1 / 7100%
z
S -Gate
P
z
M elements the stage-gate
I ord to e imp the innova option, the adoption of st -g proce would
critical.
T k st that w be in int the proce include:
S
B Plan Concept
D (E , 2015)
T and
L and implem
E st would an int role t ef incr innov in th business
.
z
C ..
so IoT c could be e int
the pr .
-st aspects so grad modifica ar could be
.
the pre stag .
error addr the same.
Students also viewed