simulation assigment using Arena program
1.
Original model in Assignment 02 is shown to production manager. He pointed out that this is only the first shift of a two-shift day and should be run for 10 days 16 hours per day (10 replications). He suggested the following things based on the results from the previous model:
- On second shift there are two operators at Rework (the bottleneck station)
-The Sealer fails sometimes
- Uptimes ~ exponential, mean 120 minutes
- Repair times ~ exponential, mean 4 minutes
Modify the existing model with the information above and then compare the
results with Assignment 02.doe.
1. Scheduled utilization
2. Record the Number of Scrapped Parts & Avg. Scrapped Parts Time in system (Use two Records) 3. Record the Number of Salvaged Parts & Avg. Salvaged Parts Time in system (Use two Records) 4. Record the Number of Shipped Parts & Avg. Shipped Parts Time in system (Use two Records)
2.
A flow line layout manufacturing shop, where manufactured parts (single type) are arriving at a rate of 3 parts/hr. Parts needs to pass through three consecutive machines namely: Drill, Tapping, and Painting machine. Processing times of the parts on the mentioned machines are shown in the following table:
10 years ago
40
Purchase the answer to view it

- maths_assignment.docx
- model4.zip
- Need help - Principles of Microeconomics
- Assignment 1: Health Care Human Resources Management
- Ruby takes a board that is 50 inches long and cuts it into two pieces one of which is 16 inches longer than the other .
- Accounting 220 Help Week 5- Chapter 10 & 11
- CJA 394 Week 2 Learning Team Assignment Policing Development and Operation Trends Paper
- writing essay
- Homework problems
- for JoyMercy
- Answers to Bus 599 Peregrine Assessment
- Psychology