Construction Cost Estimating Final Project

profileKarim16

Using the Drawings (7 pages) and the Outline Specification provided of the Building Project shown perform quantity takeoff (just the quantity of material not cost) for only the following selected items of work. Use the attached Quantity Takeoff Sheets to show your calculations and steps, and your final quantities. Remember that well organized, and clearly written submission is very important for this project. (100 points)

  1. I)  Concrete
  2. II)  Masonry
  3. III)  Structural Steel


  • 8 years ago
  • 30
Answer(0)