Statistical Process Control Methods
1. Evaluate the process flow chart using the LEAN concept to find ways to eliminate waste and improve the process.
2. Calculate the defined process metrics including variation and process capability; and develop and display a control chart for the process
3. Write a 700-word executive summary that includes the following:
· A summary of the Process Evaluation (using either Lean or SPC or Six Sigma)
· A summary of the Evaluation of Control Chart and Process metrics based on SPC methods
· A summary of your evaluation of whether the process would benefit from the use of Six Sigma, Lean, or other tools
· A description of the SPC project and recommendations for improvements
5 years ago
55
Answer(1)![blurred-text]()
![]()
Purchase the answer to view it

NOT RATED
- order_150884_406985.doc
