 1991; Dragoni
et al., 2011; Kolz et al., 1998; Kurz & Bartram, 2002; Srikanth, 2020; Tesluk & Jacobs,
1998).
The literature supports the idea that tenure in a project manager can lead to
growth opportunities that foster greater performance (Noor et al., 2020). For instance,
Gewanlal and Bekker (2015) argued that a project manager would not likely gain
valuable work experience without accrued time engaged in challenging work assignments
that enhance knowledge, skills, and abilities. Also, the work experience literature
suggests a possible relationship between project manager competency, personality,
tenure, and project success (Noor et al., 2020).
Some researchers have studied the moderating effect of work experience (Noor et
al., 2020). In one study including a moderator, Shi and Chow (2015) revealed that prior
work experience moderated the relationship between social commerce trust and
42
electronic word of mouth intention variables. In another study, researchers found that
work experience moderated the relationship between salesperson knowledge and
performance (Matsuo & Kusumi, 2002). On the other hand, some researchers have not
found significant moderating effects from work experience (Noor et al., 2020). Some
researchers argue that individual difference factors account for the difference in job
performance rather than work experience (Borman et al., 1993; Tesluk & Jacobs, 1998).
Despite some findings, there is sufficient evidence to support using work experience as
the moderating variable that could alter the relationship between project manager
competencies and personality and project success.
Project Success
Project success has become a widely discussed topic within scholarly and
business domains. One reason for the increased focus on project success is its link to
organizational productivity, sustainability, and competitive advantage (Pollack et al.,
2018). Researchers have examined project success from various angles, including
benchmarking successful projects, identifying success measures, and investigating
stakeholder management (de Oliveira & Rabechini, 2019; Hughes et al., 2020). Early on,
traditional project success measures were based on the iron triangle of scope, cost, and
time (Azanha et al., 2017; De Wit, 1988; Ogunlana, 2010;). Baker et al. (1988) argued
that meeting schedules, staying within budget, and delivering products are necessary but
not enough to guarantee overall project results. Other researchers found that overall
project success and project management approach are measured differently, which means
43
project success and project management approach should be distinguished (De Wit, 1988;
Ika, 2009).
The literature is clear that the subject of project success is repeatedly examined,
but the evidence is apparent that a comprehensive definition of project success is rarely
realized (De Wit, 1988; Pinto & Slevin, 1988). However, scholars concur that such
factors can influence project success as project type, project size, project team members,
stakeholder expectations, and leadership support (Baccarini, 1999; Dvir et al., 2003;
Prabhakar, 2008). For example, researchers have studied project success among
construction, engineering, software development, and public and private sector projects
(Davis, 2017; Imam & Zaheer, 2021; Kissi et al., 2019; Nanthagopan et al., 2019). He et
al. (2019) researched megaprojects and discovered that the factors related to their success
are different from regular construction projects. The diverse findings support the idea that
there is no universal definition of project success.
Although substantial research has been conducted to isolate critical success
factors for diverse projects, there are contradictory conclusions about which factors result
in project success (Albert et al., 2017; Jugdev & Müller, 2005). However, scholars agree
that project success is influenced by project manager skills and approach (Alvarenga et
al., 2019; Pinto & Slevin, 1988; Podgórska & Pichlak, 2019). Certification is one way to
ensure that project managers acquire the knowledge and skills needed for project success
(Millhollan & Kaarst-Brown, 2016). Many employers desire to hire certified project
managers, pay differentials, and offer more significant promotional opportunities to the
certified (Blomquist et al., 2018). Despite organizations’ affinity for certified project
44
managers, studies do not consistently conclude that certification is a more significant
predictor of favorable project results (Joseph & Marnewick, 2018). For example,
Starkweather and Stevenson (2011) found that a certified project manager is no more
likely to accomplish success than an uncertified project manager. Aranyossy et al. (2018)
argued that the technical skills acquired from obtaining certification are essential to
project success, but advanced skills such as decision making would still be needed to
foster effective project performance. Project management certification is a sign of hard
skills, but it is not a guarantee that the project manager will make the right decisions at
the right time (Davis, 2017; Silvius et al., 2017). Despite ongoing evaluation, scholars
have not agreed on a consistent way to measure the combination of hard skills and soft
skills (Awan et al., 2015).
One limitation of the existing literature is that some studies introduce lists of
criteria without considering time, context, and conditions (Millhollan & Kaarst-Brown,
2016). Jugdev and Müller (2005) argued that information technology project success
should cover the entire project life cycle because perceptions about project success might
not be known until end-users use the new product for a period. Davis (2014) found that
stakeholder role is another condition that could influence perceptions of project success.
Researchers accept that stakeholder expectations can influence project success because
success can mean different things to different people at different times (Chipulu et al.,
2019; Dağlı, 2018). As a result, the subjective notion of project success grew into
categories of factors that could impact project success (Lamprou & Vagiona, 2018).
Freeman and Beale (1992) conceptualized a cluster of seven investment-related factors,
45
which included (a) technical performance, (b) efficiency of execution, (c) stakeholder
satisfaction, (d) project team member personal growth, (e) project termination
completeness, (f) identifying and overcoming technical problems, and (g) project ease of
use and performance.
Researchers have studied project success criteria extensively (Alias et al., 2014;
Frefer et al., 2018; Pacagnella et al., 2019). Stakeholder expectations and project goals
are unique and can influence how project success is measured (Amoatey & Hayibor,
2017; Müller & Jugdev, 2012; Pirozzi, 2018). Shenhar et al. (2001) classified project
success using four overarching factors, including (a) project efficiency, (b) customer
impact, (c) business impact, and (d) preparing for the future. Other researchers developed
project success factors that address overall project outcomes, including costs, benefits
realization, and risks (Keeys & Huemann, 2017; Sanchez & Terlizzi, 2017; Vasista,
2017). Jugdev and Müller (2005) took a time-based approach by grouping success factors
into four eras: (a) 1960s to the 1980s when project success measures focused on project
delivery, (b) 1980s to the 1990s when the focus shifted to factors that must be present, (c)
1990s to the 2000s when meeting stakeholder expectations was the focus, and (d) the 21st
century when stakeholder subjectivity is critical along with addressing project outcomes
from beginning to end.
When project success is discussed, it is often a comprehensive term that includes
overall project results and project management approach, which contributes mixed varied
definitions of project success (Ciric et al., 2021; Jugdev et al., 2013; Ul Musawir et al.,
2017). However, the existing project success literature demonstrates that successful
46
projects meet technical specifications, achieve the mission, and satisfy stakeholder
satisfactions (De Wit, 1988; Orouji, 2016; Millhollan & Kaarts-Brown, 2016). The
results of this project management literature review corroborate the previous findings that
project success means completing all required work on time, within budget, and customer
acceptance (Davis, 2014; He et al., 2018; Pinto & Slevin, 1987).
Summary
Most project success literature has been focused on project management critical
success factors, project management approach, project manager competencies, and
personality traits (Costa & McCrae, 1985; Pinto & Slevin, 1987). Researchers found that
project manager competence is a strong predictor of project success (Alvarenga et al.,
2019). Personality traits also have a substantial effect on project success (Burrell, 2018).
Although the project success documentation highlights project manager competencies
and personality traits as predictors, few studies explain which of these two factors is the
greatest predictor of project success.
Businesses use project management to seize and maintain competitive advantage
(Henkel et al., 2019). Therefore, there is a growing need to hire and engage project
managers with the technical abilities, interpersonal skills, and personal characteristics to
achieve project success (Millhollan & Kaarst-Brown, 2016). This study aimed to help fill
a gap in the literature by examining the effect of project managers’ competencies and
personality traits on project success among project managers at specific career levels. The
results of this study could inform human resource decisions and future project
management certification frameworks. Also, there is an opportunity to align project
47
management training programs with the project manager competencies and personality
traits needed at certain career stages. Chapter 3 contains the methodology and research
design used in this study. The discussion provided the research rationale, the target
population, the participant selection process, the instruments, data collection, and
analysis.
48
Chapter 3: Research Method
Introduction
The purpose of this quantitative nonexperimental study was to provide
information about the relationship between project manager competencies, personality,
and project success by (a) investigating the relationship between project manager
competencies, personality traits, and project success; and (b) identifying whether project
competencies or personality traits is the strongest predictor of project success among
project managers at different work experience levels. A quantitative research design was
suitable for this study, which included evaluating the strength of the association between
the criterion variable and multiple predictor variables. In Chapter 3, I discuss this study’s
research design and rationale, target population, sampling and sampling procedures, and
recruitment and data collection methods. The chapter concludes with instrumentation and
operationalization of constructs, threats to validity, and ethical considerations.
Research Design and Rationale
This study was a cross-sectional non-experimental quantitative research design to
discover the relationship between project manager competencies, personality traits, and
project success when moderated by work experience. Quantitative research is appropriate
to test hypotheses and make significant predictions (Frankfort-Nachmias et al., 2019).
The predictor variables were project manager competencies and personality traits. The
criterion variable was project success. The moderating variable was work experience.
Using a moderating variable is appropriate when seeking to understand how a third factor
changes the relationship between two variables (Frankfort-Nachmias et al., 2019).
49
Kesmodel (2018) stated that a cross-sectional approach is applicable when studying a
particular group to understand how many individuals demonstrate a specific
characteristic, which was the approach in this study.
Methodology
Population
Survey data were collected from project managers using an online survey on the
SurveyMonkey software platform; participants were currently or previously employed in
the role of project manager for 2 years or greater. I used the PMI (n.d.) Sacramento
Valley Chapter membership, which totaled 1,600, as a point of reference for the
population size. Although a minimum of 2 years of experience in a project manager role
was required, no project management certification or PMI membership was required. No
inclusion criteria existed for this study, such as age, race, and gender. I secured adequate
participation in this study.
Sampling and Sampling Procedures
The convenience sampling method was used for this quantitative study to study an
available group of project managers. Convenience sampling techniques are suitable when
testing an entire population is not feasible (Creswell & Creswell, 2017). Convenience
sampling is advantageous when budgets and time are constrained, which was the case
with this study (Creswell & Creswell, 2017). One weakness of the convenience sampling
method is potential researcher bias due to selection subjectivity. However, researcher bias
can be mitigated using the theoretical framework to select participants with the requisite
expertise (Campbell & Stanley, 2015). Another weakness of convenience sampling is that
50
the sample is not representative of the population; therefore, there is less opportunity to
generalize to the population. However, because the sample is a subset of project
managers, the convenience sampling method provided the opportunity to apply some of
this study’s findings to other project managers.
For this study, the target population was 272 project managers currently or
previously employed as a project manager. Fitzner and Heckinger (2010) argued that an
adequate sample size optimizes time and cost while producing useful research findings.
Sample size was calculated using Qualtricks software. The required sample size for this
study was 150 participants using 95% confidence level with a 5% margin of error.
Procedures for Recruitment, Participation, and Data Collection
I solicited participants through social media websites, including LinkedIn,
Facebook, and Amazon Mechanical Turk. In addition, I emailed the PMI leader to
request permission to solicit participation through their membership. PMI did not permit
member solicitation; therefore, I did not pursue that participant recruitment option
further. Self-selection allowed convenience for the participants and helped manage my
cost as the researcher. I collected participants’ age, gender, and years of experience with
a demographic questionnaire (Appendix A).
After participants accessed the survey link, they received an informed consent
form including the study’s eligibility requirements to participate, a voluntary
participation agreement, and certification they currently work as a project manager or
have previously worked as a project manager for 2 or more years. Participants were also
informed that their responses would be anonymous and that they could stop the survey at
51
any time. The consent form stated that participants’ responses would be anonymous, that
no compensation would be given, and an estimated time commitment of 30–40 minutes
and explained they could exit the survey whenever desired with no debriefing. The
survey concluded with a statement of thanks for the participants’ time and contribution to
this study after which the participants were directed to an exit page. Participants were
directed to an exit page if consent was not given.
Initially, data were collected to achieve 150 participants who used an electronic
survey on the SurveyMonkey website. I posted the survey link to LinkedIn and Facebook
platforms. In addition to using social media, the survey link was posted on the Amazon
Mechanical Turk website. Participant details remained anonymous.
Instrumentation and Operational at Constructs
The instruments selected for this study included a demographic questionnaire, El-
Sabaa’s (2001) adapted version of Katz’s (1991) three skills of effective administrators
measure, the Big Five Personality Trait Short Questionnaire, and the Project
Implementation Profile measure. The estimated time to complete the entire survey was
30–45 minutes.
Work Experience
Participants included project managers from various industries and private and
nonprofit sectors. Tenure, or the project manager’s years of experience, was the
moderator in this study. The project managers’ years of experience were classified as
follows: (a) 2–5 years, (b) 6–10 years, (c) 11–15 years, (d) 16–20 years, and (e) over 20
years.
52
Three Skills of Effective Administrators Measure
El-Sabaa (2001) conceived a project manager competency framework by adapting
Katz’s (1991) three skills of effective administrators measure to study the skills and
career path of the ideal project manager working in Egypt. The three skills of effective
administrators measure was an acceptable instrument for this study because it was used to
measure project managers’ perceptions of the importance of a list of project manager
competencies in their current or past job. El-Sabaa argued that the ideal project manager
would possess 18 essential project manager skills that could be group into Katz’s three
categories: (a) human skills, (b) conceptual and organizational skills, and (c) technical
skills. The measure was administered online through SurveyMonkey, and the time to
complete this measure was approximately 15 minutes (Chen et al., 2019). I received
permission from Elsevier to use the adapted three skills of effective administrators
measure (Appendix C). Chen (2019) used El-Sabaa’s model and reported Cronbach’s α
of the questionnaire data as 0.933, indicating that items on the questionnaire met internal
validity. This measure has been used in previous studies with project manager
populations (Chen et al., 2019). Project manager competencies have been associated with
project success, which was the focus of this study (Alvarenga et al., 2018).
The scoring for the El-Sabaa (2001) project manager competency questionnaire
was a five-point scale that estimated the importance of each job-related project manager
competency. A sample item from this 25-item questionnaire is: “How important is
communication to doing your job well?” The importance was estimated using a Likert
53
ordinal scale ranging from 1 to 5, with 1 meaning least important and 5 meaning most
important.
Big Five Personality
Trait Short Questionnaire
The Big Five Personality Trait Short Questionnaire was developed by Morizot in
2014 to examine construct validity of a short self-report scale to measure the Big Five
personality traits among adolescents (2014). Ortet et al. (2017) explored the psychometric
properties of this scale, used the scale with adults, and found it suitable for use with an
adult population. The Big Five Personality Trait Short Questionnaire was a suitable
measure for this study because it was used to measure five broad dimensions of
personality that provide adequate confidence and strength in personality analyses. This
scale measures the five broad categories of personality: (a) extraversion,
(b) agreeableness, (c) openness to experience, (d) conscientiousness, and (e) neuroticism
(Costa & McCrae, 1985). The test content was used for research and educational
purposes without seeking written permission and was administered through the
SurveyMonkey platform and the Amazon Mechanical Turk website (Morizot, 2014;
SurveyMonkey, n.d.). The time to complete the Big Five Personality Trait Short
Questionnaire was approximately 15 minutes. According to Ortet (2017, p. 10), the
coefficient alphas ranged from .75 to .85 and test-retest correlations ranged from .72 to
.93 (p < .001). Personality has been linked to project success, which was the focus of this
study (Moura et al., 2019).
The Big Five Personality Trait Short Questionnaire has 50 items, 10 for each trait.
A sample item from this 50-item questionnaire is: “I see myself as someone who has a lot
54
of imagination.” Participants used a 5-point Likert ordinal scale (totally disagree = 1,
disagree a little = 2, neutral opinion = 3, agree a little = 4, totally agree = 5). Twenty-one
of 50 items were reverse coded, including the following example: “I see myself as
someone who is reserved or shy, has difficulty approaching others.”
Project Implementation Profile Measure
Pinto and Slevin (1988) developed the Project Implementation Profile in 1988 to
measure project success. Pinto and Slevin (1986) developed a diagnostic instrument for
project managers including the following 10 critical success factors: (a) project mission,
(b) top management support, (c) project schedule/plan, (d) client consultation,
(e) personnel, (f) technical tasks, (g) client acceptance, (h) monitoring and feedback,
(i) communication, and (j) troubleshooting. The Project Implementation Profile was an
appropriate measure for this study because measuring project success was the focus of
this study. The Project Implementation Profile was administered electronically on the
SurveyMonkey platform. The estimated time to complete this scale was approximately 10
minutes. I received permission from Dr. Pinto and Dr. Slevin to use the Project
Implementation Profile in my research (Appendix B). In a study conducted by Mazur et
al. (2014) the coefficient alpha was .93. The Project Implementation Profile has been
used in studies with project managers (Pinto & Prescott, 1988; Pinto & Slevin, 1987).
The Project Implementation Profile scoring was a seven-point scale that estimated
the importance of each job-related project manager competency. A sample item from this
25-item questionnaire is: “How important is communication to doing your job well?” The
55
rating for each question was measured using a Likert ordinal scale ranging from 1 to 7,
with 1 meaning strongly agree and 7 meaning strongly disagreed.
Data Analysis Plan
In this study, I used simple regression to determine if project success could be
predicted based on project manager competencies, personality, and work experience.
Before conducting the data analysis, I cleaned the data. Data cleaning refers to
procedures for locating and excluding data that could result in distorted data leading to a
Type I or Type II error (Frankfort-Nachmias et al., 2015). I reviewed and removed
improperly formatted, duplicated, incorrect, or incomplete data to ensure study validity.
The data were downloaded from SurveyMonkey and inputted into SPSS 28 to identify
and clean duplicated, inaccurate, and partially completed responses. SPSS allowed me to
evaluate the data for extreme scores, z scores, and normal distribution of scores. I
eliminated incomplete responses to improve the data analysis process.
Research Questions and Hypotheses
The following research questions and hypotheses guided this quantitative study:
RQ1: Do project manager competencies as assessed by the three skills of effective
administrators measure predict project success as assessed by the Project Implementation
Profile measure?
H
0
1: Project manager competencies do not predict project success.
H
a
1: Project manager competencies do predict project success.
RQ2: Do personality traits as assessed by the Big Five personality measure
predict project success as assessed by the Project Implementation Profile measure?
56
H
0
2: Personality traits do not predict project success.
H
a
2: Personality traits do predict project success.
RQ3: Does work experience as assessed by a project manager’s years of
experience predict project success as assessed by the Project Implementation Profile
measure?
H
0
3: Work experience does not predict project success.
H
a
3: Work experience does predict project success.
RQ4: To what extent do project manager competencies as assessed by the three
skills of effective administrators measure and personality traits as assessed by the Big
Five personality measure contribute uniquely to predicting project success as assessed by
the Project Implementation Profile measure?
H
0
4: Project manager competencies and personality traits do not
contribute uniquely to predicting project success.
H
a
4: Project manager competencies and personality traits do contribute
uniquely to predicting project success.
RQ5: Does work experience as measured by a project manager’s years of
experience moderate the relationship between project manager competencies as assessed
by the three skills of effective administrators measure and project success as assessed by
the Project Implementation Profile measure?
H
0
5: Work experience does not moderate the relationship between project
manager competencies and project success.
57
H
a
5: Work experience does moderate the relationship between project
manager competencies and project success, such that the relationship between
project manager competencies and project success will be more strongly positive
at greater project manager years of experience than at lower project manager
years of experience.
RQ6: Does work experience as measured by a project manager’s years of
experience moderate the relationship between personality traits as assessed by the Big
Five personality measure and project success as measured by the Project Implementation
Profile measure?
H
0
6: Work experience does not moderate the relationship between
personality traits and project success.
H
a
6: Work experience does moderate the relationship between personality
traits and project success, such that the relationship between personality traits and
project success will be more strongly positive at greater project manager years of
experience than at lower project manager years of experience.
Detailed Analysis Plan
SPSS 28 was used to test this study’s hypotheses. SPSS was used to perform
regression analysis to investigate the relationship between the variables and to compute
demographics. Survey responses were scored and used to conduct the data analysis.
Simple linear regression and hierarchical multiple regression were used to investigate
project manager competencies and personality traits to determine which of these two
factors is the greatest predictor of project success. Simple regression was used to assess if
58
project manager competencies predict project success, if personality traits predict project
success, and if work experience predicts project success.
I used hierarchical multiple regression to assess how project manager
competencies and personality contribute uniquely to predicting project success when
moderated by work experience (Hayes, 2017). Inputting predictor variables in a specific
order will determine the additional importance one or more predictor variables have on
the criterion variable, which was the aim of this study (Williams et al., 2020). After mean
centering with SPSS, I performed the hierarchical multiple regression in steps. First, I
entered the criterion variable (project success). Next, I entered the predictor variables
(project manager competencies, personality traits) to ensure that the predictor variables
did not explain away the magnitude of work experience’s effect on project success
(Hayes, 2017). Lastly, I entered the moderating variable (work experience, project
manager’s years of experience), which enabled me to analyze the moderation effect
(William et al., 2020).
Threats to Validity
External Validity
External validity addresses the extent to which research findings can be
generalized to the other population and at other times. (Frankfort-Nachmias et al., 2015).
Threats to external validity could include selection bias or participants learning
something from a pre-test that influences their interaction with a subsequent test
(Creswell & Creswell, 2017). One external threat to the validity of this study was the use
of the convenience sampling method due to the potential for researcher bias. However,
59
convenience sampling is appropriate when a researcher seeks to study a specific group of
experts within a population instead of studying a randomly sampled group of individuals,
which was the aim of this study (Creswell & Creswell, 2017). A second threat to external
validity was the lack of a representative sample given the convenience sampling method.
However, this study’s convenience sample was project managers, which allows the
research findings application in other settings involving project managers.
Internal Validity
Results could be attributed to chance when a study lacks internal validity
(Campbell & Stanley, 2015). Internal validity addresses the extent that an instrument
measures an intended construct (Creswell & Creswell, 2017). I minimized threats to
content validity using instruments with known construct validity and assessed Cronbach’s
alpha.
Ethical Procedures
I considered ethical procedures for this study, including consent, privacy and
confidentiality, human relations, and record-keeping (American Psychological
Association, n.d.). First, I received permission to conduct this study through the Walden
IRB. Second, participation was voluntary, anonymous, and confidential. I did not request
participants’ personal information. I provided informed consent to ensure that
participants understood their voluntary involvement and that they could discontinue
participation at any stage before the study began. There were no power relationships,
given that participation is anonymous and confidential. I kept all data private and
confidential from beginning to end. The data were stored safely on a password-protected
60
computer locked in my home office. No other user could access the computer where the
private and confidential data were stored. I established a mechanism to keep data secure
for seven years before deletion.
Summary
The purpose of this quantitative study was to provide information about the
relationship between project manager competencies, personality, and project success by
(a) investigating the relationship between project manager competencies, personality
traits, and project success; and (b) identifying whether project competencies or
personality traits is the strongest predictor of project success among project managers at
different work experience levels. El-Sabba’s adaption of Katz’s 25-item three skills of
effective administrators instrument measured the project manager competencies variable.
The 50-item Big Five Personality Trait Short Questionnaire assessed personality traits.
The 62-item Project Implementation Profile measured the project success variable.
Project manager’s years of experience) assessed work experience and was the moderating
variable in this study. Using SPSS 28.0, I analyzed demographic statistics. I performed
simple linear regression to assess if project manager competencies predict project
success, personality traits predict project success, and work and experience predict
project success. Then I conducted hierarchical multiple regression to investigate project
manager competencies and personality traits to determine which of these two factors is
the most significant predictor of project success when moderated by work experience
(project manager’s years of experience). I identified ethical considerations, including
voluntary participation, informed consent, privacy, confidentiality, avoiding harm, data
61
collection and storage, and record-keeping. Chapter 4 provides the details of this study’s
data collection, data analysis, and results.
62
Chapter 4: Results
Introduction
The purpose of this quantitative study was to provide information about the
relationship between project manager competencies, personality, and project success by
(a) investigating the relationship between project manager competencies, personality
traits, and project success; and (b) identifying whether project competencies or
personality traits is the strongest predictor of project success among project managers at
different work experience levels. The predictor variables were project manager
competencies and personality traits. The criterion variable was project success. The
moderating variable was work experience.
The following research questions and hypotheses guided this quantitative study:
RQ1: Do project manager competencies as assessed by the three skills of effective
administrators measure predict project success as assessed by the Project Implementation
Profile measure?
H
0
1: Project manager competencies do not predict project success.
H
a
1: Project manager competencies do predict project success.
RQ2: Do personality traits as assessed by the Big Five personality measure
predict project success as assessed by the Project Implementation Profile measure?
H
0
2: Personality traits do not predict project success.
H
a
2: Personality traits do predict project success.
63
RQ3: Does work experience as assessed by a project manager’s years of
experience predict project success as assessed by the Project Implementation Profile
measure?
H
0
3: Work experience does not predict project success.
H
a
3: Work experience does predict project success.
RQ4: To what extent do project manager competencies as assessed by the three
skills of effective administrators measure and personality traits as assessed by the Big
Five personality measure contribute uniquely to predicting project success as assessed by
the Project Implementation Profile measure?
H
0
4: Project manager competencies and personality traits do not
contribute uniquely to predicting project success.
H
a
4: Project manager competencies and personality traits do contribute
uniquely to predicting project success.
RQ5: Does work experience as measured by a project manager’s years of
experience moderate the relationship between project manager competencies as assessed
by the three skills of effective administrators measure and project success as assessed by
the Project Implementation Profile measure?
H
0
5: Work experience does not moderate the relationship between project
manager competencies and project success.
H
a
5: Work experience does moderate the relationship between project
manager competencies and project success, such that the relationship between
project manager competencies and project success will be more strongly positive
64
at greater project manager years of experience than at lower project manager
years of experience.
RQ6: Does work experience as measured by a project manager’s years of
experience moderate the relationship between personality traits as assessed by the Big
Five personality measure and project success as measured by the Project Implementation
Profile measure?
H
0
6: Work experience does not moderate the relationship between
personality traits and project success.
H
a
6: Work experience does moderate the relationship between personality
traits and project success, such that the relationship between personality traits and
project success will be more strongly positive at greater project manager years of
experience than at lower project manager years of experience.
In this chapter, I detail the study’s sample demographic characteristics and data
collection actions and provide an explanation of the data analysis. This chapter also
includes descriptive statistics and detailed information about the results of the study.
Data Collection
Timeframe
Anonymous data collection began on June 1, 2022, after IRB approval (04-20-22-
0431971 expiring on April 19, 2023) to study an available group of project managers.
Originally, I built and posted an online survey with informed consent on the
SurveyMonkey website to collect the data. The estimated data collection period was 30
65
days. I did not collect any distinguishable information from participants. I continued data
collection until I received the target number of participants.
Recruitment and Response Rate
I invited respondents to participate in the study by posting the recruitment
information and the link to the survey on LinkedIn and Facebook platforms. I submitted a
request to the Sacramento Valley Chapter of PMI to share the participant recruitment
information; however, PMI policy did not allow this practice. Participants received
informed consent information after they accessed the survey link. The informed consent
form included the study’s eligibility requirements, a voluntary participation agreement,
and certification they currently work as a project manager or have previously worked as a
project manager for 2 or more years. The informed consent explained that participants’
responses would be anonymous and that they could stop the study anytime. The consent
form also stated there was no compensation, provided the estimated time to complete the
survey, noted the exit procedures, and delivered a thank you. Participants were redirected
to an exit page if they did not provide their consent. The participants were also told they
could access the final study at https://scholarworks.waldenu.edu/dissertations/.
By August 6, only 48 responses had been received on the SurveyMonkey
platform. After a low response rate, I received IRB approval to use Amazon Mechanical
Turk, the Walden Participant Pool website, Twitter and Instagram social media platforms,
and word of mouth to invite additional participants. Upon IRB approval of these
additions, I published the online survey link on Amazon Mechanical Turk. The Amazon
Mechanical Turk posting included a survey description and participation qualifications. I
66
needed to recruit 102 participants to achieve the required sample size. I updated Amazon
Mechanical Turk to allow 132 participants to access and take the survey because a
preliminary assessment revealed several of the previously collected surveys had
significant missing data. One hundred seventy-one additional participants accessed the
study because I incorrectly believed that Amazon Mechanical Turk system would block
access to any participants beyond 132 participants. Each respondent was rewarded $8.00
for participation. I reached the sample size on September 5. The total number of collected
responses was 352. The estimated Amazon Mechanical Turk total cost was $2,784.00 at
the time of writing. I closed the SurveyMonkey survey link on September 5, 2022.
Data Preparation Process
Of the total 352 collected responses, 272 (77%) were used for data analysis,
which meets the required 150 participant size of N = 150 (1 – β = .95). For data cleaning
and screening, I used Microsoft Excel to evaluate the data for missing, inaccurate, or
incomplete responses. I excluded any case where there were missing data for at least one
variable in the analysis, which led to discarding 80 incomplete responses. After the
screening and cleaning process in Microsoft Excel, I uploaded the remaining 272 scores
to SPSS 28 to reverse code 22 questions on the Big Five Personality Trait Short
Questionnaire. Once reverse coding was complete, I used SPSS to perform mean
centering for the project manager competencies and Big Five personality
traits. Hayes
(2017) argued that mean centering makes the regression coefficients more meaningful.
Finally, I investigated and found three outliers using the SPSS explore function. Although
the observations were unusual, I retained the outliers at this stage because these
67
observations could be informative. Moreover, I decided to keep the outliers because I did
not want the model to become illegitimately more predictive than it was by removing the
outliers (Roberts, 2010). This study’s required sample size was 150; therefore, the final
272 participants were sufficient to proceed with the rest of the data analysis process.
Sample Demographic Characteristics
I collected demographic information, including age, gender, and project manager
years of experience. The gender categories were men, women, no specification, or no
reply. The age categories ranged from 18 to 65. Project manager years of experience
categories ranged from 2 years to over 20 years. The study’s demographic information
and distribution were investigated using the SPSS descriptive statistics function. The
sample consisted of 272 participants, 144 men (52.9%) and 128 women (47.1%)
participants (see Table 1), which is comparable to the population of interest. The study’s
statistic for women is higher than the Zippia’s (n.d.), which could be tied to an increase in
diversity, equality, and inclusion efforts (Norberg & Johansson, 2021). According to
Zippia (n.d.), 37.9% of project managers in the United States are women, and 62.1% are
men. The highest number of respondents were in the age range 30–39 (n = 111, 40.8%).
The other age categories were 18–29 (n = 71, 26.1%), 40–49 (n = 48, 17.6), 50–59
(n = 34, 12.5%), and 60–65, (n = 8, 2.9%). The highest number of responses for work
experience (project manager years of experience) category was 2–5 years (n = 125, 46%).
The remaining categories for work experience were 6–10 years (n = 98, 36%), 11–15
years (n = 31, 11.4%), 16–20 years (n = 9, 3.3%), and over 20 years (n = 9, 3.3%).
68
Table 1
Sample Demographics
Demographic variables Respondents
(N = 272)
%
Gender
Women 128 47.1
Men 144 52.9
Age
18–29 71 26.1
30–39 111 40.8
40–49 48 17.6
50–59 34 12.5
60–65 8 2.9
Work experience
2–5 years 125 46
6–10 years 98 36
11–15 years 31 11.4
16–20 years 9 3.3
Over 20 years 9 3.3
Descriptive Statistics
I used SPSS 28 to test the study hypotheses and compute demographics. The
original data analysis plan called for using Hayes’ (2017) PROCESS macro to perform
regression analysis to investigate project manager competencies and personality traits to
determine which of these two factors is the greatest predictor of project success.
However, I opted to use SPSS 28 to conduct all steps of the regression analysis. Table 2
displays the study’s demographic mean, standard deviation, skewness, and kurtosis.
69
Table 2
Study Demographic Mean, Standard Deviation, Skewness, and Kurtosis
Mean Std. dev. Skewness Kurtosis
Gender .47 .50 .119 –2.00
Age 44 1.06 .68 –.25
Work experience 1.82 .98 1.41 1.89
Project manager competencies 17.19 2.44 –1.26 1.89
Big Five personality trait extraversion 37.05 6.38 –.52 1.55
Big Five personality trait agreeableness 33.87 7.02 1.01 –.14
Big Five personality trait openness to experience 39.24 5.11 –1.03 2.07
Big Five personality trait conscientiousness 35.88 7.98 .61 –1.08
Big Five personality trait neuroticism 31.10 8.85 .65 –.62
Project success 61.85 8.49 –1.25 3.80
Test of Assumptions
I tested all related assumptions before performing the hierarchical linear
regression. The first assumption of hierarchical multiple regression requires one
continuous criterion variable. This study’s criterion variable, project success, is an
interval variable that can take an infinite set of values, which satisfies the first
assumption. The second assumption is that two or more independent variables are an
interval or ratio scale (Creswell & Creswell, 2017). This study’s predictor variables,
project manager competencies and Big Five personality traits, are interval variables that
meet the second hierarchical multiple regression assumption.
The remaining six other assumptions of hierarchical multiple regression are used
to validate how well the data fit the hierarchical multiple regression model. The third
assumption is that observations are predictor or unrelated (Hayes, 2017). Therefore, I
used the Durbin-Watson statistic in SPSS to test for first order autocorrelation. I entered
the data in SPSS in the sequence I assumed autocorrelation would occur. Scholars
consider it acceptable to have the Durbin-Watson value of approximately 2 to indicate no
70
correlation between residuals (Subhi & Al Azkiya, 2022). Residuals were predictor as
assessed by a Durbin-Watson statistic of 2.06.
The fourth assumption is a linear relationship between the criterion variable, each
predictor variable, and the criterion variable and the predictor variables collectively. I
tested the linearity between project success (criterion variable) and project management
competencies (predictor variable) and Big Five personality traits (predictor variable) by
generating SPSS scatterplots. The scatterplot presented in Figure 1 shows a horizontal
relationship between project success and the predictor variables collectively. The
scatterplots in Figures 2–8 show moderate to strong linear relationships between project
success and the predictor variables, project manager competencies and Big Five
personality
traits extraversion, agreeableness, openness to experience, conscientiousness,
and neuroticism, and the moderator variable work experience (project manager years of
experience).
Figure 1
Scatterplot of Residuals Showing a Linear Relationship Between Project Success and
Project Manager Competencies and All Big Five Personality Traits
71
Figure 2
Scatterplot of Residuals Showing a Moderate to Strong Linear Relationship Between
Project Success and Project Manager Competencies
Figure 3
Scatterplot of Residuals Showing a Moderate to Strong Linear Relationship Between
Project Success and Big Five Personality
Trait Extraversion
72
Figure 4
Scatterplot of Residuals Showing a Moderate to Strong Linear Relationship Between
Project Success and Big Five Personality
Trait Agreeableness
Figure 5
Scatterplot of Residuals Showing a Moderate to Strong Linear Relationship Between
Project Success and Big Five Personality
Trait Openness to Experience
73
Figure 6
Scatterplot of Residuals Showing a Moderate to Strong Linear Relationship Between
Project Success and Big Five Personality
Trait Conscientiousness
Figure 7
Scatterplot of Residuals Showing a Moderate to Strong Linear Relationship Between
Project Success and Big Five Personality
Trait Neuroticism
74
Figure 8
Scatterplot of Residuals Showing a Moderate to Strong Linear Relationship Between
Project Success and Work Experience, Project Manager Years of Experience
The fifth assumption, homoscedasticity is that the residuals are equal for all
values of the predicted criterion variable (Berry, 1993). Homoscedasticity assumes that
the residuals are equal for all values of the predicted criterion variable (Berry, 1993).
Berry (1993) argued that homoscedasticity exists if the residuals appear randomly
scattered. I used the SPSS scatterplot illustrated in Figure 1 to determine to validate
whether the homoscedasticity assumption was met. The spread of the residuals did not
appear to increase or decrease across the predicted values, nor did they seem to form a
pattern (Berry, 1993). Therefore, I concluded the homoscedasticity assumption was met.
The sixth assumption is that a study’s data must not show multicollinearity or
highly correlated variables. Statisticians argue that multicollinearity can lead to
challenges with interpreting which predictor variable contributes to the variance
explained in the criterion variable and calculating a hierarchical multiple regression
model (Berry, 1993). I used the SPSS Linear Regression function to inspect the
75
correlation coefficients and tolerance/variance inflation factors (VIF) values. I validated
that all correlations were no greater than 0.7 and all the VIF values were less than 10,
demonstrating confidence that there was no collinearity in the study’s dataset
Due to their potential impact on the hierarchical multiple regression analysis, the
seventh assumption indicates there should be no significant outliers, high leverage points,
or highly influential points. I examined the casewise diagnostics and the student deleted
residuals to identify outliers. I assessed the dataset for three identified outlying cases.
Although unusual, I found a plausible pattern to explain two cases. Two participants with
unusually lower ratings of project success consistently selected the rating of 1 when
others chose 7, or they selected 2 when others selected 6, and so on. Understanding the
potential cause of these two outliers will be helpful when interpreting hierarchical linear
regression output. Regarding the third outlying case, the participant’s project success
rating seemed to follow a natural pattern of variation, which I found informative enough
to keep the case in the regression model when testing the outlier assumption (Creswell
and Creswell, 2017).
Scores with high leverage points can adversely impact the eighth assumption.
Scholars consider values less than 0.2 as safe, 0.2 to less than 0.5 as risk, and values
greater than 0.5 as dangerous (Berry, 1993). I used the SPSS Linear Regression function
to check for high leverage points. All three outlying cases had leverage scores lower than
0.2, which satisfied the leverage aspect of the eighth assumption.
I also used the SPSS linear regression function to investigate influence. Experts
suggest exploring Cook’s distance values greater than 1 (Berry, 1993). No Cook’s
76
Distance values were greater than 1 in this study, which satisfies the eighth hierarchical
linear regression assumption.
Lastly, I used the SPSS Normal Q-Q Plot of the studentized residuals (SRE_1) to
test for normal distribution before interpreting the hierarchical linear regression results.
Scholars argue that normally distributed residuals will align along the diagonal line
(Berry, 1993). The Q-Q Plot displayed the residuals close enough to the line to be
considered normal, as illustrated in Figure 5.
Figure 9
Q-Q Plot of Normal Distribution
Data Analysis
Although previously validated, I measured Cronbach’s alpha for each multi-item
instrument used in this study. Reliability is critical to ensure the scale items evaluate the
same underlying construct (Creswell & Creswell, 2017). Table 3 illustrates that all scales
had a high level of internal consistency, as determined by a Cronbach’s alpha of 0.927 or
greater.
77
Table 3
Cronbach’s Alpha of Each Scale
N. scale Mean Std. dev. Cronbach’s alpha
Project manager competencies 18 17.19 2.44 .92
Big Five personality traits 50 17.71 2.67 .95
Project success 62 61.85 8.49 .97
Note. N = 272
Table 4
Pearson Correlations Between the Criterion, Predictor and Moderator Variables
Variables 1 2 3 4 5 6 7 8
Project success Criterion −
Project manager competencies Predictor .70 −
Big Five extraversion trait Predictor .45 .38 −
Big Five agreeableness trait Predictor .22 .15 .28 −
Big Five openness to experience trait Predictor .63 .53 .48 .29 −
Big Five conscientiousness trait Predictor .25 .21 .30 .78 .35 −
Big Five neuroticism trait Predictor .06 .05 .32 .60 .15 .72 −
Work experience Moderator
–.02 –.10 .05 .11 –.02 .12 .18 −
Note. N = 272. *Correlation is significant at 0.05 level (1-tailed); **Correlation is
significant at 0.01 level (1-tailed).
Research Questions and Hypotheses
I used the SPSS 28.0 Linear Regression function to test this study’s hypotheses. I
performed simple regression to assess whether project manager competencies predict
project success, whether personality traits predict project success, and whether work and
experience predict project success. I also completed hierarchical linear regression to
determine if project success could be predicted based on project manager competencies
and personality when moderated by work experience (project manager’s years of
experience). As mentioned earlier, I prepared for the linear regression by downloading
the SurveyMonkey data for 352 participants and inputting it into SPSS to identify
78
duplicate, incomplete, outlying clean scores. I removed incomplete data that could result
in distorted data leading to a Type I or Type II error to ensure the validity of this study
(Frankfort-Nachmias et al., 2015).
As mentioned previously, I performed several procedures including mean
centering to prepare the data for the hierarchical linear regression analysis. Next, I
investigated project manager competencies and personality traits to determine which of
these two factors is the greatest predictor of project success when moderated by work
experience (number of years in a project manager role). Scholars recommend using
hierarchical linear regression, also known as sequential regression, to test the additional
importance of one or more predictor variables in predicting the criterion variable, which
was the focus of this study (Creswell & Creswell, 2017; Hayes, 2017). What follows is
the statistical analysis for each research question and related hypotheses.
RQ1
RQ1: Do project manager competencies as assessed by the three skills of effective
administrators measure predict project success as assessed by the Project Implementation
Profile measure?
The goal of RQ1 was to determine if project manager competencies predict
project success. I used simple regression in SPSS to investigate RQ1. The linear
regression results indicated that project manager competencies statistically significantly
predicted project success, F(1, 270) = 272.19, p < .001. The adjusted R
2
= .50, which
means that project manager competencies accounted for 50% of the variation in project
success, which is a medium size effect according to Cohen (1992). The results confirmed
79
rejecting the null hypothesis and accepting the alternative hypothesis that project
manager competencies predict project success. Table 5 illustrates the simple regression
results for RQ1.
Table 5
Simple Regression Results for All Variables
Variable B SE B β
Adj. R
2
p
Project manager competencies 2.46 .14 .70 .50 <.001
Big Five extraversion trait .60 .07 .45 .20 <.001
Big Five agreeableness trait .27 .07 .22 .04 <.001
Big Five openness to experience trait 1.04 .07 .63 .39 <.001
Big Five conscientiousness trait .26 .06 .25 .05 <.001
Big Five neuroticism trait .06 .05 .06 .01 .26
Work experience –.18 .52 –.02 .01 .72
RQ2
RQ2: Do personality traits as assessed by the Big Five personality measure
predict project success as assessed by the Project Implementation Profile measure?
The aim of RQ2 was to determine if each of the Big Five personality traits
predicts project success. I used simple regression to answer RQ2.
Extraversion. The linear regression results indicated that Big Five personality
extraversion trait statistically significantly predicted project success, F(1, 270) = 69.36, p
< .001. The adjusted R
2
result was .20, which means that the extraversion trait accounted
for 20% of the variation in project success, which is considered a small size effect
(Cohen, 1992). For the extraversion trait, the results supported rejecting the null
hypothesis and accepting the alternative hypothesis that the extraversion Big Five
personality trait predicts project success. Table 5 illustrates the simple regression results
80
for the extraversion Big Five personality trait and the remaining Big Five personality
traits tested for RQ2.
Agreeableness. The linear regression results indicated that Big Five personality
agreeableness trait statistically significantly predicted project success, F(1, 270) = 14.71,
p < .001. The adjusted R
2
result was .04, which means that the agreeableness trait
accounted for 4% of the variation in project success, which is a small size effect (Cohen,
1992). The results supported rejecting the null hypothesis and accepting the alternative
hypothesis that the agreeableness Big Five personality trait predicts project success. The
agreeableness regression results are shown in Table 5.
Openness to Experience. The linear regression results indicated that Big Five
personality openness to experience trait statistically significantly predicted project
success, F(1, 270) = 177.76, p < .001. The adjusted R
2
result was .39, which means that
the openness to experience trait accounted for 39% of the variation in project success,
which is a medium size effect according to Cohen (1992). The results supported rejecting
the null hypothesis and accepting the alternative hypothesis that the openness to
experience Big Five personality trait predicts project success. The openness to experience
regression results are shown in Table 5.
Conscientiousness. The linear regression results indicated that Big Five
personality conscientiousness trait statistically significantly predicted project success,
F(1, 270) = 18.11, p < .001. The adjusted R
2
result was .05, which means that the
conscientiousness trait accounted for 5% of the variation in project success, which is a
small effect size (Cohen, 1992). The results supported rejecting the null hypothesis and
81
accepting the alternative hypothesis that the conscientiousness Big Five personality trait
predicts project success. The conscientiousness regression results are shown in Table 5.
Neuroticism. The linear regression results indicated that Big Five personality
neuroticism trait did not statistically significantly predict project success, F(1, 270) =
1.26, p < .26. The adjusted R
2
result was 0.01, which means that the neuroticism trait
accounted for 0.1% of the variation in project success, which is a small effect size
(Cohen, 1992). The results confirmed accepting the null hypothesis that neuroticism Big
Five personality trait does not predict project success. Table 5 shows the neuroticism
regression results.
RQ3
RQ3: Does work experience as assessed by a project manager’s years of
experience predict project success as assessed by the Project Implementation Profile
measure?
The goal of RQ3 was to determine if work experience (project manager’s years of
experience) predicts project success. I used simple regression in to assess RQ3. The
linear regression results indicated that work experience did not statistically significantly
predict project success, F(1, 270) = .129, p < .720. The adjusted R
2
= -.01, which means
that work experience accounted for 1% of the variation in project success, which is a
small size effect according to Cohen (1992). The results confirmed accepting the null
hypothesis that work experience does not predict project success. Table 5 illustrates the
simple regression results for RQ3.
82
RQ4
RQ4: To what extent do project manager competencies as assessed by the three
skills of effective administrators measure and personality traits as assessed by the Big
Five personality measure contribute uniquely to predicting project success as assessed by
the Project Implementation Profile measure?
RQ4 aimed to determine how project manager competencies and personality traits
contribute uniquely to predicting project success. I used hierarchical regression to
determine the relative contribution of each predictor variable to the total variance
explained for project success (Hayes, 2017). In the first step, I entered project success in
the Dependent (criterion) variable field. Next, I entered project manager competencies
and each standardized Big Five personality trait in the first Independent (predictor)
variable Block.
The hierarchical multiple regression results confirmed that project manager
competencies (β = .49, p < .001), extraversion (β = .13, p < .001), openness to experience
(β = .28, p < .001), and neuroticism (β = -.12, p = .04) predictors contributed to the total
variance explained for project success illustrated in Model 1 in Table 6. However,
agreeableness and conscientiousness did not uniquely contribute to project success.
Therefore, I accepted the alternative hypothesis that project manager competencies,
extraversion, openness to experience, and neuroticism personality traits contribute
uniquely to predicting project success, but I accepted the null hypothesis for
agreeableness and conscientiousness, as found in Table 6.
83
Table 6
Summary of Hierarchical Multiple Regression Analysis for Variables Predicting Project
Success
Variable B SE B
β
R
2
∆
R
2
F p
Model 1 .60 .60 58.47 <.001
Constant 61.858 .32 <.001
Project manager competencies 4.21 .40 .49 <.001
Big Five extraversion trait 1.12 .39 .13 <.01
Big Five agreeableness trait .68 .52 .08 .19
Big Five openness to experience trait 2.43 .43 .28 <.001
Big Five conscientiousness trait .21 .64 .02 .74
Big Five neuroticism trait –1.04 .50 –.12 .04
Model 2 .62 .02 33.67 .02
Constant 61.75 .33 <.001
Project manager competencies 4.03 .40 .47 <.001
Big Five extraversion trait .97 .40 .11 .01
Big Five agreeableness trait .48 .52 .05 .35
Big Five openness to experience trait 2.56 .43 .30 <.001
Big Five conscientiousness trait .37 .63 .04 .55
Big Five neuroticism trait –1.07 .50 –.12 .03
Project manager competencies * Work experience .20 .35 .02 .56
Big Five extraversion trait * Work experience –.11 .06 –.51 .09
Big Five agreeableness trait * Work experience .43 .50 .06 .39
Big Five openness to experience trait * Work experience .05 .07 .25 .49
Big Five conscientiousness trait * Work experience .06 .08 .31 .44
Big Five neuroticism trait * Work experience .29 .56 .04 .59
Note. Model = “Enter” method in SPSS; B = unstandardized regression coefficient; SE B
= standard of the coefficient; β = standardized coefficient; Adjusted (Adj.) R
2
=
coefficient of determination; ∆R
2
= R
2
change.
In addition to assessing how each predictor variable contributed to the total
variance of project success, I used this hierarchical multiple regression to evaluate which
predictor variable is the strongest predictor of project success. The regression results
indicated project manager competencies (β = .49, p < .001) explained 49% of the
variance in project success, which was a stronger predictor of project success than
extraversion (β = .13, p < .001), which explained 13% of the variance in project success,
openness to experience (β = .28, p < .001), which explained 28% of the variance in
project success, and neuroticism (β = -.12, p = .04), which explained 12% of the variance
in project success.
84
The full hierarchical multiple regression model of project manager competencies,
personality traits, and work experience (project manager’s years of experience) to predict
project success was statistically significant, R
2
= .62, F(13, 258) = 33.67,
p < .001, adjusted R
2
= .61. The regression results indicated that adding work experience
(project manager’s years of experience) did improve explaining the variance in project
success (criterion variable) above and beyond project manager competencies and
personality traits (predictor variables). Table 5 includes a summary of all the hierarchical
regression results.
Experts argue that understanding the importance of the added predictor variables
in a hierarchical multiple regression model is more important than predictions (Gelman,
2007). Therefore, I used R
2
to answer RQ4 because R
2
represents the variation in the
criterion variable explained by the predictor variables (Gelman, 2007). However, it is
customary to report the final model coefficients of the hierarchical multiple regression
model. Therefore, Table 5 also includes the coefficients or the change in the criterion
variable (project success) for a one-unit change in the predictor variable (project manager
competencies, personality traits).
RQ5
RQ5: Does work experience as measured by a project manager’s years of
experience moderate the relationship between project manager competencies as assessed
by the three skills of effective administrators measure and project success as assessed by
the Project Implementation Profile measure?
85
For RQ5, I conducted moderation analysis to assess if work experience moderated
the relationship between project manager competencies and project success. Based on
Tesluk and Jacobs’ (1998) theory of work experience, years of experience (tenure) is not
a strong predictor of job performance. However, Tesluk and Jacobs (1998) argued that
competence could sometimes increase over time due to repeated exposure to tasks. First,
I calculated the moderation interaction term using SPSS to compute the product between
project manager competencies and work experience (project manager’s years of
experience) before conducting the regression. Next, I added the moderation interaction
term into the second step of the regression model to determine if work experience
moderated the relationship between project manager competencies and project success.
The full moderated hierarchical multiple regression model of project manager
competencies, work experience (project manager’s years of experience), and the
interaction between project manager competencies and work experience to predict project
success was statistically significant, R
2
= .50, F(3, 268) = 91.58, p < .001, adjusted R
2
=
.50. The final regression results indicated project manager competencies (β = .70, p <
.001) explained 70% of the variance in project success. However, the results revealed that
the interaction between project manager competencies and work experience (β = .04, p =
.33) did not improve in explaining the variance in project success (criterion variable)
above and beyond project manager competencies (predictor variable). Therefore, I
accepted the null hypothesis that work experience would not moderate the relationship
between project manager competencies and project success. Table 7 includes a summary
of the moderated hierarchical regression results for RQ5.
86
Table 7
Summary of Moderated Hierarchical Multiple Regression Analysis for Project Manager
Competencies Predicting Project Success
Variable B SE B β
R
2
∆
R
2
F p
Model 1 .50 .50 136.93 <.001
Constant 61.85 .36 <.001
Project manager competencies 6.06 .36 .71 <.001
Work experience .42 .36 .05 .24
Model 2 .50 .01 91.58 <.001
Constant 61.89 .36 <.001
Project manager competencies 5.98 .37 .70 <.001
Work experience .40 .36 .04 .26
Project manager competencies * Work experience .35 .36 .04 .33
Note. Model = “Enter” method in SPSS; B = unstandardized regression coefficient; SE B
= standard of the coefficient; β = standardized coefficient; R
2
= coefficient of
determination; ∆R
2
= R
2
change.
RQ6
RQ6: Does work experience as measured by a project manager’s years of
experience moderate the relationship between personality traits as assessed by the Big
Five personality measure and project success as measured by the Project Implementation
Profile measure?
I performed moderation analysis to determine if work experience moderated the
relationship personality and project success. To evaluate RQ6, I considered how years of
on-the-job experiences can provide opportunities for project managers to learn more
about their individual patterns of thinking, feeling and behaving, which might improve
job performance (Tesluk & Jacobs, 1998).
Like RQ5, I calculated the moderation interaction term using SPSS to compute
the product between the Big Five personality traits and work experience (project
87
manager’s years of experience) for each of the five personality dimensions before
conducting the five separate regressions. Then, I added the moderation interaction term
into the second step of the regression model to determine if work experience moderated
the relationship between each of the Big Five personality traits and project success. The
full moderated hierarchical multiple regression model of Big Five personality traits, work
experience (project manager’s years of experience), and the interaction between Big Five
personality traits and work experience to predict project success was statistically
significant, R
2
= .47, F(11, 260) = 21.53, p < .001, adjusted R
2
= .45.
Extraversion. The final regression results indicated extraversion (β = .20, p <
.001) explained 20% of the variance in project success and the results were statistically
significant. However, the results showed that the interaction between extraversion and
work experience (β = -.63, p = .08) did not improve in explaining the variance in project
success (criterion variable) beyond extraversion (predictor variable). Therefore, I
accepted the null hypothesis that work experience would not moderate the relationship
between extraversion and project success. Table 8 includes a summary of the moderated
hierarchical regression results for extraversion.
88
Table 8
Summary of Moderated Hierarchical Regression Analysis for Big Five Personality Traits
Predicting Project Success
Variable B SE B
β
R
2
∆
R
2
F p
Model 1 .44 .44 35.13 <.001
Constant 17.70 3.35 <.001
Big Five extraversion trait .30 .07 .23 <.001
Big Five agreeableness trait .06 .09 .05 .48
Big Five openness to experience trait .82 .09 .49 <.001
Big Five conscientiousness to trait .11 .09 .10 .22
Big Five neuroticism trait -.18 .06 -.19 <.01
Work experience -.30 .40 .01 .94
Model 2 .47 .03 21.53 <.001
Constant 26.67 8.88 <.01
Big Five extraversion trait .26 .07 .20 <.001
Big Five agreeableness trait .03 .08 .02 .71
Big Five openness to experience trait .84 .09 .50 <.001
Big Five conscientiousness trait .14 .09 .13 .12
Big Five neuroticism trait -.19 .06 -2.05 <.01
Work experience -4.46 4.49 -.51 .32
Big Five extraversion trait * Work experience -.13 .07 -.63 .08
Big Five agreeableness trait * Work experience .58 .59 .09 .33
Big Five openness to experience trait * Work experience .10 .09 .50 .23
Big Five conscientiousness trait *work experience .13 .10 .62 .19
Big Five neuroticism trait * Work experience -.15 .65 -.02 .81
Note. Model = “Enter” method in SPSS; B = unstandardized regression coefficient; SE B
= standard of the coefficient; β = standardized coefficient; Adjusted (Adj.) R
2
=
coefficient of determination; ∆R
2
= R
2
change.
Agreeableness. The final regression results indicated agreeableness (β = .02, p =
.71) explained 2% of the variance in project success and the results were not statistically
significant. Moreover, the results showed that the interaction between agreeableness and
work experience (β = .09, p = .33) did not improve in explaining the variance in project
success (criterion variable) beyond agreeableness (predictor variable). Therefore, I
accepted the null hypothesis that work experience would not moderate the relationship
between agreeableness and project success. Table 8 includes the moderated hierarchical
regression results for agreeableness.
89
Openness to Experience. The final regression results indicated openness to
experience (β = .50, p < .001) explained 50% of the variance in project success and the
results were statistically significant. However, the results showed that the interaction
between openness to experience and work experience (β = .50, p = .23) did not improve
in explaining the variance in project success (criterion variable) beyond openness to
experience (predictor variable). Therefore, I accepted the null hypothesis that work
experience would not moderate the relationship between openness to experience and
project success. Table 8 includes the moderated hierarchical regression results for
openness to experience.
Conscientiousness. The final regression results indicated conscientiousness (β =
.13, p = .12) explained 13% of the variance in project success and the results were not
statistically significant. Moreover, the results showed that the interaction between
conscientiousness and work experience (β = .62, p = .19) did not improve in explaining
the variance in project success (criterion variable) beyond conscientiousness (predictor
variable). Therefore, I accepted the null hypothesis that work experience would not
moderate the relationship between conscientiousness and project success. Table 8
includes the moderated hierarchical regression results for conscientiousness.
Neuroticism. The final regression results indicated neuroticism (β = -20, p =.04)
explained 20% of the variance in project success and the results were statistically
significant. However, the results showed that the interaction between neuroticism and
work experience (β = -02, p = .81) did not improve in explaining the variance in project
success (criterion variable) beyond neuroticism (predictor variable). Therefore, I accepted
90
the null hypothesis that work experience would not moderate the relationship between
neuroticism and project success. Table 8 includes the moderated hierarchical regression
results for neuroticism.
Summary and Transition
The purpose of Chapter 4 was to investigate the relationship between project
manager competencies, personality traits, and project success and assess any interaction
when work experience (project manager’s years of experience) was added to the
regression model. This chapter included the data collection and participant recruitment
processes and IRB-approved modifications. As designed, I used IBM SPSS Version 28.0
to perform simple regression to assess the data, validate assumptions, and answer RQ1,
RQ2, and RQ3. The results indicated that project manager competencies and the Big Five
personality traits, extraversion, agreeableness, openness to experience, and
conscientiousness, statistically significantly predicted project success. However, the
results indicated the Big Five personality trait neuroticism and work experience (project
manager’s years of experience) did not predict project success.
Also, this chapter explained that project manager competencies and the Big Five
personality traits, extraversion, openness to experience, and neuroticism, each uniquely
contributed to predicting project success; however, agreeableness and conscientiousness
did not. The results also revealed that project manager competency is a stronger predictor
of project success than all the Big Five personality traits. Lastly, this chapter’s
moderation analysis confirmed that work experience (project manager’s years of
experience) did not moderate the relationship between project manager competencies and
91
project success. The results also showed that work experience did not moderate the
relationship between any of the Big Five personality traits. Therefore, Chapter 4 provided
answers to RQ4, RQ5, and RQ6.
Chapter 5 provides an interpretation of the study findings. In Chapter 5,
information related to the limitations of the study and recommendations for further
research are discussed. Chapter 5 also includes implications and conclusions of this
research study.
92
Chapter 5: Discussion, Conclusions, and Recommendations
Introduction
The purpose of this quantitative study was to provide information about the
relationship between project manager competencies, personality, and project success by
(a) investigating the relationship between project manager competencies, personality
traits, and project success; and (b) identifying whether project competencies or
personality traits is the strongest predictor of project success among project managers at
different work experience levels. The predictor variables are project manager
competencies and personality traits. The criterion variable is project success. The
moderating variable is work experience. I analyzed the data using simple regression,
hierarchical multiple regression, and moderated hierarchical multiple regression. I
conducted this study because some researchers (Chen et al., 2019) suggested a need for
more investigation into the role work experience plays in the relationship between project
manager competencies, personality traits, and project success.
The data analysis showed that project manager competencies and personality
traits statistically significantly predict project success, but project manager years of
experience did not. The data analysis also revealed that project manager competencies
was stronger than personality traits for predicting project success. In addition, the data
analysis revealed that adding work experience (project manager years of experience) did
not explain the variance in project success (criterion variable) beyond project manager
competencies and personality traits (predictor variables).
93
Interpretation of the Findings
I surveyed 272 participants by posting a SurveyMonkey link on LinkedIn and
Facebook social media platforms and a link on the Amazon Mechanical Turk website.
Participants were current or previous project managers with at least 2 years of work
experience. The participants provided their opinions about the relationship between
project manager competencies, personality traits, work experience, and project success.
Research Question 1
RQ1 asked if project manager competencies predicted project success. I measured
project manager competencies using El-Sabaa’s (2001) adapted version of the three skills
of effective administrators instrument. El-Sabaa grouped 18 project manager
competencies into human skills, conceptual and organizational skills, and technical skills,
which were linked to project success. I used El-Sabaa’s 18 project manager competencies
to predict project success.
One definition of project management competency is the proven ability to carry
out activities exceptionally in a complex project environment, leading to anticipated
results (El-Sabaa, 2001). Chen et al. (2019) found that project management knowledge
and technical competence are essential and play a stable role in project success. The
regression results were consistent with Chen et al. (2019) and other studies that found
project manager competencies to be moderate to strong project success predictors
(Ahmed & Anantatmula, 2017; Alvarenga et al., 2019). The results shown in Table 5
confirmed that the predictor variable of project manager competencies explained 50% of
the criterion variable of project success, which was the aim of this study. The study
94
findings suggest that human skills, conceptual and organizational skills, and technical
skills are vital competencies that equip project managers to effectively address the
overlapping critical success factors that influence projects, such as product delivery,
project management processes, and stakeholder expectations (Millhollan & Kaarts-
Brown, 2016).
Research Question 2
RQ2 asked if personality traits predicated project success. I measured personality
traits using the Big Five personality Trait Short Questionnaire. The Big Five personality
traits framework has been used in various studies to evaluate the relationship between
project manager personality and overall project results (de Moura et al., 2019; Gray &
Ulbrich, 2017; Hassan et al., 2017). In this study, I used the Big Five personality Trait
Short Questionnaire to measure five broad dimensions of personality that provide
adequate confidence and strength in personality analyses, including extraversion,
agreeableness, openness to experience, conscientiousness, and neuroticism (Costa &
McCrae, 1985).
Scholars have described personality as a preset system of thought, emotions,
motivation, and behavior for every individual (Thielmann et al., 2020). In previous
studies, researchers have reported that the Big Five personality traits significantly
influence project success (de Moura et al., 2019; Gray & Ulbrich, 2017; Hassan et al.,
2017). The regression results were consistent with studies that found some of the Big
Five personality traits to be small to moderate predictors of project success (Ahmed &
Anantatmula, 2017; Alvarenga et al., 2019).
95
Extraversion represents social ability and confidence (Costa & McCrae, 1985).
The results in Table 5 confirmed that the predictor of the extraversion trait accounted for
20% of the variation in project success. These findings suggest that extraversion can
impact project outcomes such as project manager performance and team performance,
which are critical to overall project success (de Moura et al., 2019; Gray & Ulbrich,
2017; Hassan et al., 2017).
Agreeable individuals tend to express warmth, cooperation, and acceptance of
others (Costa & McCrae, 1985). The results in Table 5 confirmed that the predictor of the
agreeableness trait accounted for 4% of the variation in project success. These findings
suggest that agreeableness traits, such as favoring being cooperative instead of
competitive, can have a small effect on overall project success (de Moura et al., 2019;
Hassan et al., 2017).
Individuals who express openness to experience tend to be creative, imaginative,
and innovative (Costa & McCrae, 1985). The results in Table 5 confirmed that the
predictor of the openness to experience trait explained 39% of the variation in project
success. The medium-size effect of openness to experience suggests that this trait can be
crucial for projects requiring revolutionary creation (Hassan et al., 2017).
Conscientious individuals tend to be responsible, organized, reliable, and goal-
centered (Costa & McCrae, 1985). The results in Table 5 confirmed that the predictor of
the conscientiousness trait explained 5% of the variation in project success. Despite a
small effect size, conscientiousness project managers generally possess more control over
96
their project environments, which is a critical success factor for project success (Hassan
et al., 2017).
Anxiety, self-consciousness, low self-esteem, and impulsivity describe the
neuroticism trait. Poor project manager performance has been linked to higher levels of
neuroticism (Aretoulis et al., 2017). The results in this study revealed that the Big Five
personality trait neuroticism did not predict project success. Moreover, the results
indicated the neuroticism trait accounted for only 0.1% of the variation in project success.
These findings are like other studies that reported that neuroticism does not predict
project success (Hassan et al., 2017). These findings are not surprising given that the
neuroticism trait could lead to project manager behaviors linked to adverse project
management outcomes.
Research Question 3
RQ3 asked if work experience predicted project success. I measured work
experience using tenure (project manager years of experience). Tesluk and Jacobs (1998)
found that tenure could provide opportunities for an individual to learn and grow in job
performance. However, Tesluk and Jacobs
(
1998) argued that a more effective framework
for work experience would involve the interaction between tenure, the number of times
an individual performs a task or duty (Ford et al., 1992), and the type of work challenges
and interactions that build up over time (DuBois & McKee, 1994; McCauley et al.,
1994).
Because some studies found a statistically significant relationship between tenure
and project success, I assessed whether tenure alone would predict project success (Luţaş
97
et al., 2020; Noor et al., 2020). The results indicated that work experience did not
statistically significantly predict project success. Moreover, the results indicated that
work experience (project manager years of experience) explains only 1% of project
success. This study’s results align with scholars who suggest that tenure alone may not
provide project managers with the deep work assignments that lead to competency
development (Tesluk & Jacobs, 1998). Also, these findings are like other studies in which
researchers did not find a statistically significant relationship between project success and
work experience measured as years of experience in a position (Noor et al., 2020).
Research Question 4
RQ4 asked to what extent project manager competencies and personality traits
contribute uniquely to predicting project success. Studies have shown that project
manager competencies and personality are predictors of project success, but it is not
known which of the two variables is the most predictive of project success (El-Sabaa,
2001; Hassan et al., 2017). RQ4 aimed to determine the relative contribution of each
predictor variable to the total variance explained for project success and to determine
which variable was the strongest predictor of project success.
Scholars have argued that project competencies and personality traits are core
assets to today’s organizations (Chen et al., 2019; Millhollan & Kaarts-Brown, 2016).
The final hierarchical regression model results confirmed that project manager
competencies and the Big Five personality traits of extraversion and openness to
experience, and neuroticism uniquely contributed to predicting project success, which
aligns with other studies (Chen et al., 2019; Luţaş et al., 2020; Millhollan & Kaarts-
98
Brown, 2016). Project manager competencies, extraversion, and openness to experience
positively affected project success, whereas neuroticism had a negative effect shown in
Table 6. Scholars reported that agreeableness and conscientiousness are positive
personality traits that can improve project team effectiveness (Luţaş et al., 2020;
Millhollan & Kaarts-Brown, 2016). However, these two traits did not statistically
significantly contribute to predicting project success in this study, as found in Table 6.
Additionally, these findings revealed that project manager competencies was the
most robust predictor explaining 49% of the variance in project success. Regarding the
Big Five personality traits effect on the variance in project success, extraversion
explained at 13%, openness to experience explained at 28%, and neuroticism explained at
4%. This study’s findings suggest that project success is influenced by what project
managers know, what they can do, and who they are, which includes the positive
qualities of extraversion and openness to experience, as well as the negative quality of
neuroticism.
Research Question 5
RQ5 asked if work experience (project manager’s years of experience) moderates
the relationship between project manager competencies and project success. Research
finding have varied related to the relationship between tenure and job performance (Luţaş
et al., 2020; Noor et al., 2020; Tesluk & Jacobs, 1998). For example, Chen et al. (2019)
called for further investigation into the moderating effect of work experience on project
success. Therefore, I used project manager’s years of experience in this study to
determine if tenure alone would explain project success beyond what could be explained
99
by project manager competencies. In this study, I used hierarchical regression to
determine if adding work experience (project manager’s years of experience) improved
the prediction of project success over and above project competencies.
Years of experience was used as a moderating variable. Some scholars report that
years of experience alone have a negligible influence on job performance (Tesluk &
Jacobs, 1998). The results revealed that work experience measured as a project manager’s
years of experience did not moderate the relationship between project manager
competencies and project success. The results in Table 7 are consistent with other studies
where years of experience did not moderate the relationship between individuals’ skills
and job performance (Noor et al., 2020; Tesluk & Jacobs, 1998). These findings revealed
that the interaction between project manager competencies and work experience did not
improve in explaining the variance in project success beyond project manager
competencies. The results are not surprising given this study’s finding that a project
manager’s years of experience do not predict project success.
Research Question 6
RQ6 asked if work experience (project manager’s years of experience) moderates
the relationship between personality traits and project success. Several researchers have
found positive links between personality traits and project success (Araújo & Pedron,
2016; Henkel et al., 2019; Millhollan & Kaarts-Brown, 2016; Noor et al., 2020; Turner &
Müller, 2006). To explore RQ6, I used moderated hierarchical regression to determine if
adding work experience (project manager’s years of experience) improved the prediction
of project success over and above personality traits.
100
Like several scholars, this study found that years of experience did not moderate
the relationship between project manager Big Five personality traits and project success
shown in Table 8 (Aretoulis et al., 2017; Millhollan & Kaarts-Brown, 2016; Noor et al.,
2020). I anticipated these findings because personality is considered a preset and
enduring system of thought, emotions, motivation, and behavior for every individual
(Thielmann et al., 2020).
Limitations of the Study
My study investigated the relationship between project manager competencies,
personality traits, and project success and identified whether project manager competencies
or personality was the strongest predictor of project success among project managers at
different work experience levels. One external threat to the validity of this study was using
a convenience sampling method due to the potential for researcher bias. A convenience
sample of a specific group within a population was used rather than a randomly sampled
group of individuals to understand that group’s expert opinions (Creswell & Creswell,
2017). Also, using convenience sampling poses a threat to generalizability due to the lack
of a representative sample. However, this convenience sample included project managers,
making some of my study findings applicable to environments with project managers.
Recommendations
My quantitative, cross-sectional study involved data collection from project
managers only. One recommendation is to survey project sponsors, project team
members, and stakeholders. Surveying other roles within the project management
101
environment could provide greater insight or alternative opinions about the strongest
predictor of project success.
This study used tenure, which is only one aspect of Tesluk and Jacobs’ (1998)
theory of work experience. I recommend further research using Tesluk and Jacobs’ entire
work experience framework of tenure, the number of times a task or duty has been
performed, and the type of work challenges and interactions that accrue over time. Using
the full Tesluk and Jacobs work experience framework could yield different results than
those reported in this study.
I used the Project Implementation Profile (Pinto & Slevin, 1987) to measure
project success. The project management discipline is undergoing an evolution like other
professional domains. Given the changing role of project managers, technical methods,
and stakeholders’ expectations about project success, another suggestion is to compare
this study’s results to other research that used different measures of project success.
I intended my quantitative survey research design to be a first step toward
identifying factors for a customizable project leadership competency model. A second
step could be a qualitative study to gather project managers’ own words to describe their
perceptions about the influence project manager competencies and personality traits have
on their project success. Obtaining data in project managers’ own words would further
inform a project leadership competency model.
Implications
This study has social change implications for human resources professionals,
project management professionals, and project management certification organizations.
102
Persistent project failures exist and are not without adverse organizational and individual
consequences (Gupta et al., 2019; Hassan et al., 2017). Therefore, researchers are still on
the quest to understand what factors influence project success, including project manager
characteristics (Maqbool et al., 2017). Therefore, this study contributes in several ways.
Research shows that competent project managers are essential to gaining and
maintaining a competitive advantage (Ijaola et al., 2020). My study’s results could help
human resources professionals employ evidence-based project leadership competency
frameworks and learning and development interventions to equip project managers
capable of influencing project success in the for-profit and nonprofit sectors. Moreover,
this study could inform talent acquisition decision making given that project success was
statistically significantly explained by project manager competencies and three of five
Big Five personality traits.
Tenure measured as project manager years of experience did not predict project
success, nor did it moderate the relationship between project success and project manager
competencies or three of the five Big Five personality Traits in this study. However,
tenure is widely used on project manager job requisitions (Chen et al., 2019; Henkle et
al., 2019). This study’s finding could affect today’s project manager recruitment and
selection practices. For instance, when otherwise qualified individuals cannot compete
for jobs due to a lack of years of experience, organizations could face a decreased
candidate pool. Also, barring candidates from the opportunity to apply for positions based
solely on tenure could impair their earning potential, which has been linked to several
adverse quality of life outcomes (Carr et al., 2018). Therefore, human resource
103
professionals should reexamine tenure alone in talent recruitment and selection and
consider using the type and amount of challenging work experiences (work density)
proposed by Tesluk and Jacobs (1998).
Improved project manager performance would benefit organizations, individuals,
project management certification associations, and communities (Holcomb et al., 2021).
The results from this study could help improve project manager job performance leading
to more quality goods and services offered by for-profit companies and increased social
good offered to vulnerable communities. In addition to improving organizational and
community outcomes, this study’s findings could benefit project managers’ career
planning and development by pointing to evidence-based project manager competencies
and personality traits most likely to predict project success. Moreover, the results of this
study could help project management certifying organizations continue evolving the
certification qualifications by recognizing and including the role personality plays in
predicting project success.
Finally, my study contributes to the project management literature by using a
single study to investigate the influence of project manager competencies and personality
traits on project success among project managers at specific work experience levels
(Chen et al., 2019). This study’s results could provide insight into the essential project
manager competencies and personality traits needed at distinct work experience levels.
Conclusion
Project managers play a significant role in project success, so improving their
performance is critical (Hassan et al., 2017). Continued project failure can lead to cost
104
overruns, loss of market share, unmet stakeholder expectations, and impede strategic
opportunities in the for-profit and nonprofit sectors (Ahmed & Anantatmula, 2017;
Burrell, 2018; Hassan et al., 2017). Therefore, this study investigated the relationship
between project manager competencies, personality traits, and project success and
identified that project manager competencies are a stronger predictor of project success
than different work experience levels. Like other scholars, I concluded that the project
manager assignment could make or break project success.
What role does work experience play in project success, and how can
organizations, individuals, and project management certifying bodies leverage that
knowledge to improve project success? Partly because findings have been mixed, some
researchers have continued to call for further investigation into the moderating effect of
work experience on project success (Chen et al., 2019; Luţaş et al., 2020; Noor et al.,
2020; Tesluk & Jacobs, 1998).). This study aimed to extend the project management
community’s knowledge by reporting that tenure alone was not a statistically significant
predictor of project success. Given project managers’ impact on project success, it seems
prudent to understand how they can influence project success at different work
experience levels.
Lastly, project success has far-reaching implications. For example, persistent
project failure could deny society products, services, and programs from reaching the
members of society who need those things the most (Holcomb et al., 2021). Therefore,
improving project success could help organizations gain and maintain a competitive
105
advantage that allows them to employ individuals who deliver goods and services for a
better society. I hope this study contributes to that mission.
106
References
Adero, F. A., & Odiyo, W. O. (2020). Leadership theories and the desired competencies
of the 21st century organization leader. International Journal of Business
Management, Entrepreneurship, and Innovation, 2(3), 16–35.
https://doi.org/10.35942/jbmed.v2i3.115
Afzal, A., Khan, M. M., & Mujtaba, B. G. (2018). The impact of project managers’
competencies, emotional intelligence, and transformational leadership on project
success in the information technology sector. Маркетинг і менеджмент
інновацій, 2, 142–154. https://doi.org/10.21272/MMI.2018.2-12
Aga, D. A., Noorderhaven, N., & Vallejo, B. (2016). Transformational leadership and
project success: The mediating role of team building. International Journal of
Project Management, 34(5), 806–818.
https://doi.org/10.1016/j.ijproman.2016.02.012
Ahmad, M., & Khan, A. (2019). Personality and anger among students. Education,
Sustainability & Society, 2(1), 16–18. http://doi.org/10.26480/ess.01.2019.16.18
Ahmed, R., & Anantatmula, V. S. (2017). Empirical study of project managers leadership
competence and project performance. Engineering Management Journal, 29(3),
189–205. https://doi.org/10.1080/10429247.2017.1343005
Ahmed, R., & Philbin, S. P. (2020). Systematic literature review of project manager’s
leadership competencies. Engineering, Construction, and Architectural
Management, 28(1), 1–30. https://doi.org/10.1108/ECAM-05-2019-0276
Ahsan, K., Ho, M., & Khan, S. (2013). Recruiting project managers: A comparative
107
analysis of competencies and recruitment signals from job advertisements. Project
Management Journal, 44(5), 36–54. https://doi.org/10.1002/pmj.21366
Albert, M., Balve, P., & Spang, K. (2017). Evaluation of project success: A structured
literature review. International Journal of Managing Projects in Business, 10(4),
796–821. https://doi.org/10.1108/IJMPB-01-2017-0004
Al-Ghareeb, H., & Al-Wotayan, R. (2021). Does workplace physical and psychological
violence exist against physicians and nurses in Primary Health Care Centers in
Kuwait? A cross-sectional study. Middle East Journal of Family Medicine, 19(5),
13-27. https://doi: 10.5742/mewfm.2021.94043
Alias, Z., Zawawi, E. M. A., Yusof, K., & Aris, N. M. (2014). Determining critical
success factors of project management practice: A conceptual framework.
Procedia-Social and Behavioral Sciences, 153, 61–69.
https://doi.org/10.1016/j.sbspro.2014.10.041
Alvarenga, J. C., Branco, R. R., Guedes, A. L. A., Soares, C. A. P., & e Silva, W. D. S.
(2019). The project manager core competencies to project success. International
Journal of Managing Projects in Business, 13(2), 277–292.
https://doi.org/10.2478/ceej-2021-0003
American Psychological Association. (2017). Ethical principles of psychologists and
code of conduct (2002, amended effective June 1, 2010, and January 1, 2017).
https://apa.org/ethics/code
Amoatey, C., & Hayibor, M. V. K. (2017). Critical success factors for local government
project stakeholder management. Built Environment Project and Asset
108
Management, 7(2), 143–156. https://doi.org/10.1108/BEPAM-07-2016-0030
Aranyossy, M., Blaskovics, B., & Horváth, Á. A. (2018). How universal are IT project
success and failure factors? Evidence from Hungary. Information Systems
Management, 35(1), 15–28. https://doi.org/10.1080/10580530.2017.1416943
Araújo, C., & Pedron, C. D. (2016). The importance of soft skills and it project
managers’ personality type. International Journal of Professional Business
Review, 1(1), 40–59. https://doi.org/10.26668/businessreview/2016.v1i1.8
Aretoulis, G. N., Papathanasiou, J. B., Zapounidis, K., & Seridou, A. A. (2017).
Conscientiousness personality trait defines the competent Greek project manager.
International Journal of Business Performance Management, 18(3), 350–380.
https://doi.org/10.1504/ijbpm.2017.084857
Aronson, Z. H. (2018). An investigation of culture and contextual performance in
projects: what is the role of project leader personal style differences?
International Journal of Innovation and Technology Management, 15(4),
1850034. https://doi.org/10.1142/S0219877018500347
Aronson, Z. H., Reilly, R. R., & Lynn, G. S. (2006). The impact of leader personality on
new product development teamwork and performance: The moderating role of
uncertainty. Journal of Engineering and Technology Management, 23(3), 221–
247. http://dx.doi.org/10.1016/j.jengtecman.2006.06.003
Ash, R. A., & Levine, E. L. (1985). Job applicant training and work experience
evaluation: An empirical comparison of four methods. Journal of Applied
Psychology, 70(3), 572–576. https://doi.org/10.1037/0021-9010.70.3.572
109
Awan, M. H., Ahmed, K., & Zulqarnain, W. (2015). Impact of project manager’s soft
leadership skills on project success. Journal of Poverty, Investment and
Development, 8(2), 37-89.
Azanha, A., Argoud, A. R. T. T., de Camargo Junior, J. B., & Antoniolli, P. D. (2017).
Agile project management with Scrum: A case study of a Brazilian
pharmaceutical company IT project. International Journal of Managing Projects
in Business, 10(1), 121-142.
Babcock, S. E., & Wilson, C. A. (2020). Big Five Model of Personality. The Wiley
Encyclopedia of Personality and Individual Differences: Personality Processes
and Individual Differences, 55-60. https://doi.org/10.1002/9781118970843.ch186
Baccarini, D. (1999). The logical framework method for defining project success. Project
Management Journal, 30(4), 25-32.
http://dx.doi.org/10.1177/875697289903000405
Baker, B., Murphy, D., & Fisher, D. (1988). Factors affecting project success, In Project
Management Handbook, 2
nd
edition, pp. 902-919. New York, NY: Van Nostrand
Reinhold.
Ballesteros-Sánchez, L., Ortiz-Marcos, I., Rivero, R. R., & Ruiz, J. J. (2017). Project
management training: An integrative approach for strengthening the soft skills of
engineering students. The International Journal of Engineering Education, 33(6),
1912-1926. https://www.ijee.ie/latestissues/Vol33-6A/20_ijee3526ns.pdf
Barańczuk, U. (2019). The five-factor model of personality and emotion regulation: A
meta-analysis. Personality and Individual Differences, 139, 217-227.
110
https://psycnet.apa.org/doi/10.1016/j.paid.2018.11.025
Barlett, C. P., & Anderson, C. A. (2012). Direct and indirect relations between the Big 5
personality traits and aggressive and violent behavior. Personality and Individual
Differences, 52(8), 870-875. https://doi.org/10.1016/j.paid.2012.01.029
Barrick, M. R., & Mount, M. K. (1991). The big five personality dimensions and job
performance: a meta‐analysis. Personnel psychology, 44(1), 1-26.
https://psycnet.apa.org/doi/10.1111/j.1744-6570.1991.tb00688.x
Bauer, B. J., Richardson, T. M., & Marion, J. W., Jr. (2014). Project Manager
‘Management Competency’vs. ‘Technical Competency’. Which is more
important to overall project management success?. International Journal of
Engineering Research and Applications, 4(4 (Version 1)), 269.
Bedingfield, J.D., & Thal, A.E. (2008). Project manager personality as a factor for
success. PICMET ‘08 - 2008 Portland International Conference on Management
of Engineering & Technology, 1303-1314.
https://doi.org/10.1109/PICMET.2008.4599742
Belassi, W., & Tukel, O. I. (1996). A new framework for determining critical
success/failure factors in projects. International Journal of Project Management,
14(3), 141-151. https://doi.org/10.1016/0263-7863(95)00064-X
Bell, S. T. (2007). Deep-level composition variables as predictors of team performance: a
meta-analysis. Journal of Applied Psychology, 92(3), 595.
https://doi.org/10.1037/0021-9010.92.3.595
Berry, W. D. (1993). Understanding regression assumptions. Newbury Park, CA: Sage.
111
Bertsch, A., Nguyen, H. T. H., Alford, A., Baran, W., Reynen, J., Saeed, M., &
Ondracek, J. (2017). Exploring the relationship between personality and preferred
leadership. Journal of Leadership, Accountability, and Ethics, 14(1), 32-45.
Blomquist, T., Farashah, A. D., & Thomas, J. (2018). Feeling good, being good and
looking good: Motivations for, and benefits from, project management
certification. International Journal of Project Management, 36(3), 498-511.
http://orcid.org/0000-0001-8123-5730
Bond-Barnard, T. J., Fletcher, L., & Steyn, H. (2018). Linking trust and collaboration in
project teams to project management success. International Journal of Managing
Projects in Business, 11(2), 432-457. https://doi.org/10.1108/IJMPB-06-2017-
0068
Borman, W. C., Hanson, M. A., Oppler, S. H., Pulakos, E. D., & White, L. A. (1993).
Role of early supervisory experience in supervisor performance. Journal of
applied psychology, 78(3), 443. https://psycnet.apa.org/doi/10.1037/0021-
9010.78.3.443
Boudreau, J., & Anis, H. (2020). Effect of personality traits in team dynamics and project
outcomes in engineering design. The International Journal of Engineering
Education, 36(1), 420-435.
Boyatzis, R. E., Goleman, D., Gerli, F., & Bonesso, S. (2019). Emotional and social
intelligence competencies for project management. In Cognitive Readiness in
Project Teams (pp. 171-195). Productivity Press.
112
Bradley, J. H., & Hebert, F. J. (1997). The effect of personality type on team
performance. Journal of Management Development, 16(5), 337-353.
https://doi.org/10.1108/02621719710174525
Burrell, D. N. (2018). Exploring leadership coaching as a tool to improve the people
management skills of information technology and cybersecurity project managers.
Holistic–Journal of Business and Public Administration, 9(2), 107-126.
https://doi.org/10.2478/hjbpa-2018-0015
Campbell, D. T., & Stanley, J. C. (2015). Experimental and quasi-experimental designs
for research. Ravenio Books.
Cattell, R. B. (1943). The description of personality: basic traits resolved into clusters.
The Journal of Abnormal and Social Psychology, 38(4), 476–506.
https://psycnet.apa.org/doi/10.1037/h0054116
Chen, T., Fu, M., Liu, R., Xu, X., Zhou, S., & Liu, B. (2019). How do project
management competencies change within the project management career model
in large Chinese construction companies? International Journal of Project
Management, 37(3), 485-500. http://dx.doi.org/10.1016/j.ijproman.2018.12.002
Cheng, M. I., Dainty, A. R., & Moore, D. R. (2005). What makes a good project
manager?. Human Resource Management Journal, 15(1), 25-37.
https://doi.org/10.1111/j.1748-8583.2005.tb00138.x
Chipulu, M., Ojiako, U., Marshall, A., Williams, T., Bititci, U., Mota, C., Shou, Y.,
Thomas, A., El Dirani, A., Maguire, S., & Stamati, T. (2019). A dimensional
analysis of stakeholder assessment of project outcomes. International Journal of
113
Managing Projects in Business, 11(2), 432-457.
https://doi.org/10.1080/09537287.2019.1567859
Choudhry, R. M., & Zafar, B. (2017). Effects of skills, motivation, and personality traits
on the competency of masons. International Journal of Sustainable Real Estate
and Construction Economics, 1(1), 16-30.
http://dx.doi.org/10.1504/IJSRECE.2017.10005277
Chow, T. W., Salleh, L. M., & Ismail, I. A. (2017). Lessons from the major leadership
theories in comparison to the competency theory for leadership practice. Journal
of Business and Social Review in Emerging Economies, 3(2), 147-156.
https://doi.org/10.26710/jbsee.v3i2.86
Chua, D. K. H., Kog, Y. C., & Loh, P. K. (1999). Critical success factors for different
project objectives. Journal of Construction Engineering and Management,
125(3), 142-150. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(142)
Ciric, D., Delic, M., Lalic, B., Gracanin, D., & Lolic, T. (2021). Exploring the link
between project management approach and project success dimensions: A
structural model approach. Advances in Production Engineering & Management,
16(1), 99-111.
Clarke, N. (2010). Emotional intelligence and its relationship to transformational
leadership and key project manager competencies. Project management journal,
41(2), 5-20. https://doi.org/10.14743/apem2021.1.387
Cleveland, S., & Cleveland, M. (2020). Leadership competencies for sustained project
success. International Journal of Applied Management Theory and Research
114
(IJAMTR), 2(1), 35-47. http://dx.doi.org/10.4018/IJAMTR.2020010103
Cohen, J. (1992). Statistical power analysis. Current directions in psychological science,
1(3), 98-101.
Cohen, Y., Ornoy, H., & Keren, B. (2013). MBTI personality types of project managers
and their success: A field survey. Project Management Journal, 44(3), 78-87.
http://dx.doi.org/10.1002/pmj.21338
Collodi, S., Fiorenza, M., Guazzini, A., & Duradoni, M. (2020). How Reputation
Systems Change the Psychological Antecedents of Fairness in Virtual
Environments. Future Internet, 12(8), 132. https://doi.org/10.3390/fi12080132
Conard, M. A. (2020). Predicting leader emergence with bright and dark traits. The
Journal of Psychology, 154(1), 1-14.
https://doi.org/10.1080/00223980.2019.1637810
Cooke-Davies, T. (2002). The “real” success factors on projects. International journal of
project management, 20(3), 185-190. http://dx.doi.org/10.1016/S0263-
7863(01)00067-9
Correa, J. A. G., Castañeda, S. L. S., Quintero, D. A. V., & Giraldo, G. E. (2018).
Identification and analysis of project management success factors in information
technology SMEs. International Journal of Information Technology Project
Management (IJITPM), 9(4), 73-90. https//doi.org/ 10.4018/IJITPM.2018100105
Costa, P. T., & McCrae, R. R. (1985). The NEO personality inventory. Psychological
Assessment Resources.
Creswell, J. W., & Creswell, J. D. (2017). Research design: Qualitative, quantitative, and
115
mixed methods approaches. Sage publications.
Crosby, P. (2012). Characteristics and techniques of successful high-technology project
managers. International Journal of Project Organisation and Management, 4(2),
99-122. http://dx.doi.org/10.1504/IJPOM.2012.046325
Dağlı, Ö. B. (2018). Stakeholder management in project success: Is it an object or
subject. PM World Journal, 7(5), 1-6.
Davis, K. (2014). Different stakeholder groups and their perceptions of project success.
International journal of project management, 32(2), 189-201.
http://dx.doi.org/10.1016/j.ijproman.2013.02.006
Davis, K. (2017). An empirical investigation into different stakeholder groups perception
of project success. International Journal of Project Management, 35(4), 604-617.
http://dx.doi.org/10.1016/j.ijproman.2017.02.004
de Araújo, C. C. S., & Pedron, C. D. (2015). The IT project manager competencies that
impact project success–A qualitative research. Organisational Project
Management, 2(1), 53-75. http://dx.doi.org/10.5130/opm.v2i1.4142
Deinert, A., Homan, A. C., Boer, D., Voelpel, S. C., & Gutermann, D. (2015).
Transformational leadership sub-dimensions and their link to leaders’ personality
and performance. The Leadership Quarterly, 26(6), 1095-1120.
https://psycnet.apa.org/doi/10.1016/j.leaqua.2015.08.001
de Moura, R. L., Carneiro, T. C. J., de Lemos Dias, T., & Oliveira, B. S. (2019).
Personality traits of project managers: Differences in knowledge, experience, and
116
business sector. Brazilian Journal of Management, 12(4), 767-784.
https://doi.org/10.5902/1983465922096
Denney, V. P., Haley, G. R., Rivera, E., & Watkins, D. V. (2020). PROJECT
MANAGEMENT LEADERSHIP AND INTERPERSONAL SKILLS: THE
PAST, PRESENT, AND FUTURE. Global Journal of Management and
Marketing, 4(1), 135.
Denton, D. W., & Kleiman, L. S. (2001). Job tenure as a moderator of the relationship
between autonomy and satisfaction. Applied HRM Research, 6(2), 105-114.
de Oliveira, G. F., & Rabechini, R., Jr. (2019). Stakeholder management influence on
trust in a project: A quantitative study. International Journal of Project
Management, 37(1), 131-144. https://doi.org/10.1016/j.ijproman.2018.11.001
De Pater, I. E., Van Vianen, A. E., Bechtoldt, M. N., & KLEHE, U. C. (2009).
Employees’ challenging job experiences and supervisory evaluations of
promotability. Personnel Psychology, 62(2), 297-325.
https://doi.org/10.1111/j.1744-6570.2009.01139.x
de Rezende, L. B., & Blackwell, P. (2019). Project management competency framework.
Iberoam. J. Proj. Manag, 10(1), 34-59.
http://www.ijopm.org/index.php/IJOPM/article/view/439
De Wit, A. (1988). Measurement of project success. International journal of project
management, 6(3), 164-170. https://doi.org/10.1016/0263-7863(88)90043-9
Digman, J. M. (1990). Personality structure: Emergence of the five-factor model. Annual
review of psychology, 41(1), 417-440.
117
https://doi.org/10.1146/annurev.ps.41.020190.002221
Ding, X., Li, Q., Zhang, H., Sheng, Z., & Wang, Z. (2017). Linking transformational
leadership and work outcomes in temporary organizations: A social identity
approach. International Journal of Project Management, 35(4), 543-556.
http://dx.doi.org/10.1016/j.ijproman.2017.02.005
Do, M. H., & Minbashian, A. (2020). Higher-order personality factors and leadership
outcomes: A meta-analysis. Personality and Individual Differences, 163, 110058.
https://doi.org/10.1016/j.paid.2020.110058
do Vale, J. W. S. P., Nunes, B., & de Carvalho, M. M. (2018). Project managers’
competencies: what do job advertisements and the academic literature say?.
Project Management Journal, 49(3), 82-97.
https://doi.org/10.1177%2F8756972818770884
Dragoni, L., Oh, I. S., Vankatwyk, P., & Tesluk, P. E. (2011). Developing executive
leaders: The relative contribution of cognitive ability, personality, and the
accumulation of work experience in predicting strategic thinking competency.
Personnel psychology, 64(4), 829-864. http://dx.doi.org/10.1111/j.1744-
6570.2011.01229.x
Dragoni, L., Tesluk, P. E., Russell, J. E., & Oh, I. S. (2009). Understanding managerial
development: Integrating developmental assignments, learning orientation, and
access to developmental opportunities in predicting managerial competencies.
Academy of Management Journal, 52(4), 731-743.
https://doi.org/10.5465/amj.2009.43669936
118
DuBois, D., & McKee, A. S. (1994, May). Facets of work experience. In 9th Annual
Conference of the Society for Industrial and Organizational Psychology,
Nashville, TN.
Dulewicz, S. V., & Higgs, M. J. (2004). Design of a new instrument to assess leadership
dimensions and styles. Selection and development review, 20(2), 7-12.
Dvir, D., Raz, T., & Shenhar, A. J. (2003). An empirical analysis of the relationship
between project planning and project success. International journal of project
management, 21(2), 89-95. Dvir, D., Raz, T., & Shenhar, A. J. (2003). An
empirical analysis of the relationship between project planning and project
success. International journal of project management, 21(2), 89-95.
Dvir, D. O. V., Sadeh, A., & Malach-Pines, A. (2006). Projects and project managers:
The relationship between project managers’ personality, project types, and project
success. Project Management Journal, 37(5), 36-48.
https://doi.org/10.1177%2F875697280603700505
Edum-Fotwe, F. T., & McCaffer, R. (2000). Developing project management
competency: perspectives from the construction industry. International journal of
project management, 18(2), 111-124. https://doi.org/10.1016/S0263-
7863(98)90075-8
El-Sabaa, S. (2001). The skills and career path of an effective project manager.
International Journal of Project Management, 19(1), 1-7.
https://doi.org/10.1016/S0263-7863(99)00034-4
Ersoy-Kart, M., Savcı, I., Pişkin, M., Güldü, Ö., & Totuk, M. (2018). The Moderating
119
Role of General Mood Between Agreeableness and Moral Maturity.
Psychological Studies, 63(3), 236-242. https://doi.org/10.1007/s12646-018-0451-
0
Fisher, E. (2011). What practitioners consider to be the skills and behaviours of an
effective people project manager. International journal of project management,
29(8), 994-1002. http://dx.doi.org/10.1016/j.ijproman.2010.09.002
Fitzner, K., & Heckinger, E. (2010). Sample size calculation and power analysis: a quick
review. The Diabetes Educator, 36(5), 701-707.
https://doi.org/10.1177/0145721710380791
Floris, M., Wiblen, S. L., & Anichenko, E. (2020). Senior project leadership skills and
career stallers: Analysis of perception differences and implications for careers.
Project Management Journal, 51(2), 214-234.
http://dx.doi.org/10.1177/8756972820907491
Ford, J. K., Quiñones, M. A., Sego, D. J., & Sorra, J. S. (1992). Factors affecting the
opportunity to perform trained tasks on the job. Personnel psychology, 45(3), 511-
527. https://psycnet.apa.org/doi/10.1111/j.1744-6570.1992.tb00858.x
Forthmann, B., Regehr, S., Seidel, J., Holling, H., Çelik, P., Storme, M., & Lubart, T.
(2018). Revisiting the interactive effect of multicultural experience and openness
to experience on divergent thinking. International Journal of Intercultural
Relations, 63, 135-143. https://psycnet.apa.org/doi/10.1016/j.ijintrel.2017.10.002
Frankfort-Nachmias, C., Leon-Guerrero, A., & Davis, G. (2019). Social statistics for a
diverse society. Sage Publications.
120
Freeman, M., & Beale, P. (1992). Measuring project success. Project Management
Institute, 23(1), 8.
Frefer, A. A., Mahmoud, M., Haleema, H., & Almamlook, R. (2018). Overview success
criteria and critical success factors in project management. Industrial engineering
& management, 7(1), 1-6. http://dx.doi.org/10.4172/2169-0316.1000244
Furtner, M. R., Tutzer, L., & Sachse, P. (2018). The mindful self-leader: Investigating the
relationships between self-leadership and mindfulness. Social Behavior and
Personality: an international journal, 46(3), 353-360.
https://doi.org/10.2224/sbp.6521
Gale, A., & Brown, M. (2003). Project management professional development: An
industry led programme. Journal of Management Development, 22(5), 410-425.
http://dx.doi.org/10.1108/02621710310474769
Gelman, A., & Hill, J. (2007). Data analysis using regression and multilevel/hierarchical
models. New York: Cambrige University Press.
Gewanlal, C., & Bekker, M. (2015). Project manager attributes influencing project
success in the South African construction industry. Acta Structilia: Journal for the
Physical and Development Sciences, 22(1), 33-47.
Gillard, S. (2009). Soft skills and technical expertise of effective project managers. Issues
in informing science & information technology, 6, 723-729.
Goldberg, L. R. (1993). The structure of phenotypic personality traits. American
psychologist, 48(1), 26. https://psycnet.apa.org/doi/10.1037/0003-066X.48.1.26
Gong, Z., Chen, Y., & Wang, Y. (2019). The influence of emotional intelligence on job
121
burnout and job performance: Mediating effect of psychological capital. Frontiers
in psychology, 10, 2707. https://doi.org/10.3389/fpsyg.2019.02707
Gray, K., & Ulbrich, F. (2017). Ambiguity acceptance and translation skills in the project
management literature. International Journal of Managing Projects in Business,
10(2), 423-450. https://doi.org/ 10.1108/IJMPB-05-2016-0044
Greif, S., Stadler, M., & Niepel, C. (2019). Extraversion, working style, reasoning, and
complex problem solving: A study on the mechanisms underlying the link
between extraversion and cognitive ability. Psychological Test and Assessment
Modeling, 61(3), 321-332.
Gruden, N., & Stare, A. (2018). The influence of behavioral competencies on project
performance. Project Management Journal, 49(3), 98-109.
http://dx.doi.org/10.1177/8756972818770841
Gunter, R. C. (2020). Emotional intelligence and its relationship to project manager
leadership competencies and project success (Doctoral dissertation, Saint Leo
University).
Guo, J., Su, Q., & Zhang, Q. (2017). Individual creativity during the ideation phase of
product innovation: An interactional perspective. Creativity and Innovation
Management, 26(1), 31-48. https://doi.org/10.1111/caim.12205
Hachana, R., Berraies, S., & Ftiti, Z. (2018). Identifying personality traits associated with
entrepreneurial success: does gender matter?. Journal of Innovation Economics
Management, (3), 169-193. https://doi.org/10.3917/jie.027.0169
Hartig, J., Klieme, E., & Leutner, D. (Eds.). (2008). Assessment of competencies in
122
educational contexts. Hogrefe Publishing.
Hassan, M. M., Bashir, S., & Abbas, S. M. (2017). The impact of project managers’
personality on project success in NGOs: The mediating role of transformational
leadership. Project Management Journal, 48(2), 74-87.
Hayes, A. F. (2017). Introduction to mediation, moderation, and conditional process
analysis: A regression-based approach. Guilford publications.
He, Q., Wang, T., Chan, A. P., Li, H., & Chen, Y. (2019). Identifying the gaps in project
success research: A mixed bibliographic and bibliometric analysis. Engineering,
Construction and Architectural Management, 26(8), 1553-1573.
https://doi.org/10.1108/ECAM-04-2018-0181
Henkel, T. G., Haley, G., Bourdeau, D. T., & Marion, J. (2019). An insight to project
manager personality traits improving team project outcomes. Graziadio Business
Review, 22(2), 1-11.
Henkel, T. G., Marion, J. W., Jr., & Bourdeau, D. T. (2019). Project manager leadership
behavior: Task-oriented versus relationship-oriented. Journal of Leadership
Education, 18(2), 1. https://doi.org/10.12806/V18/I2/R8
Hofmann, D. A., & Jones, L. M. (2005). Leadership, collective personality, and
performance. Journal of Applied Psychology, 90(3), 509.
https://psycnet.apa.org/doi/10.1037/0021-9010.90.3.509
Hogan, R., Curphy, G. J., & Hogan, J. (1994). What we know about leadership:
Effectiveness and personality. American Psychologist, 49(6), 493.
https://psycnet.apa.org/doi/10.1037/0003-066X.49.6.493
123
Holcomb, S., Roman, J. L., Rodriguez, S., & Hetling, A. (2021). Securing the Safety Net:
Lessons from Nonprofit Organizations on TANF Access During COVID-19.
Families in Society. https://doi.org/10.1177/10443894211029596
Horváth, V. (2019). Project management competence–definitions, models, standards and
practical implications. Vezetéstudomány-Budapest Management Review, 50(11),
2-17. https://doi.org/10.14267/VEZTUD.2019.11.01
Hoxha, L., & McMahan, C. (2018). Does a project manager’s work experience help
project success?. International Journal of Construction Project Management,
10(2), 155-172.
Hughes, D. L., Rana, N. P., & Dwivedi, Y. K. (2020). Elucidation of IS project success
factors: an interpretive structural modelling approach. Annals of Operations
Research, 285(1), 35-66.
Hussein, A. (2017). Examination of Personality Traits as Predictors of Career Success.
International Journal of Academic Research in Business and Social Sciences,
7(10), 556-566. http://dx.doi.org/10.6007/IJARBSS/v7-i10/3409
Hutagalung, D., Sopa, A., Asbari, M., Cahyono, Y., Maesaroh, S., Chidir, G., & Winanti,
D. S. (2020). Influence soft skills, hard skills, and organization learning on
teachers’ performance through innovation capability as mediator. J Crit Rev,
7(19), 54-66.
Ika, L. A. (2009). Project success as a topic in project management journals. Project
Management Journal, 40(4), 6-19. https://doi.org/10.1002%2Fpmj.20137
Imam, H., & Zaheer, M. K. (2021). Shared leadership and project success: The roles of
124
knowledge sharing, cohesion and trust in the team. International Journal of
Project Management. http://dx.doi.org/10.1016/j.ijproman.2021.02.006
Jabar, I. L., Ismail, F., & Aziz, N. M. (2018). Managing IBS Project: The evolving roles
and competencies of project manager. Asian Journal of Behavioural Studies,
3(11), 117-125. https://doi.org/10.21834/ajbes.v3i11.107
Jena, A., & Satpathy, S. S. (2017). Importance of soft skills in project management.
International Journal of Scientific Research and Management, 5(7), 6173-6180.
https://doi.org/10.18535/ijsrm/v5i7.45
Jewell, P., Reading, J., Clarke, M., & Kippist, L. (2020). Information skills for business
acumen and employability: A competitive advantage for graduates in Western
Sydney. Journal of Education for Business, 95(2), 88-105.
https://doi.org/10.1080/08832323.2019.1610346
Jiang, W., Zhao, X., & Ni, J. (2017). The impact of transformational leadership on
employee sustainable performance: The mediating role of organizational
citizenship behavior. Sustainability, 9(9), 1567.
https://doi.org/10.3390/su9091567
Jones, K., Leonard, L. N., & Lang, G. (2018). Desired skills for entry level IS positions:
Identification and assessment. Journal of Computer Information Systems, 58(3),
214-220. https://doi.org/10.1080/08874417.2016.1229144
Joseph, E. D., & Zhang, D. C. (2021). Personality profile of risk-takers: An examination
of the Big Five facets. Journal of Individual Differences, 42(4), 194–203
https://psycnet.apa.org/doi/10.1027/1614-0001/a000346
125
Joseph, N., & Marnewick, C. (2018). Investing in project management certification: Do
organisations get their money’s worth?. Information Technology and
Management, 19(1), 51-74. https://doi.org/10.1007/s10799-017-0275-y
Jugdev, K., & Müller, R. (2005). A retrospective look at our evolving understanding of
project success. Project Management Journal, 36(4), 19-31.
https://doi.org/10.1177%2F875697280503600403
Jugdev, K., Perkins, D., Fortune, J., White, D., & Walker, D. (2013). An exploratory
study of project success with tools, software, and methods. International Journal
of Managing Projects in Business, 6(3), 534-551. https://doi.org/ 10.1108/IJMPB-
08-2012-0051
Karlsen, J. T., & Berg, M. E. (2020). A study of the influence of project managers’
signature strengths on project team resilience. Team Performance Management:
An International Journal, 26(3/4), 247-262. http://dx.doi.org/10.1108/TPM-12-
2018-0081
Katz, R. I. (1991). Skills of an effective administrator. Harvard Business Review,
Business Classics: Fifteen Key Concepts for Managerial Success.
Keeys, L. A., & Huemann, M. (2017). Project benefits co-creation: Shaping sustainable
development benefits. International Journal of Project Management, 35(6), 1196-
1212. http://dx.doi.org/10.1016/j.ijproman.2017.02.008
Kesmodel, U. S. (2018). Cross‐sectional studies–what are they good for?. Acta
obstetricia et gynecologica Scandinavica, 97(4), 388-393.
https://doi.org/10.1111/aogs.13331
126
Khan, Z. A. (2021). The Mediating Effect of Self-Efficacy on Relationship Between
Conscientiousness, Agreeableness and Contextual Performance: An Evidence
from Higher Educational Institutions from Oman. Psychology and Education
Journal, 58(3), 979-989. https://doi.org/10.17762/pae.v58i3.3031
Khosravi, P., Rezvani, A., & Ashkanasy, N. M. (2020). Emotional intelligence: A
preventive strategy to manage destructive influence of conflict in large scale
projects. International Journal of Project Management, 38(1), 36-46.
http://dx.doi.org/10.1016/j.ijproman.2019.11.001
Kim, H. J., & Rho, P. (2017). Influence of the Big Five personality traits of IT workers
on job commitment and job satisfaction. International Information Institute
(Tokyo). Information, 20(5B), 3529-3537.
https://doi.org/10.14257/ASTL.2016.142.23
Kissi, E., Agyekum, K., Baiden, B. K., Tannor, R. A., Asamoah, G. E., & Andam, E. T.
(2019). Impact of project monitoring and evaluation practices on construction
project success criteria in Ghana. Built Environment Project and Asset
Management, 9(3), 364-382. https://doi.org/ 10.11648/j.rd.20210203.12
Kloppenborg, T. J., & Opfer, W. A. (2002). The current state of project management
research: trends, interpretations, and predictions. Project Management Journal,
33(2), 5-18. https://doi.org/10.1177/875697280203300203
Koeppen, K., Hartig, J., Klieme, E., & Leutner, D. (2008). Current issues in competence
modeling and assessment. Zeitschrift für Psychologie/Journal of Psychology,
216(2), 61-73. https://psycnet.apa.org/doi/10.1027/0044-3409.216.2.61
127
Kolawole, A. R., Abiodun, A. C., & Olamide, A. R. (2020). A Study of the Effect of
Personality Characteristics on the Effectiveness of Construction Project Managers
Performance. Covenant Journal of Research in the Built Environment, 8(1).
Kolb, D. A. (2014). Experiential learning: Experience as the source of learning and
development. FT press.
Kolz, A. R., Mcfarland, L. A., & Silverman, S. B. (1998). Cognitive ability and job
experience as predictors of work performance. The Journal of Psychology,
132(5), 539-548. https://psycnet.apa.org/doi/10.1080/00223989809599286
Kraczla, M. (2017). Personality profiling according to the Big Five model by P.T. Costa
and R.R. McCrae: Comparison analysis of managers and specialists. Regional
Formation and Development Studies, 22(2), 77-91.
https://doi.org/10.15181/rfds.v22i2.1479
Krchová, H. (2019). Research on behavioral competencies of project managers in
Slovakia. In International May Conference on Strategic Management (Vol. 15,
No. 2, pp. 233-242).
Kurz, R., & Bartram, D. (2002). Competency and individual performance: Modelling the
world of work. Organizational effectiveness: The role of psychology, 227, 255.
http://dx.doi.org/10.1002/9780470696736.ch10
Kutta, T. J., Preston, T. J., & Maranges, H. M. (2020). Goldberg vs Costa/McCrae Five
Factors. The Wiley Encyclopedia of Personality and Individual Differences:
Models and Theories, 225-229. https://doi.org/10.1002/9781118970843.ch38
Lamprou, A., & Vagiona, D. (2018). Success criteria and critical success factors in
Students also viewed