a) Construct a value stream map (VSM) for the new product developed under section a) and b) using a MS Office program. It should have a supplier at the one end and a customer at the other end, an information flow with minimum one core activity,

profilejohnstone-20

 

a) Construct a value stream map (VSM)  for the new product developed under section a) and b) using a MS Office  program. It should have a supplier at the one end and a customer at the  other end, an information flow with minimum one core activity, a  material flow with at least five core activities, at least three  inventory locations. You should also enter the value added and non-value  added times for all core activities and inventories, and determine the  ratio of value added and non-value added times

b) As part of the VSM that you created  earlier, pick at least four different waste forms and identify at least  two examples for each of the four waste forms (all together eight  examples)

Determine at least one root cause for  each waste example and recommend at least one improvement action for  each of the root causes (all together eight root causes and eight  improvement actions)

c) For the process that you picked  earlier for value stream mapping, construct a production (layout) floor  plan (with at least five core activities) using a MS Office program.  Determine the location of equipment, personnel, inventory, etc. as well  as the flow of materials/goods with their proper names.

d) For your product, construct a JIT  production flow based on a Kanban Pull system. Label all the elements  and activities within the layout, and describe how the pull system  works. 

    • 6 years ago
    • 6
    Answer(1)

    Purchase the answer to view it

    blurred-text
    • attachment
      426peerre.docx