simulation assigment using Arena program

profileammcllagraphy
assignment_021.pdf

Assignment (02)

Consider an Electronic Assembly/Testing System as shown in the figure. The figure also

gives the relevant data.

Develop an ARENA model and run it for five days of 8-hours shifts (30 replications) to

obtain the following results:

1. Utilization of all Resources. 2. Average total time in the system for Scrapped, Shipped and Salvaged parts. 3. Average waiting time and average number in queue for all Queues.

Note: The report should include:

1- An MS-WORD file contains the answers for the above questions, 2- The ARENA model file (i.e. *****.doe).