z
S -Gate
P
z
M elements the stage-gate
▪I ord to e imp the innova option, the adoption of st -g proce would
critical.
▪T k st that w be in int the proce include:
▪S
▪B Plan Concept
▪D (E , 2015)
▪T and
▪L and implem
▪E st would an int role t ef incr innov in th business
.
z
C ..
•
so IoT c could be e int
the pr .
•
-st aspects so grad modifica ar could be
.
•
the pre stag .
•
error addr the same.