Time Measurement Worksheet

Time Measurement Worksheet
Operator: Shift: Date: Recorded by:
Scope of Operation: From: To:
Seq. No. Operation Elements Starting Point 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Charted times Remarks
Cycle Time (totals)
Use digital watch or stopwatch and record elements to nearest 0.1 second. Scan each row and, rounding to nearest second, specify “most repeatable” time to be the “Charted Time”.

&K000000&A &K000000&F

Combination Table

Standardization Work Combination Table Process Date Prod. Schedule 523 /Shift
Section Takt Time
Seq. Operation Elements Time Operation Duration ( )
Man Mach Wait Walk
Total

&K000000&A &K000000&F

Standardized Work Chart

Standardized Work Chart Last Update: Required PPE:
Process Owner
Scope of Operations From: Process Name Std WIP Takt Time Cycle Time # T/Ms Total Floor Space Product Travel T/M Travel
To:
Seq. Operation Elements Symbol Travel Distance Manual Time Wait Walk Cumulative Time Visuals
Total
Symbols
Safety Mutilation Ergonomic Quality Regulated Environ- In-Process Security Visual
Hazard Key Point Check Process mental Stock Key Point Check

&K000000&A &K000000&F

Work Balance Chart

Work Balance Chart Cell or Line Name
Takt Time (sec.)
Process 1 Process 2 Process 3 Process 4 Process 5 Process 6 Process 7 Process 8 Process 9 Process 10 Process 11 Process 12 Process 13 Process 14 Process 15
Name:

&K000000&A &K000000&F

Cycle Time ( )

Operation Work Standards Sheet

Operation Work Standards Sheet Date of Last Update:
Process Name: Part Name:
Process Number: Part Number:
Seq. No. Operation Elements Symbol Key Point Visual
Other Considerations
Symbols
Safety Mutilation Hazard Ergonomic Key Point Quality Check Regulated Process Environ-mental In-process stock Security Keypoint Visual Check
TEAM SIGN-OFF
SHIFT T/M T/M T/M T/M T/M T/L G/L OR SUPV MGR TNG COORD
1
2
3

&K000000&A &K000000&F

Job Breakdown Sheet

Job Breakdown Sheet
Process name: Part name(s): Tools & Materials required:
Process number: Part Number(s): Safety equipment:
Major Steps (What to do) Key Symbols Key Points (How to do it) Reasons for Key Points (What happens if not done)
Symbols
Safety Mutilation Ergonomic Quality Check Regulated Environmental In-Process Security Visual
Hazard Key Point Process Stock Key Point Check
TEAM SIGN-OFF
SHIFT T/M T/M T/M T/M T/M T/L G/L OR SUPV MGR TNG COORD
1
2
3

&K000000&A &K000000&F

Takt Time worksheet

Takt Time Worksheet
Calculate Takt Time
Takt time is the pace to which work is designed and conducted, as set by customer demand.
Time available divided by smoothed demand
Step 1: Determine the time available
Hours in shift converted to minutes (x60): Hrs 0 0 Example: 480
Subtract breaks and lunch (in minutes): -50
Subtract planned downtime (in minutes): (Maintenance, changeovers, special meetings, etc. -30
Subtract unplanned downtime (in minutes) based on overall equipment effectiveness (OEE): OEE 0.85 -72
Total time available per shift, in seconds and in minutes Minutes: 0 Minutes: 328
Seconds: 0 Seconds: 19680
Standard shifts per day:
Number of shifts per week to make available 0
Step 2: Determine the average customer demand over all products produced in this work cell.
(Numbers should come from sales figures, not cost accounting or production planning - Capture the true demand)
Products Per month Per week Per day Per shift* Takt time (sec) Takt time (min) Per month Per week Per day Per shift Takt time * Takt Time (mins)
Product A 0 0 ERROR:#DIV/0! ERROR:#DIV/0! ERROR:#DIV/0! 200 50 10 5 3936 66
Product B 0 0 ERROR:#DIV/0! ERROR:#DIV/0! ERROR:#DIV/0! 450 113 23 11 1749 29
Product C 0 0 ERROR:#DIV/0! ERROR:#DIV/0! ERROR:#DIV/0! 600 150 30 15 1312 22
Product D 0 0 ERROR:#DIV/0! ERROR:#DIV/0! ERROR:#DIV/0! 90 23 5 2 8747 146
Totals and Average Takt time 0 0 0 ERROR:#DIV/0! ERROR:#DIV/0! ERROR:#DIV/0! 1340 335 67 34 587 9.79

&K000000&A &K000000&F

Basic Symbols

Manual Work Time Auto feed / machine time

Walk Time

Wait Time

Machine Start

Brief Motion (>1'')

t.t. Takt Time (draw vertically on table)

Basic

Symbols

Manual Work Time

Auto feed / machine time

Walk Time

Wait Time

Machine Start

Brief Motion (>1'')

t.t.

Takt Time (draw