MATH STATISTICS

profilethaaaeun

excel spreadsheet attached consists of the actual time used and potential (the best time possible for this review process) to complete each step in the review process. 


The actual times are based on the review of 30 projects. The potential times are subjective engineering judgment estimates.


Use the data in the attached table and answer the following questions:


1. What are the sources of value-added and non-value-added work in this process?

2. Where are the main opportunities to improve the cycle time of this process, with respect to both actual time used and the potential best times? What strategy would you use?

3. Step 10: Resolve Open Issues required 104 hours (potential) versus 106 hours (actual). Is there an OFI here? Why or why not? If so, how would you attack it?

4. What do you think are the most difficult critical issues to deal with when designing a sound cycle time study such as this one?

 


NO (MINIMUM) LIMIT OR WORD COUNT ON QUESTIONS; APA FORMAT NOT REQUIRED.


THESE ARE BASIC MATH/STATISTICS QUESTIONS - THEY DO NOT REQUIRE ESSAY ANSWERS