This week's assignment is to create a work breakdown structure (WBS) for the project you selected during Unit 2. This is part of your Course Project.

Instructions:

Create a high-level WBS comprised of at least three levels:

  • Each level should have with a minimum of five level 1 tasks, with two level 2
    tasks, and three (3) Level 3 tasks.
  • Describe each task (work package) in your WBS with just enough information so
    that everyone in the team can understand what each work package means.
  • Level Numbering:
    o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1.1.3, 1.2.1,
    1.2.2. 1.2.3 etc.
    Requirements:
  • Submit a Word document.
  • There is no need to use APA formatting for this assignment