OPERATION MANAGEMENT

profilearoojch
8435536.xlsx

Sheet1

Item Lead Time On- Hand Inventory Components Heather Adams, production manager for a Colorado exercise equipment, needs to schedule an order for 50 UltimatSteppers, which are to be shipped in week 8. Subscripts indicate quantity required for each parent. Assume lot-for-lot ordering. Below is information about the steppers:
Stepper 2 20 A(1),B(3),C(2)
A 1 10 D(1),F(2)
B 2 30 E(1),F(3)
C 3 10 D(2),E(3)
D 1 15
E 2 5
F 2 20
a)      Develop a product structure for Heather b) Develop a time-phased structure
F
A
D
F Steepper
B
E
D
C
E
week1 week2 week3 week4 week5 week6 week7 week8
c)      Develop a net material requirements plan for F.
Level: 1
Parent: Nil
Item: stepper
Lead Time: 2
Quantity: 50
Lot Size: LOL
Week Number 1 2 3 4 5 6 7 8
Gross Requirements 50
Scheduled Receipts
On-hand 20 20 20 20 20 20 20 20
Net Requirements 30
Planned Order Receipts 30
Planned Order Releases 30
Level: 2
Parent: Stepper
Item: A
Lead Time: 1
Quantity: 30
Lot Size: LOL
Week Number 1 2 3 4 5 6 7 8
Gross Requirements 30
Scheduled Receipts
On-hand 10 10 10 10 10 10
Net Requirements 20
Planned Order Receipts 20
Planned Order Releases 20
Level: 2
Parent: Stepper
Item: B
Lead Time: 2
Quantity: 90
Lot Size: LOL
Week Number 1 2 3 4 5 6 7 8
Gross Requirements 90
Scheduled Receipts
On-hand 30 30 30 30 30 30
Net Requirements 60
Planned Order Receipts 60
Planned Order Releases 60
Level: 3
Parent: A,B
Item: F
Lead Time: 2
Quantity: 200
Lot Size: LOL
Week Number 1 2 3 4 5 6 7 8
Gross Requirements 180 20
Scheduled Receipts
On-hand 20 20 20 20
Net Requirements 160 20
Planned Order Receipts 160 20
Planned Order Releases 160 20

Stepper

A(1)

F(3)

C(2)

B(3)

D(1)

F(1)

E(1)

E(3)

D(2)