1 / 8100%
Quiz: Closing Project Risk
Due Mar 8 at 11:59pm Points 50 Questions 25 Time Limit 45 Minutes
Instructions
The quiz:
Covers the Learn material from Module 8: Week 8.
Contains 25 multiple-choice, true/false questions.
Is limited to 45 minutes.
Allows 1 attempt.
Is worth 50 points.
Submit this assignment by 11:59 p.m. (ET) on Friday of Module 8: Week 8.
Attempt History
Attempt Time Score
LATEST Attempt 1 45 minutes 40 out of 50
Correct answers are hidden.
Score for this quiz: 40 out of 50
Submitted Mar 1 at 7:27pm
This attempt took 45 minutes.
Question 1
2 / 2 pts
Which of the following DQSs would be “an established workflow to allow for
review and approval” during Program Evaluation Management?
controlled
organized
consistent
legible
Question 2
2 / 2 pts
In the Plus/Minus/Delta review technique, what question is being asked for
items such as issues that should be corrected or items that should be
revised?
What are minuses?
What are deltas?
What are plusses?
What are deviations?
Question 3
2 / 2 pts
The Capability Maturity Model Integration (CMMI) process is defined by five
maturity levels. Which level would be categorized by a focus on process
improvement?
Level 2: Managed
Level 5: Optimizing
Level 4: Quantitatively Managed
Level 1: Initial
Question 4
2 / 2 pts
Due to the changing nature of Agile, PMI has not developed a certification for
this project management approach.
True
False
Question 5
2 / 2 pts
When using the Plus/Minus/Delta approach, it is best to include very detailed,
descriptive narrative since storage of this material is digital.
True
False
Question 6
2 / 2 pts
Macroevaluation has proven less effective than microevaluation due to the
need for specifics in project evaluation.
True
False
Question 7
2 / 2 pts
In which of the following industries was Agile born?
construction
healthcare
IT
financial
Question 8
2 / 2 pts
Which of the following is one of the twelve principles of the Agile Manifesto?
Working software is the principal measure of progress
Self-organizing teams
both a and b
neither a or b
Question 9
2 / 2 pts
Agile project management would be inappropriate in industries such as
construction or hospitality.
False
Question 10
2 / 2 pts
The Key Evaluation Checklist would include all of the following steps EXCEPT:
Storage and dissemination
Preliminaries
Subevaluations
Conclusions and implications
Question 11
2 / 2 pts
Program Evaluation Management (PEM) seeks to manage the determination
of merit (quality), worth (value) or _____ in projects.
connection (link to customer)
applicability (ease of use)
significance (importance)
cost (budget)
Question 12
2 / 2 pts
The term Agile refers to something being light, flexible, and lively.
True
False
Question 13
0 / 2 pts
Agile Retrospectives (ARs) need to be communicated at the right time, at the
right place, and _____.
to the right people
in the right way
both a and b
neither a or b
IncorrectQuestion 14
2 / 2 pts
The purpose of evaluation reporting includes convey information, facilitate
understanding, and trace deviation for responsibility.
False
IncorrectQuestion 15
2 / 2 pts
Effective Knowledge Transfer will catalog all knowledge available in an
organization.
False
Question 16
2 / 2 pts
What is the best answer to the question “Who is ultimately responsible for
KT?”
front line workers are most responsible
KT consultants
it is up to the organization
none of the above
Question 17
2 / 2 pts
From a philosophic perspective, Knowledge Transfer would include all of the
following EXCEPT:
KT is not needed for smaller business due to the resources required
KT enables the adoption of insights
KT may occur as a one-time event or can be a continuous process
KT embraces principles of adult learning theory
IncorrectQuestion 18
0 / 2 pts
Collaborative Evaluation is a partnership approach to conducing LL that
engages _____ in the evaluation process.
the project team
shareholders
upper management
stakeholders
Question 19
2 / 2 pts
According to Layton, Agile projects are built on the following principles
EXCEPT:
frequent interaction
transparency
predictability
adaption
Question 20
2 / 2 pts
A chart that illustrates the start and finish dates, dependencies, and key
elements is called a _____ chart.
WBS
Gantt
Pert
PMND
Question 21
2 / 2 pts
The question of how knowledge is transferred includes items such as ____.
people
location
repositories
all of the above
Question 22
2 / 2 pts
A technique for creating images to communicate a message is _____.
rendering
illustration
visualization
presentation
Question 23
2 / 2 pts
Agile project management is the preferred method for software projects.
True
False
Question 24
2 / 2 pts
Knowledge Transfer (KT) is iterative in nature.
True
False
Question 25
2 / 2 pts
An evaluation plan is a proposal that describes the process that will be used
to guide an evaluation.
True
False
Quiz Score: 40 o