Question 1
2/ 2pts
The typical mechanism for evaluating teams are peer reviews by all team
members of themselves and all other team members. In some cases, peer
reviews of some stakeholders are included as well.
false
Question 2
2/ 2pts
Evaluation of project team performance tends to be based on achieving
project objectives according to______.
ANSWER: All of these alternatives are correct.
Question 3
2/ 2pts
Motivation can be the chief challenge when wrapping up closure activities.
ANSWER: true
Question 4
2/ 2pts
Within which Maturity Model level are project audits performed on all
significant projects and lessons learned are recorded and used on
subsequent projects?
ANSWER: Management of Project Management System
Question 5
2/ 2pts
In organizations where projects are managed within a functional
organization, the team member's area manager, not the project manager, is
responsible for assessing performance.
ANSWER:true
Question 6
2/ 2pts
__________ of lessons learned are designed to improve performance on
current and future projects.
ANSWER:Retrospectives
Question 7
2/ 2pts
Performance appraisals generally fulfill two functions. The first is to identify
individual strengths and weaknesses and to develop action plans for
improving performance. The second involves salary or merit adjustments.
Why should these two functions be addressed at different times?
ANSWER: Employees are so eager to learn about a potential raise that they
tend to tune out constructive feedback.
Question 8
2/ 2pts
Which part of the audit report is designed to be the most useful on future
projects?
ANSWER: Lessons learned
Question 9
2/ 2pts
Which of the following summarizes project performance and provides useful
information for continuous improvement?
ANSWER: The audit report
Question 10
2/ 2pts
In organizations where projects are managed within a ____________, the team
member's area manager, not the project manager, is responsible for
assessing performance.
ANSWER: functional organization
Question 11
2/ 2pts
In premature project closure, the project may be completed early with some
parts of the project eliminated.
ANSWER: true
Question 12
2/ 2pts
The purpose of project evaluation is to assess how well
ANSWER: the project team, team members and project manager performed.
Question 13
2/ 2pts
The purpose of all maturity models is to enable organizations to assess their
_____ in implementing the best practices in their industry and move to
_______.
ANSWER: progress, improvement
Question 14
2/ 2pts
The retrospective facilitator should be able to deliver bad news to the project
sponsor or senior management without recriminations.
ANSWER: true
Question 15
2/ 2pts
The typical mechanism for the evaluation of teams is normally
ANSWER: a survey completed by the team members.
Question 16
2/ 2pts
The content of the audit report typically includes the following topics EXCEPT
ANSWER: team reviews.
Question 17
2/ 2pts
Each retrospective is assigned a(n) _________, typically a team member who
is very interested in and familiar with the retrospective. This individual will
serve as the contact point for anyone needing information relating to the
retrospective.
ANSWER: owner
Question 18
2/ 2pts
In retrospective methodology a facilitator uses several questionnaires to
conduct post-project audits. The facilitator acts as a guide who leads the
project team through an analysis of project activities. The facilitator must be
perceived as _____ and _____.
ANSWER: independent, unbiased
Question 19
2/ 2pts
A project closure where the project is completed early with some parts of the
project eliminated would be classified as a failed project.
ANSWER: false
Question 20
2/ 2pts
At what level of the Project Management maturity model is the project
information system fine-tuned; specific and aggregate information is
provided to different stakeholders?
ANSWER: Level 5
Question 21
2/ 2pts
Implementing project closure includes getting delivery acceptance from the
customer.
ANSWER: true
Question 22
2/ 2pts
The ________ section of the audit report includes concise and factual review
statements of the project, such as project scope objectives, quality
objectives, cost objectives, and schedule objectives.
ANSWER: analysis
Question 23
2/ 2pts
Project managers should wait to give feedback to the project team and team
members until the project has been completed. Giving feedback throughout
the project can distract project teams.
ANSWER: false
Question 24
2/ 2pts
Two views (perspectives) are collected when the audit questionnaires are
collected and two sets of questions are used for each view. What are those
two views?
ANSWER: Organization view and project team view
Question 25
2/ 2pts
Armed with information gleaned from one-on-one sessions and other
sources, the facilitator __________.
ANSWER: leads a team retrospective session.