Section 1: Foundation of the Study
Driven by the success of information technology (IT) project managers and the
projects they administer; technological innovations have taken prominence in much of
the business world. Within the past 30 years, 10 of the top 20 innovations in the world
involved technology and computers (Thomas, 2015) thus indicating the rise in
importance of technological innovations. For business leaders to remain competitive, the
success of IT projects is of paramount importance (Poonpool et al., 2013). To ensure the
success of IT projects, these business leaders must employ project managers who have
shown both an aptitude and successful record of implementing projects and a level of
adaptation to new technology. Project managers who create strategies aligning properly
with the goals of the organization are valuable because the business leaders can then
focus on other portions of the business (Singh & Khamba, 2016). However, because IT
project success rates are as low as 67% (Qin, Guangping, & Xuyan, 2017), IT project
managers and the key strategies they use are important to ensure higher success rates in
an industry that is constantly growing.
Background of the Problem
In 2011, businesses spent $3.7 trillion on IT and information system (IS) projects
with the expectation of success across every project (Wamba et al., 2017). The project
failure rate of 67% is concerning both for experienced project managers and for those
entering the field for the first time (Curtis et al., 2017; Obradovic, Kostic, & Mitrovic,
2016). Even though a 68% failure rate is an improvement from years past, the lack of
success in the project management field directly affects a business and those employed in
2
it. Leaders of businesses engaging in IT and IS projects expect success to help implement
their business processes, but without a higher success rate, strategies for successful IT
projects are failing at an alarming rate (Lai, Hsu, & Li, 2018).
Researchers have studied success rates of IT and IS projects and the strategies
involved in achieving project success (Javani & Rwelamila, 2016). The deliverable of the
projects includes phases, industries, regions, stakeholders, and organization (Rezvani et
al., 2016). Aaltonen and Kujala (2016) explored the impact on IT and IS project success
of project environment, business strategy, and project strategy. Additional categories for
IT and IS projects include strategic alignment, coordination, clear goals, and
requirements (Hermano & Martin-Cruz, 2016; Singh & Khamba, 2016). Most research
has focused on the categorization of specific project types and the definition of success
for IT and IS projects. In this study, I explored the strategies used by IT project managers
to successfully deliver IT projects.
Problem Statement
With 50% of capital investments in IT projects over the last 10 years, business
leaders need to invest in the right projects to contribute to organizational sustainability
(Bhutani, Kumar, Garg, & Aggarwal, 2016). Despite researchers focusing on explaining
and mitigating the problem of project failure, the success rate for IT projects is 67% with
fewer than 50% of projects completed on time and within budget (Qin et al., 2017). The
general business problem was that some companies are losing productivity and money
due to failed IT projects. The specific business problem was that some project managers
in the IT sector lack strategies for delivering successful IT projects.
3
Purpose Statement
The purpose of this qualitative multiple case study was to explore the strategies
project managers in the IT sector use for delivering successful IT projects. The targeted
population consisted of six IT project managers from three businesses in Northeast Ohio
who had developed and implemented strategies for delivering successful IT projects. The
implications for social change included the potential for business owners to learn
strategies to successfully complete IT projects, thereby allowing owners to increase and
conserve financial resources to create more jobs or pay higher wages to current
employees. New employees and employees who earn more may spend more money
within their communities, contributing to local economic growth.
Nature of the Study
Qualitative researchers focus on interviewing participants and collecting data
from a natural setting to understand why a phenomenon occurs (Gehman et al., 2018). A
qualitative approach was appropriate for this study because I explored strategies used by
project managers to positively impact the success of IT projects. Researchers using a
quantitative method analyze numeric data to test predetermined hypotheses and to present
justification of research conclusions (Park & Park, 2016). I did not collect and analyze
numeric data to test hypotheses. Therefore, a quantitative method was not appropriate.
Researchers using a mixed methods approach include quantitative and qualitative
components (Annansingh & Howell, 2016). Because I did not use a quantitative element
to explore the strategies used to deliver successful IT projects, a mixed methods approach
was not appropriate.
4
A researcher uses a case study design to explore a phenomenon and to investigate
a problem within context (Ji, Plakoyiannaki, Dimitratos, & Chen, 2019). The case study
design was appropriate to my research because of the defined boundary of the selected
population for my study topic. I explained, based on this research, the strategies behind
successful IT projects. Researchers use a phenomenological design when attempting to
understand human behavior rather than explaining the behavior (Clayton, 2016). When
researchers use a phenomenological design, they study existence and focus on the
meanings of participants’ lived experiences (Saunders, Lewis,, & Thornhill, 2015). I
explored the strategies project managers use to deliver successful IT projects. Therefore,
the phenomenological method was not appropriate for this study. Researchers use an
ethnographic design to explore the customs of people or communities (Robson, 2016). I
explored the strategies used by IT project managers to support their delivery of successful
projects, so an ethnographic design was not appropriate.
Research Question
RQ: What strategies do project managers in the IT sector use for delivering
successful IT projects?
Interview Questions
1. What strategies have you used to deliver successful IT projects?
2. How did you develop these strategies to deliver successful IT projects?
3. How did you measure the effectiveness of the strategies to deliver successful
IT projects?
5
4. Based on your measurement of effectiveness, what strategies did you find to
be necessary to deliver successful IT projects?
5. Based on your measurement of effectiveness, what strategies did you find to
be unsuccessful for the delivery of IT projects?
6. Please provide any additional information about strategies for the delivery of
successful IT projects that we have not yet discussed.
Conceptual Framework
The conceptual framework for this study was coordination theory as proposed by
Malone and Crowston in 1990. The tasks, processes, and principles governing the
coordination of a project are all part of coordination theory (Malone & Crowston, 1990).
Included in these tasks, processes, and principles are also identifiers that assist project
members in coordinating not only the activities performed but the project members
themselves. Without coordination in a project, the project manager will likely fail at the
implementation of a project (Madsen, 2013). Crowston (1997) observed that within
coordination theory dependencies exist in any situation but that leaders mitigate these
dependencies in multiple ways. One of these dependencies is risk. Risk exists when
project managers decide how to move forward with those projects. In addition, when
considering the systems development lifecycle for projects managers, a focus on
sequential and linear development is important (Stoica et al., 2016). Project managers can
use coordination theory to deal these and other factors to support their efforts to control
outcomes in administering IT projects (Karpowicz et al., 2018). I used coordination
theory as a lens to explore how project managers develop and deploy strategies to
6
successfully deliver IT projects in the time allotted while adhering to the budget of the
project. Coordination theory is a tool that project managers can use to achieve project
alignment with stakeholder requirements and resource restraints. Because IT project
managers need structure, coordination theory can be used to explore strategies that
positively impact IT project success rates.
Operational Definitions
Information technology (IT): IT is a function of computing and computers to
store, retrieve, transmit, and manipulate data for a business (Thatcher, Wright, Heshan,
Zagenczyk, & Klein, 2018).
Information system (IS): IS is a system that collects, organizes, stores, and
communicates information to organizations (Gupta, Kannan, & Sanyal, 2018).
Project life cycle: The project life cycle is a defined set of steps project leaders
use to organize a project. Project teams can use the organization of the project life cycle
to successfully implement a project from start to finish (Ruiz-Espiga, Severino, &
Humero, 2018).
Project manager: A project manager has responsibilities including planning and
execution of a project while also administering the project budget, project plan, and
project charter (Oliveira, Alencar, & Costa, 2018).
Project strategy: Project strategy includes goals and plans for a project and is
closely related to the larger strategy of the parent organization (Kapustin & Grushevenko,
2018).
7
Systems development life cycle (SDLC): The SDLC is the framework
professionals use to design, create, and test, and deploy software (Kneuper, 2017).
Virtual project teams: Virtual project teams are groups of employees working for
the same business using tools that enable them to communicate and work with one
another while not located in the same area (Zuofa & Ochieng, 2017).
Assumptions, Limitations, and Delimitations
Assumptions
How a researcher views a phenomenon is a combination of knowledgeable beliefs
and experiences that lead to assumptions (Antonenko, 2015). For this study, I assumed all
participants were project managers and had more than 1 year of experience in the field. I
also assumed that the project managers had completed at least one IT project on time and
on budget. I mitigated these assumptions by vetting each project manager on their
experience and provided them with the background of the study. I further assumed that
the participants would answer all questions truthfully. To allay participant concerns about
confidentiality, I informed participants that each interviewee receives a unique code in
lieu of using their first and last name. Finally, I assumed that I would be able to identify
enough participants in the Northeast Ohio region.
Limitations
Limitations are the challenges and issues that cannot be controlled by the
researcher (Schary & Cardinal, 2016). The main limitation in this study was the
requirement that all participants must be a project manager. From there, I limited the
study to only include project managers with 1 or more years of experience and those who
8
have achieved success in at least one project. I included only project managers in the
Northeast Ohio region, which limited the generalizability of study findings to other
geographic regions.
Delimitations
Delimitations are those characteristics that researchers use to define the scope of
their research (Hill, Knafl, & Santacroce, 2018). I focused only on the IT project
managers and IT industry located in Northeast Ohio. Because of the assumption that there
is enough research material to focus on the Northeast Ohio region, I limited the study to
only this area.
Significance of the Study
To successfully implement projects, project managers complete many actions to
deliver the project on time and within budget. As Qin et al. (2017) observed, project
managers complete fewer than 50% of projects on time and within budget. Leaders of
organizations might use findings from this study to identify strategies they can implement
to begin and close IT projects with an enhanced likelihood of success.
Contribution to Business Practice
Project managers perform data collection, data analysis, and processing to
successfully implement projects. By understanding and using all phases of the project
lifecycle, project managers may be able to achieve higher rates of project success and
project coordination (van Marrewijk, Ybema, Smits, Clegg, & Pitsis, 2016). Guo (2019)
observed that project managers with a better understanding of the project lifecycle and
processes for improved project coordination incorporated better communication practices
9
and increased the potential for higher success rates of project implementation. Findings
from this study may assist project managers in identifying strategies they can use to
increase the likelihood of successful project implementations. Project managers who
increase the success rate of project implementations may provide their organizations with
more financial and resource flexibility to support other projects or departments for
improving the organizations’ performance.
Implications for Social Change
Project managers who are more successful in the implementation of IT projects
assist the organization in saving money on projects and enable cost savings to be passed
on to consumers. Project managers can create positive project results by using the
processes of successful IT projects to potentially create an opportunity to hire additional
employees due to the cost savings from IT projects. Guo (2019) observed that successful
administration of projects is of paramount importance to the survival and growth of an
organization. By learning and applying key strategies to deliver successful IT projects,
organizational leaders may increase the effectiveness of their organizations and gain
financial resources necessary to pursue expansion and improve the stability of their
organizations, thereby contributing to the growth of the local economy and communities.
A Review of the Professional and Academic Literature
In this section, I provide a comprehensive review of the literature regarding the
strategies that IT project managers have used to successfully implement IT projects. I
organized the literature review by analyzing broad theories followed with a focused look
at IT project management and successful project implementation. The literature review is
10
organized into four sections: (a) coordination theory, (b) systems development life cycle,
(c) project life cycle, and (d) project management.
In the first section, I explain how the conceptual framework is associated with this
study by focusing on coordination theory. Coordination theory was appropriate for this
study because an IT project is a complex and multifunctioning system with numerous
interdependent components requiring coordination to function successfully (Momeni &
Martinsuo, 2019). By using coordination theory, I combined both the smaller scope of the
study and the main functions of how an IT project functions successfully. By using
coordination theory, researchers are able to more deeply explore how and why
components and individuals work together successfully (Crowston, 1997; Malone &
Crowston, 1990).
In the second section, I provide a review of the current literature regarding the
definition and application of the SDLC. The SDLC phases include systems planning,
systems analysis, systems design, systems implementation, and systems maintenance
(Church, Schmidt, & Smedley, 2016). Because of the amount of risk involved in IT
projects, IT project managers must control as much of the process as possible while also
monitoring the changes in technology and the IT industry to be successful (Thalmann et
al., 2014). IT project managers assist organizational leadership by implementing
solutions that will best assist those organizational leaders in making the best decisions for
the organization. The strategies implemented by organizational leadership depend, to an
extent, on the effectiveness of IT project success and implementation (Williams, 2016).
Because of the importance of IT projects, project managers must understand the phases of
11
the SDLC and must successfully navigate each phase to completion for the best results
for the organization.
In the third section, I review the current literature regarding the definition and
application of the project life cycle. The phases of the project life cycle include initiating,
planning, executing, closing, monitoring, and controlling (van Marrewijk et al., 2016).
Similar to the SDLC, the project life cycle involves a level of uncertainty because of the
technology and changes within the technology industry. Project managers must fully
understand the project life cycle to control the responsibilities and tasks involved in each
successive phase (Rasnacis & Berzisa, 2017). The project life cycle includes the same set
of successive phases that will occur one after another as each phase completes
(Yalegama, Chileshe, & Ma, 2016). Project managers who understand the project life
cycle and are capable of controlling tasks and resources of each phase are more likely to
be successful than those project managers unable to exert control.
In the fourth section, I review the current literature regarding project management
as a discipline. The principles and procedures of project management create a foundation
for both project managers and organizations to deliver the best possible product or
service (Martens & Carvalho, 2017). Due to the increasing complexity and difficulty of
successfully implementing IT projects, project managers are required to understand the
processes and procedures of project manager at an expert level (Torp & Klakegg, 2016).
The project management tenets provide a foundation for a project manager to be
successful in the implementation of a successful IT project. Organizational leaders and
project managers explore potential informational cues to define a successful IT project
12
and also use that information to determine additional changes or updates (Zickert &
Beck, 2012).
For the literature review, I gathered information related to the research question
from peer-reviewed articles, dissertations, doctoral studies, and related academic
websites. My primary location for gathering data was the Walden University databases. I
used the Business Source Complete, ABI/INFORM Collection, Emerald Insight, SAGE
Journal, and ProQuest Dissertations & Theses Global databases as the primary sources
for researching and documenting journal articles. I used related academic websites to
locate articles that contained information related to the research question. For the
database searches, I used the same set of keywords to locate articles. The primary
keywords included project management, information technology, information technology
project management, systems development life cycle, project life cycle, information
technology projects, and coordination theory.
I cited 219 literature sources in this study. Of those 219 sources, 212 were peer-
reviewed and 163 were within 5 years of the anticipated publication of this study. In
Table 1, I provide the literature source statistics for the (a) total number of sources; (b)
number of peer-reviewed sources; (c) number of sources within 5 years of the anticipated
graduation date of September, 2020; (d) percentage of peer-reviewed sources related to
the total number of sources; and (e) percentage of sources within 5 years of the
anticipated graduated date of September, 2020, related to the total number of sources.
13
Table 1
Summary of Literature Review Sources
Total sources
Peer-reviewed
sources
Sources published
within five years
(2016 - 2020)
Sources (number)
219
212
163
Percentage
100%
97%
74%
The topic of this qualitative multiple case study was the exploration of key
strategies for the successful implementation of IT projects. To explore these strategies, I
used coordination theory as the conceptual framework for the study. Researchers using
the coordination theory analyze the procedures and activities of specific segments of the
business and how those specific segments affect the organizational effectiveness when
coordinated properly (Crowston, 1997; Jing et al., 2018).
Coordination Theory
Project managers must use a method that assists them in setting up and
completing the project. Malone and Crowston (1990) developed the body of principles
known as coordination theory. Coordination theory includes the coordination of activities
that describes and defines how individuals work together (Crowston, 1997; Malone &
Crowston, 1990). The coordination of activities and information processing by more than
a single team member is greater than that of a single team member, thus creating a benefit
for the project manager to manage dependencies between projects (Crowston, 1997).
Organizational coordination refers to multiple groups or individuals working to complete
specific tasks (Havakhor & Sabherwal, 2018). Project managers are tasked with
14
coordinating human and nonhuman resources to best complete projects (Malone &
Crowston, 1994). As defined by Malone and Crowston (1994), effective coordination is
not seen and is unnoticed by most.
When leaders make a concerted effort to increase the level of coordination within
an organization, collaboration improves, and teams work together more effectively. By
coordinating both the economic and social influence of an organization, leaders can
enhance organizational performance and effectiveness (Santos & Baptista, 2016).
Leadership empowering individuals is essential to increasing the amount of coordination
throughout all levels of work. These individual team members use different types of
coordination to work with others on their teams by creating points of reference that are
easily managed (Luna & Terra da Silva, 2015). The types of coordination found by Luna
and Terra da Silva (2015) were the forming of shared goals and objectives, the building
of a shared knowledge base, and the creation and development of common language to
more easily communicate. This sharing of goals, objectives, knowledge, and language
improves organizational capabilities by enhancing communication amongst team
members. Coordination is a required function for project managers and those managers
using the principles of coordination theory to successfully implement IT projects.
Researchers from many disciplines use the tenets of coordination theory.
Coordination theory affects numerous disciplines, including computer sciences,
management sciences, economics, linguistics, and psychology (Malone & Crowston,
1994). Because of the versatility of coordination theory, I used it as a lens to explore the
strategies used by IT project managers to successfully implement and execute projects.
15
Four coordination processes and groups identified by Malone and Crowston (1994) are
the following: (a) management of shared resources and assignments of tasks, (b)
management of producer-consumer relationships, (c) management of tasks occurring
simultaneously, and (d) management of task and subtask relationships. Project managers
use each of the four coordination processes identified while implementing projects
successfully. Project managers also govern dependencies within the project which are
directly related to the coordination processes and project success (Crowston, 1997).
While governing these dependencies, effective project managers work through all four
coordination processes instead of only focusing on one process.
IT project managers must manage project teams and the resources, time, and
capital, while coordinating the actions of all resources interacting together. Because
functional boundaries exist within an organization, leaders must create coordination
processes to empower the project managers to achieve success (Jiang & Klein, 2014).
The significance of the success of project managers is on display because of the
importance of competitive advantage in global business. Project managers using the
coordination principles and processes ensures the success of IT projects, thus increasing
the competitive advantage of an organization (Banks, Pollack, & Seers, 2016). To
achieve corporate goals such as competitive advantage and successful project
implementation, IT leaders must focus on coordinating and engaging the project teams
and activities.
Resource allocation is a central concept for project managers. Successful project
managers create processes for resource allocation activities to ensure consistency across
16
multiple tasks and projects. The assignment of resources to tasks and the determined
amount of time each task requires is included in the planning of the project manager
(Malone & Crowston, 1994). Few organizations have unlimited resources to dedicate to
every project, so the importance of reliable resource allocation practices is easily visible.
Successful project managers create reasonable and easily understood project plans and
resource allocation plans to help leadership understand the resources needed to complete
a project, thus demonstrating why a specific project should receive resources over
another project (Parameswar, Dhir, & Dhir, 2017). The producer-consumer relationship
involves a notification process resulting in an activity creating an output that another
party can use in a separate activity (Malone & Crowston, 1994). Project managers must
manage interrelated tasks and resources, thus showing the importance of the producer-
consumer relationship where the output of one team directly affects another team or team
member. The communication between and among groups regarding decisions are an
important facet of every phase of the project to ensure consistent and reliable use of
coordination theory (Rodriguez, Ortega, & Concepcion, 2016).
IT project managers focus on implementing procedures and methods that help
them facilitate communication and success. Organizational leaders and project managers
determined these procedures and methods to ensure proper alignment with teams and
resources. Project managers focus on the alignment of organizational goals, teams, and
resources to achieve the goals of projects as laid out by leadership teams. When project
management or organizational leadership do not create the necessary coordination and
alignment, mistakes occur in the project, thus creating issues for project team members
17
and leadership (Jiang, Klein, & Fernandez, 2018). All leaders, project managers, and
team members should have a basic and shared understanding of the goals of the project
leading to a greater amount of collaboration and coordination among groups within an
organization (Xia, Dawande, & Mookerjee, 2016). When project managers accomplish
alignment of goals and coordination, the project team has a better understanding of what
is required of them. Leaders in the organization also require alignment of goals and the
project teams to implement effective strategies to ensure success.
All project teams have a multitude of activities to complete the project goals and
interaction among these teams is an important part of organizations. Xia et al. (2016)
found that effective and efficient collaboration among teams proved why activity
coordination is so important to project managers. Complex projects and processes require
more coordination to be successful; otherwise, it is possible for activities to become out
of sync. When project activities are not properly aligned, the project manager is at risk
for failing to meet expectations and requirements as set forth by stakeholders. Because of
a high degree of complexity of some IT projects, project managers must have a full
understanding of the project, the resources available, and the goals of the project. If the
project manager does not maintain effective coordination, the functions of the project can
become inefficient or corrupt, thus causing more work, longer timeframes, and increased
use of resources (Jiang et al., 2018). Through clean and efficient coordination practices, a
project manager increases the likelihood of project success and positive communication
with stakeholders (Xia et al., 2016).
18
Communication amongst project managers and their project teams is of
paramount importance to the goals of project managers and the project stakeholders.
Patanakul, Kwak, Zwikael, & Liu (2016) found that efficient and timely coordination
processes increase the likelihood of success of a project. Project managers can manage
large projects or small projects, but the complexity of large projects likely includes
additional tasks and communication for the project manager. As projects increase in size,
coordination of activities including communication, resource use, and team expenditures
become more important. Establishing effective coordination processes at the beginning of
a project is necessary to avoid a change in processes later or to avoid costly errors (Jiang
& Klein, 2014). Stakeholders expect the coordination processes to achieve positive
results and rely on the project manager to ensure these processes are occurring along with
communication along all levels of the project.
One of the most vital skills for a project manager to possess is the ability to
coordinate with project stakeholders and project team members. According to Wang Han,
de Vries, & Zuo (2016), there are three project features that require some level of
coordination by a project manager and the project team. To be successful, members of the
project team must solve all issues and continually work toward the goal as set forth by the
stakeholders. Project managers use the first feature of identifying projects as being large
or small to demonstrate the importance of effective coordination functions. Project
managers then focus on the second feature of requiring increased coordination of
activities as the project environment changes or adapts, which potentially causes
confusion in the project life cycle. Lastly, project managers are required to ensure that all
19
those project tasks that increased in complexity are operating interdependently,
efficiently, and effectively to properly coordinate all tasks. Project managers increase the
amount of coordination in complex projects to decrease the level of confusion for all
activities taking place with the project. Also, by creating more effective coordination
strategies, project managers enable the project team and stakeholders to collaborate with
one another to reduce the risk of error and increase the likelihood of project success (Xia
et al., 2016).
Project managers coordinating amongst all teams to work toward a common goal
assist the project teams in accomplishing the tasks needed to complete the project. Poor
coordination among project teams can lead to poor communication of project
requirements, lack of communication throughout the different levels of stakeholders,
unnecessary increased expenditures, and defects in the project tasks (Doherty, 2011).
Project managers can avoid many of these pitfalls by implementing effective
coordination at the beginning of the project and ensuring there is an open line of
communication to all levels of the project. Coordination theory does have limitations,
however. Sanchez, Terlizzi, & de Moraes (2017) found that the cognitive aspects of
situations such as the different ways people think and communicate those thoughts are
not considered and thus may not be the most complete theory. Because I chose to focus
on all aspects of a successful project manager, coordination theory was the best choice to
focus on the entire process rather than only the cognitive processes that Sanchez et al.
(2017) studied. Project managers effectively managing the project team understand that
the cognitive process is an important part of coordinating activities, but it is not the only
20
process. By focusing too much time on an individual process, project managers may lose
sight of the goal and why they chose coordination theory.
Project stakeholders and project managers analyze the requirements and needs of
an organization to best address how a project is constructed. Contingency theory is the
idea that the best course of action to operate a business is contingent upon both internal
and external factors (Worren, 2017). Project managers and leaders of organizations use
contingency theory of management to create an organization based on what the
environments in which they are working require (Worren, 2017). Leaders in the
organization should not not limit their management to one management approach. Some
leaders adapt and change their management method based on the environment they are
working in and the demands of that environment (Longenecker & Pringle, 1978). I did
not choose to pursue research using the contingency theory of management because I
wanted to focus on how coordination happens in an environment that is largely constant
and does not change rapidly. I chose coordination theory over the contingency theory of
management so I could more easily research and study situations that were not in a
constant or near-constant state of change due to project needs. Project managers must
consider how the interdependence of systems in a project affects the stakeholders and
project team and must adjust accordingly (Santos & Baptista, 2016; VanVactor, 2015).
The final theory I considered using as a framework for this study was the theory
of constraints. Project managers use the theory of constraints as a guiding tool to manage
the day-to-day and long-term goals of an organization (Parker Dressel, Chevers, &
Zeppetella, 2018). I chose not to use the theory of constraints as the framework for my
21
study because the theory states that the single most limiting factor in project processes
must be identified and then improved upon (Killen, 2017). Rather than focus on only one
process improvement at a time, I preferred to research all strategies included in successful
projects. Additionally, in researching the strategies that project managers use to
successfully complete projects, there can still be process improvement on a broader scale
rather than focusing on only one issue at a time.
In selecting coordination theory as the framework of my study, I recognized the
entirety of the scope of my project and so limited myself to only one theory. Because
coordination is such an important aspect of all projects, focusing on this aspect of project
management allowed me to gain information from my research and interviews that I used
to advance the study of successful projects. I used the basic principles of coordination
theory to research and determine how project managers manage the expectations of the
stakeholders as well as the needs of the project team (see Momeni & Martinsuo, 2019).
Project managers can increase the likelihood of project success by developing
coordination strategies that assist both the stakeholders and project team and
communicate expectations and goals (Xia et al., 2016). With each successful project
implementation, project managers should record the processes and strategies that were
effective and use those strategies on future projects to increase the chance of project
success.
Systems Development Life Cycle
The SDLC was developed to improve the success of IT projects and to increase
efficiencies within those projects. Organizational leaders began to understand the
22
importance of refined and coordinated activities within an IT project because of the
increased capabilities of technology (Zou, Kiviniemi, & Jones, 2016). The
implementation of IT projects is a complex undertaking that requires both individual and
team coordination to successfully build a product as specified by requirements from
stakeholders. The SDLC is divided into five distinct phases: (a) system planning, (b)
system analysis, (c) system design, (d) system implementation, and (e) system
maintenance (Church et al., 2016). Project managers use the SDLC and associated phases
to monitor each task assigned to a project team member and to gauge the progress made
at each phase (Stingl & Geraldi, 2017). When used properly by project managers and
stakeholders, the SDLC is a powerful tool to increase the likelihood of success for any
given project. While each phase in the SDLC has specific tasks and timelines associated
with it, project managers can oversee multiple phases of a project at one time because
some tasks do not line up perfectly chronologically and must be completed before or after
another task.
System planning. The system planning phase is the time the project manager
uses to assess what the stakeholders require. The system planning phase is also the time
the project manager spends estimating timelines and resources required to complete the
project. The project managers and stakeholders set goals, define targets, establish
schedules, and estimate budgets for the new project during the system planning phase
(Sabri & Alfifi, 2017). Project managers use project planning documents and meeting
minutes to organize the system planning phase (Sabri & Alfifi, 2017). During the
planning phase, project managers explain to stakeholders the strategic value of the project
23
and the benefits incurred by the organization (Khaparde, Somani, & Malde, 2015).The
system planning process is integral to the system development life cycle as it is necessary
for it to occur before project managers and stakeholders can move on to the system
analysis as a lack of planning may result in incorrect goals and misunderstanding of the
project. Project managers plan as much of the system development life cycle as possible
and implement the timelines and guidelines proposed.
System analysis. After the project manager has planned the high-level view of
what the project will look like, an analysis is performed on the current system and how
the new system will interact with it. The system analysis phase also includes the
limitations, risks, and assumptions the project manager must analyze and understand
(Church et al., 2016). The project managers and stakeholders analyze all interacting
components of the project and also analyzes the operational procedures of the
organization (Sabri & Alfifi, 2017). Using a system interface and pseudocode are what
project managers do to organize the system analysis phase (Sabri & Alfifi, 2017). By
determining the needs and requirements stakeholders have for a project, project managers
can start the next phase of the system development life cycle (Church et al., 2016).
System design. The system design of any project is of the utmost importance to a
project manager and the project team. The system design phase is where the planning of
the system and analysis of the current and future systems combine to form a complete
picture of what the project team will work toward (Tilk, 2016). This phase includes
involving project managers, system architects, and business analysts to create a system
design that will not only enhance the current system but will work with all other systems.
24
The members of the project team define the architecture, components, modules,
interfaces, and data of the new system to address all requirement specifications (Sabri &
Alfifi, 2017). An application flow and data flow diagram are useful to project managers
when organization the system design phase as well as using system specifications so the
system is well-defined (Sabri & Alfifi, 2017). Also included in the system design phase
are the establishment of a code review process, the creation of testing requirements, and
the creation of a traceability matrix (Tilk, 2016). Project managers use these tools to align
the project resources and goals and to move into the implementation phase.
System implementation. The system implementation phase is the phase in which
much of the visible work is performed by the project team. Software developers spend
nearly all of their time implementing the system or solution that has been planned,
analyzed, and designed by other members of the team (Aljawarneh, Alawneh, & Jaradat,
2017). During the system implementation phase, the project team processes all data,
installs the new or updated product, trains users and stakeholders on the use of the new or
updated product, and provide any other support needed to complete the project (Sabri &
Alfifi, 2017). Project managers organize the system implementation phase by rolling out
actual program code and using a graphic user interface to display all the changes or
updates made to the product (Sabri & Alfifi, 2017). Architectural changes may take place
during the system implementation phase if conflicts arise when developers are creating
the product (Aljawarneh et al., 2017). When this occurs the project manager must gather
all necessary information to make an informed decision before completing the project and
moving into the maintenance phase.
25
System maintenance. The system maintenance phase occurs directly after the
system implementation phase but both can occur concurrently depending upon the
structure of the project. This phase is planned for by the project manager, organizational
leadership, and software engineers to ensure the outputs of a completed project continue
to function beyond the timeline of the project (Kumari & Srinivas, 2016). After system
implementation or during the implementation phase, members of the project create data
backups, install and manage malware components, install file system maintenance, and
perform any other general maintenance as needed by the requirements of the project and
the requirements set forth by the customer (Sabri & Alfifi, 2017). The project team
creates reports and change management documents to organize the system maintenance
phase (Sabri & Alfifi, 2017). These reports and change management documents are
especially important because they are included in organizational documents beyond the
project and those project team members tasked with maintaining the product after the
project has been completed can use those documents to understand what is needed and
how tasks can be accomplished best (Kumari & Srinivas, 2016). Without the
documentation of how the system works, the project manager would struggle to maintain
the product and the system maintenance phase would become much more involved.
Project Life Cycle
The four phases of the project life cycle are the initiating phase, the planning
phase, the executing phase, and the closing of the project. During these four phases,
changes occur within a project that are oftentimes unpredictable and must be managed by
a project manager (van Marrewijk et al., 2016). The sequencing of these changes and
26
phases to ultimately accomplish the goal of the project is the entirety of the project life
cycle (Saghir & Abdullahi, 2017). Different activities from each of these phases can
occur simultaneously but the phases themselves occur in a logical and meaningful order
to give a project a viable solution and timeline (Yalegama et al., 2016). The initiating
phase always comes first as this starts the project and leadership determines the direction
from that point.
Included in the project life cycle are the steps of gathering of requirements,
analysis of those requirements, designing an applicable solution to the project that is to be
solved, and finally implementing that solution once it has been developed and tested
(Rasnacis & Berzisa, 2017). The business requirements come from the business idea to
initiate the project and system, and technical specifications follow (Addas &
Pinsonneault, 2016). Leaders recognize the need for change by using informational cues
and focusing on the interdependencies among these cues to determine where processes
and practices can be improved or built upon (Zickert & Beck, 2012). When leadership
communicates these changes, project managers are then expected to follow through with
initiating the project life cycle to accomplish the goals set forth.
An important facet of the project life cycle is the activity of estimating of the time
and resources required to complete the requested changes and accomplish the goals
determined necessary by leadership. Before the development phase occurs, the project
manager and stakeholders plan the project to determine the necessary resources for
expedient and successful completion of the project (Korytkowski, 2019). The time
estimation of project managers is directly impacted by three factors: preparation,
27
production, and proving (Armour, 2013). The first factor, preparation, involves the setup
of infrastructure such as servers, tools, and applications as well as the sourcing of staff to
prepare for actual production (Armour, 2013). The second factor, production, occurs
when the work is being completed and development is performed by the development
team under the guidance of the project manager (Armour, 2013). The third factor,
proving, occurs when development has completed and testing as well as fixing is
performed by the development again under the guidance of the project manager (Armour,
2013).
Project managers and stakeholders have been using iterations of the project life
cycle for years. The project life cycle has evolved from a basic viewpoint of project
managers in the 1980s to now include the planning phase in all preparation (Badewi,
2016). Previously, the planning phase was not included until leadership recognized the
importance of stakeholder management on project success and so the planning phase was
included more frequently (Badewi, 2016). The additional tasks within the planning phase
for project managers and stakeholders include refining objects and goals and determining
risk and resource allocation (Almgren, 2014). Organizational leadership started adopting
the principles of the project life cycle with the understanding that projects with increased
amounts of structure are more likely to succeed than those projects without the structure
and guidance of a project manager in place (Badewi, 2016).
Initiating phase. The first phase of the project life cycle is the initiation phase.
The tasks included in this phase are the setup of the project including identification of
any issues that exist, solutions proposed to solve the issue, objectives to be achieved
28
during the course of the project, and conceptual aspects pertaining to how to complete
identified activities (Portillo-Tarragona, Scarpellini, Moneva, Valero-Gil, & Aranda-
Uson, 2018). Also included in the initiating phase are tasks that leadership to create the
definition of the project using a full investigation of possible solutions, the scope of work
to be completed as well as what is out of scope, risk analysis, and finances and other
resources available to start and complete the project (Portillo-Tarragona et al., 2018).
Organizational leaders must evaluate what needs to be accomplished and must also
ensure the project aligns correctly with the corporate strategy and vision (Joslin &
Müller, 2016).
The initiating phase is where the project starts and where organizational
leadership communicate clear goals. By definition, if there is no initiating phase then the
project has not officially started as this marks the beginning of any project (Krajcik,
2013). The ideas and goals set forth by organizational leadership are of paramount
importance; otherwise, no work can be accomplished. Organizational leaders determine
project scope as well (Kocherla, 2012). Stakeholders create a risk management plan and a
cost-benefit analysis (Kocherla, 2012). Also important to note is that there are many
activities that overlap not only for the initiating phase but for all phases because tasks
need to be completed in a timely manner and dependencies and interdependencies exist
among the phases (Portillo-Tarragona et al., 2018).
Many roles are involved in the project life cycle beyond the stakeholders and
organizational leadership. Those roles include product owners, project managers,
business analysts, system analysts, and quality assurance analysts (Kocherla, 2012). The
29
definition of roles by organizational leadership is important because confusion will be
avoided as to who is responsible for what task (Portillo-Tarragona et al., 2018). After
assembling the team, communicating objectives, and defining tasks, the final artifact is an
approved project charter to maintain consistency with the objectives of the project
(Yalegama et al., 2016).
Planning phase. The planning phase is the second phase of the project life cycle.
The tasks included in this phase are for leadership to refine the objectives and goals as
well as determine the risk for the project and resource allocation (Almgren, 2014). The
project manager and all stakeholders collaborate to determine the information
communicated to the project team to complete the project, discuss primary risks, define
what a successful project is considered, and allocate required resources (Saghir &
Abdullahi, 2017). The planning phase is especially important because this is the time
stakeholders and project managers come together to plan the entire project and put
together a logical plan to achieve the best results (Cleland, 2007). If leaders lay out
logical and efficient goals and tasks on how to accomplish those goals, the entire project
team benefits from leadership with a clear understanding of why the project exists.
During the planning phase, stakeholders and project managers must evaluate the
impact the project will have on an organization during the project and after the project
has completed. Employee practices and tasks, organizational processes, and customer
relations are affected by the decisions of leadership on why and how a project should be
completed (Kocherla, 2012). The stakeholders and project managers must determine what
the goals of the project are, how to achieve those goals, how to create a schedule and
30
timeline, and how to create an estimation of the need of resources such as time,
employees, and finances (Sabri & Alfifi, 2017). By establishing these guidelines for the
project during the planning phase, stakeholders can ensure tasks are done on time with
the resources that are needed available for use.
The planning phase of a project is integral not only for setting requirements for
the project but also because project managers and stakeholders can come together to
create avenues for communication and directly discuss expectations. Project managers
and stakeholders must consider the planning phase to be a primary part of the entire
project to be successful (Alsharo, Gregg, & Ramirez, 2017). All responsibilities must be
split among the stakeholders and project managers. Project managers are responsible for
most of the planning while stakeholders are responsible for looking ahead and understand
that expectations and requirements may alter in the future as the project evolves (Cleland,
2007). Even though project leadership cannot anticipate all possible changes and events,
all those involved in the planning phase must do their best to draw upon their experiences
and knowledge to anticipate as many of the challenges as possible that may arise during
the project to ensure success.
Another piece of the planning phase includes analysis of the risks associated with
the project as well as contingency planning in the instance that the original planning does
not accomplish all objectives or risks are encountered that need to be mitigated. A tool
developed to analyze and assess risk is named the risk matrix and this contains each of
the risks identified by stakeholders and project managers in the order of their impact and
the likelihood of them occurring (Ahamed, 2012). If the impact of a risk is low or the
31
likelihood of the risk occurring is low, project managers assign this risk a lower value
because it is unlikely to affect the project when compared with other risks. Project
managers and stakeholders perform this analysis during the planning phase (Project
Management Institute [PMI], 2017).
The last part of the planning phase involves project managers and stakeholders
creating detailed lists of necessary activities to achieve project success. These necessary
activities are then assigned by the project managers to the appropriate resources while
also estimating the duration of each of these activities (Ahamed, 2012). After the
estimation is completed, the resources must be scheduled to align properly with when
these tasks need to be completed as this allows project managers to successfully
communicate with both stakeholders and project team members (Ahamed, 2012).
Stakeholders and project managers assign the responsibilities and resource allocation
after reviewing processes and the requirements of the project (Karpovsky & Galliers,
2015). When analyzing requirements for the customer, stakeholders and project managers
must understand the requirements of the customer in the present as well as the
requirements of the customer after the project has been completed.
Executing phase. The executing phase primarily includes the tasks performed by
the project team to create a product as specified by the customer. The project manager
monitors costs to ensure the budget is followed as closely as possible. The project
manager performs this task by coordinating the actions and tasks of the project team and
communicating to project stakeholders regularly (Hak, Morandi, & Magenes, 2018).
Project managers start the executing phase after all tasks have been created, timelines are
32
communicated, project success is defined, and all necessary resources have either been
obtained or a plan is created to ensure the resources are available when needed (Windapo,
Oyewobi, & Zwane, 2014). By properly aligning resources and expectations before the
start of the executing phase, project managers can increase the likelihood of success and
allows them more time to focus on unexpected issues that may arise during the course of
the project.
The executing phase for a software project involves many actors including
software architects, project managers, project stakeholders, business analysts, software
developers and several others. Every actor in a project has a specific role to play during
the executing phase. The software architect and customer work closely together along
with the project manager to design a product that works best for the customer (Sabri &
Alfifi, 2017). The business analyst works with all team members to gather and interpret
business requirements while the software developer works on the implementation of the
project per the designs of the software architect (Sabri & Alfifi, 2017). When the project
team works together effectively and completes their tasks successfully, the likelihood of
on-time project success increases. The software architect will deliver a design for a
software developer to create while the business analyst gathers business requirements
before any designs have begun. The business analyst gathers requirements and works
with the team to deliver those business requirements in a more technical way to help
create technical documentation. The project manager must cultivate positive
communication practices to listen to what the customer needs and to translate those needs
into a product (Vasumanthy & Mohan, 2013).
33
During the executing phase, the project manager may need to change small or
large portions of the project to suit the needs of the customer. The project manager may
also be required to change the structure of the project due to internal or external factors
that are not in the control of the project team. These internal and external factors are most
commonly changes to time, resources, and team members (PMI, 2017). Even those teams
consisting of the most skilled project team members may encounter unanticipated delays
or issues (Vasumanthy & Mohan, 2013). When changes occur, the project manager must
communicate expectations and how the project team will stay on track to complete the
project in a timely manner.
Closing phase. The project manager initiates the closing phase of a project when
all tasks are completed or accepted as complete. As part of completion, the customer
reviews and accepts the project deliverables (Yalegama et al., 2016). This review and
acceptance of deliverables by the customer may take a significant amount of time
because the customer will ensure all components of the project work as specified
(Yalegama et al., 2016). A major component of most projects and a stipulated condition
of customers is the timeliness of a completed project as delivered by one organization to
another. Because project stakeholders and project managers are unable to correctly
anticipate every detail throughout the project, it is possible that the project may extend
beyond the original date of completion. Project stakeholders must intervene when it is
apparent that a project will not complete on time and work with both the project team and
the customer to determine the best path to success (Yalegama et al., 2016).
34
The impact of the project managers and stakeholders managing the closing phase
appropriately cannot be overstated. If the closing phase is correctly performed, the project
team conducting the project is likely to have a greater chance of success in delivering the
project to the customer more quickly than if the closing phase is not performed
appropriately or at all (Yalegama et al., 2016). A project manager can use the time spent
during the closing phase to schedule meetings with organizational leadership, other
project managers, the project teams, and with the customer to determine those actions
deemed most successful and those deemed unsuccessful (Kocherla, 2012). Although
every project is different, important lessons learned by the project teams can be
implemented in future projects to help increase the likelihood of success.
Monitoring and controlling. The project managers and stakeholders monitor and
control aspects of a project. Project managers perform monitoring and controlling
activities throughout the life of the project and beyond completion of the project (PMI,
2017). This aspect of the project is crucially important because all activities should be
monitored and controlled to ensure the best results. Without proper monitoring and
controlling of all tasks of a project, the project manager may lose track of where the
project is, what tasks are being completed by project team members, and may report
inaccurate updates to the project stakeholders. The project manager must manage the
time of all tasks including the overall timeline of the project, the cost of the project and
each individual component of the project, and the overall quality of the work to ensure it
meets the standards set forth by organizational leadership (Kocherla, 2012). Also
included in the responsibilities of the project manager is to communicate properly with
35
stakeholders and link all work together in a cohesive manner so as to efficiently complete
all tasks (Kocherla, 2012). During the course of the project, the project team may
encounter issues or changes to the project structure and it is the responsibility of the
project manager to continually update success factors and risk with the changes
(Kocherla, 2012). Simultaneously, while the project manager manages the responsibilities
of the project, they must also collaborate with organizational leadership to create
reporting structures to follow all facets of the project and also to monitor project
performance (Wysocki, 2014). Without the appropriate level of oversight and
management of a project by project managers, the risk for failure or extra costs increases.
Communication among all levels of the organization is key to ensuring
monitoring is performed successfully by project managers. Project managers can perform
this communication and monitoring using formal or informal methods. Both of these
methods are important to the project as both formal and informal strategies performed by
project managers are useful in different ways (Mao, Liu, Zhang, & Deng, 2016). Formal
control is defined as a rigid set of measures and rules with which project teams interact
and perform their tasks while informal control is directed by project managers at forming
a cohesive team and ensure that everyone on the project team can work together,
communicate in a logical and thoughtful manner, and perform their tasks and others
while working closely with the team (Mao et al., 2016; Marks, O’Connor, & Clarke,
2017). Even with the strictest of guidelines, however, a project manager cannot guarantee
success of the project because there are many other variables that need accounted for
outside of the full control of the project team.
36
Project managers must use control of the project as a tool to successfully manage
a project. However, the control a project manager has over a project is only one factor for
project success. Both project stakeholders and project managers should understand that
all employees perform differently and all need to be monitored and controlled in a
different way to work as efficiently as possible (Abbasianjahromi, Sepehri, & Abbasi,
2018). One of the keys to working correctly with all levels of an organization is gaining
an understanding of what each employee needs to succeed and it is then the job of the
project manager to research and implement strategies that complement the skills and
abilities of each employee (Abbasianjahromi et al., 2018). These levels of control include
basic performance management performed by the project manager and the stakeholders
to ensure everyone on the project team is correctly aligned and everyone is working
toward the same goal.
Project Management
Employee turnover and loss is a starting point to determine if the selection of
Agile or Waterfall methodologies contributes to turnover and loss. March and Simon
(1958) introduced the distal-proximal turnover framework to research why employees
leave a business. March and Simon observed employees leaving because the employees
felt they were contributing more than what they were receiving from the business.
Secondly, March and Simon observed that employees moved if they truly want to move
and if they can easily move. Lastly, March and Simon also observed that employees will
leave under certain conditions, but there are other conditions that were not taken into
37
consideration. However, the foundation built by this research allowed for researchers
later to expand upon the content (Venkatesh, Brown, & Sullivan, 2016).
Before a researcher begins analysis of employee turnover, the first task completed
is researching why turnover occurs. The research performed by March and Simon (1958)
is a start to analyzing why employee turnover occurs. Research, methods, and
communication have changed since 1958, but it is still important to note that the two
aspects of the turnover theory are still relevant today. Many more aspects were added to
the research performed by March and Simon, but their studies formed the foundation of
this research. The IT industry experiences a high turnover rate amongst younger
employees due to the availability of higher salaries at other organizations but largely
experiences similar turnover reasons as other industries (Guha & Chakrabarti, 2016).
Employee turnover is a result of several factors including my research of choice on the
selection of project management methodologies.
Researchers must take a step to analyze the risk of a project while also
researching ways to mitigate any issue that arises. Acevedo (2016) explored the strategies
used by IS and IT project managers to control and mitigate risk for their projects. This
study uses the coordination framework posed by Malone and Crowston (1990) explaining
how to coordinate tasks and how employees can work together to accomplish those tasks.
Acevedo (2016) observed that project managers receiving support from the leaders of the
business is the main factor for project success or failure. With the support leaders,
employees can move forward on the project knowing their work is useful and
appreciated. Because the research is limited to Puerto Rico, the results may not test the
38
same in other areas. A replication of the study performed by Acevedo in different areas is
needed to observe if the results are the same or different in other parts of the world.
By selecting a specific region to perform research, researchers narrow the focus of
the research thus allowing for more time spent on a specific subject. Acevedo’s (2016)
research is specific to Puerto Rico but is well-situated within the coordination framework
research performed by Malone and Crowston (1990). Acevedo observes the same results
and characteristics and focuses on support from management. The same research can be
done in other areas of the world and with other businesses to identify gaps in the current
literature. Many of these studies are likely to come to the same conclusion, but further
research needs performed to identify gaps and resolve issues that arise from those gaps.
Managing projects comes with risks the project manager must understand and
mitigate as needed. Project managers and project stakeholders have a general
understanding of project risk thus application of project risk management is an important
facet to the organizational project life cycle (Javani & Rwelamila, 2016). The loss of
resources such as time and money can result from incorrectly managed projects (Zhang &
Zuo, 2016). Anticipating a risk before it happens is the most effective way to remove that
risk. However, this is not always possible. When a risk is found, a straightforward
solution is the best choice, or the leaders can remove the cause of the potential risk
entirely thus avoiding the risk. There is a flaw in some of the reasoning that leaders can
simply eliminate the cause of the risk to remove the risk altogether. By eliminating a
cause, another risk may be created inadvertently, and the leaders may not know about this
new risk until much later in the project.
39
Identifying the cause of risks and acting upon them fits within the framework of
the study. Zhang and Zuo (2016) observed several ways to mitigate risk including finding
the causes of risks or addressing the risks in a straightforward manner. Conrow and
Shishido (1997) observed the inconsistent performance in software projects which let
them studying why this was occurring. Zhang and Zuo (2016) performs a logical analysis
of why projects fail using the framework Conrow and Shishido (1997) posed.
Researchers make use of tools to best analyze and mitigate risk in their projects.
Ahamed (2012) created a risk and probability matrix to help leaders analyze the risks that
can occur during a project. Shrivastava and Rathod (2017) created a similar framework to
assist IT leaders in mitigating risks in projects by ensuring communication among all
stakeholders is positive and all gaps are addressed. The goal of creating this matrix and
framework was to develop solutions and contingency plans to mitigate the risks. While it
is not possible to determine all risks at the beginning of the project, the exercise is a
useful one. Project managers identify many risks thus allowing leaders to prepare plans.
Researchers and organizational leaders should use the tools available to them to
best address any project situation that may arise. Leaders have tools and research at their
disposal to analyze and mitigate risk (Ahamed, 2012; Shrivastava & Rathod, 2017). This
research follows research that reveals the necessity for risk mitigation before a risk exists.
Project managers preparing for potential or future risks are better prepared for risk
situations that may arise (Shishodia, Dixit, & Verma, 2018). By anticipating what may
happen, project managers can create an accurate project plan to save time, money, and
40
other resources. The next step in the process may be to create a scoring system that
suggests the next actions depending upon the risk the project contains.
To best research or complete a project, project managers must perform an analysis
on the type of methodology that best fits the project. Rasnacis and Berzisa (2017)
examined how to select a methodology using their decision tool and support. A similar
approach the researchers noted is the analytic hierarchy process by Saaty (2008). The
decision model and tool developed by Rasnacis and Berzisa (2017) have been used in
practical situations and assists leaders in making the correct decision based on available
information. Of importance is that the decision model should not replace an expert in the
field. Leaders must use the model and tool to assist in the decision-making process but
not as the sole determination method.
Many tools and decision models share similarities with other tools and decision
models. The tool and decision model created by Rasnacis and Berzisa (2017) is similar to
the analytic hierarchy process created by Saaty (2008). These two hierarchies and
processes work together to answer questions the other model cannot. The next step for
the decision model is to focus on the rules and characteristics of the model (Rasnacis &
Berzisa, 2017). When the decision model and tool are updated, the usefulness of both will
increase thus allowing more professionals the opportunity to use both.
Voluntary training in IT is an important aspect of professional growth. This
training adds to the success rate of projects (Mamonov & Koufaris, 2018) as long as the
training is conducted in a useful and logical manner. The importance of training and
education for project managers is emphasized by the research performed by Geithner and
41
Menzel (2016) when they studied the failure rate of projects compared to the amount of
training and education received. A correlation exists between failed projects and little to
no training and education in project management techniques. However, there is no
guarantee that training and education in project management techniques will
automatically cause success in projects. Other factors not addressed by Geithner and
Menzel (2016) such as time constraints and monetary resources should be taken into
consideration to provide a fuller view of how and why projects fail.
Project managers have numerous choices of how to increase their skills and
knowledge. However, there is little evidence that traditional project managers with
certifications are more capable in the project manager role than those who have no formal
training (Marzagão & Carvalho, 2016; Papke-Shields & Boyer-Wright, 2017). This
evidence shows the need for more progressing and updated training. Many project
managers learn by having a large quantity of information thrown at them with some of
that information sticking with them (Chen et al., 2019). Geithner and Menzel (2016)
build upon these ideas and data by addressing the updated training and education
concern.
Transition
In Section 1, I presented my topic and created the foundation of the study while
focusing on the background, business problem, research question, conceptual framework,
research method, and interview questions. Included is the significance of the study
showing the positive impact this research will have on both business and the topic of
project management. In the literature review, I explored the topics of project
42
management, project lifecycle, systems and software development lifecycle, and
technological communication tools and I discovered information on the application of
project management today.
In Section 2, I focused on the design of the study and the methodology of the
study. Section 2 also includes the use of qualitative research to analyze the key strategies
for IT projects. I described the method of ethical qualitative research, the data collection
and organization techniques, and the data collection instruments I used. Data analysis,
and reliability and validity of the findings are also included in Section 2. Finally, Section
2 includes discussion of the role of the researcher, participants, and population selected
for the study while also restating the purpose statement. I concluded Section 2 with a
transition and summary section.
In Section 3, I restated the purpose statement and the research question as well as
included the findings from my research. I then discussed the application for professional
practice that my research addresses. I included the implications for social change,
recommendations for action, and recommendations for further research based upon my
findings. To finish, I included a reflection section as well as a conclusion.
43
Section 2: The Project
IT project managers add value to organizations when successfully leading projects
to completion. However, project success rates remain low despite efforts to increase the
rate of success (Qin et al., 2017). In Section 2, I explain in detail (a) the role of the
researcher, (b) participants, (c) research methodology and design, (d) population and
sampling method, (e) ethical research, (f) data collection instruments, (g) data collection
techniques, (h) data organization techniques, and (i) reliability and validity.
Purpose Statement
The purpose of this qualitative multiple case study was to explore the strategies
project managers in the IT sector use for delivering successful IT projects. The targeted
population consisted of six IT project managers from three businesses in Northeast Ohio
who had developed and implemented strategies for delivering successful IT projects. The
implications for social change included the potential for business owners to learn how
strategies could be used to successfully complete IT projects, thereby allowing owners to
increase and conserve financial resources to create more jobs or pay higher wages to
current employees. New employees and employees who earn more may spend more
money within their communities, contributing to local economic growth.
Role of the Researcher
The researcher plays a vital role in conducting the study in qualitative research.
Hamersly (2015) noted that the researcher designs the study while also gaining approval
from the institutional review board prior to data collection. To best gather information
from participants, researchers must establish a trusting relationship with them (Sanabria,
44
2014) while simultaneously collecting, organizing, and analyzing the data (Hooper,
2013). The data collection process involves the researcher performing interviews,
observation, and analysis of archives and documents (Petrova, Dewing, & Camilleri,
2016; Yin, 2017). I followed the appropriate form and protocol while conducting each
interview to gather information in a relevant and consistent manner. To obtain the
relevant and consistent information I asked questions that required an in-depth
explanation, I recorded all interviews in audio form, I typed notes as the interview
occurred, and I prepared all data gathered to allow for a follow-up interview to clarify
answers or gain new information.
My career has been focused on IT project management and I have worked in
conjunction with other IT project managers as well as others involved in implementation
of the projects. Successful project implementation and the strategies used by project
managers are of unique importance because of the direct impact to business operations.
By maintaining the business and personal relationships with project managers, I selected
several previous colleagues for this study. To ensure I met ethical standards, I followed
the ethical guidelines and principles in The Belmont Report (National Commission for the
Protection of Human Subjects in Biomedical and Behavioral Research, 1979).
The Belmont Report identified three ethical principles for the conduct of
interviews: (a) respect of persons, (b) beneficence, and (c) justice (National Commission
for the Protection of Human Subjects in Biomedical and Behavioral Research, 1979). By
adhering to these three ethical principles, I treated each participant with respect and
integrity. Before beginning the questioning process, I ensured the interviewee understood
45
there is no compensation or incentives offered for their time and participation in the
study.
To reduce bias, I used bracketing and member checking. Researchers use
bracketing to reduce and mitigate bias in interviews (Chen & Han, 2016). All researchers
potentially affect information gathering during direct interaction with the interviewees by
injecting their personal bias whether it is intentional or unintentional (Kalu & Bwalya,
2017). Through note taking during interviews, bias was mitigated through bracketing. I
also used member checking as this increases the accuracy of the data collected by
following up with interviewees to ensure the correct information has been collected for
analysis (Wilson, Velera et al., 2016). After each interview, I asked the participant to
review the summary of findings and either make corrections to the summary, add more
information, or correct the incorrect information in the summary (see Wilson, Valera et
al., 2016).
I used an interview protocol and semistructured interviews to gather data from
participants through the use of open-ended questions created before the interviews. I
asked each participant the same questions as the other participants. The participants also
read through a standardized script at the beginning of the interview before the questions
and at the end of the interview after all questions had been answered (see Castillo-
Montoya, 2016). To minimize potential biases or personal influences by shifting to
another attitude, I used bracketing (Englander, 2016). By taking notes during the
interviews and during analysis, I minimized bias and personal influences. I created the
transcripts of the interviews and asked the participants to review the transcripts to ensure
46
all answers provided had been transcribed correctly (see Birt, Scott, Cavers, Campbell, &
Walter, 2016).
Participants
The selected participants for the study possessed a predetermined amount of
experience and could answer the interview questions posed. The experience requirement
for the participants was a minimum of 5 years of managing IT projects. Eligible study
participants were individuals who could answer the interview questions knowledgeably
and logically (Khodyakov et al., 2017). Participants are typically chosen for qualitative
research because of the knowledge those participants possess about a specific topic and
the goals to be achieved by the qualitative researcher (Yin, 2017). I selected six
participants who (a) were current IT project managers in the Northeast Ohio area, (b)
were knowledgeable about the topic of the study, and (c) met the eligibility requirements.
To gain access to these six participants, I used professional relationships for some
project managers and referrals from other project managers to interview those with whom
I did not have a professional relationship. I created a pool of more than six potential
participants so if one or more of the original participants was unable to interview, I could
maintain my plan of six participants. Purposive sampling or selecting the best candidates
for the research first that are the most knowledgeable (Merriam, 2014), is the sampling
method that I used for the pool of candidates.
To build a working relationship with each participant, I gained an understanding
of their project management experience and their overall work experience. By using face-
to-face meetings, phone calls, and e-mails, I developed a professional relationship with
47
each participant before completing the interviews to ensure I had the correct participants.
I also communicated via writing and verbal communication the reason for the research as
well as the boundaries for those interviewed. Disclosing relevant information is how
qualitative researchers gain trust with each participant (Evans, 2018).
After gaining Institutional Review Board (IRB) approval to conduct my study, I
called and sent e-mails to each candidate to discuss participation in the study, including
the purpose of the study, how the study and results would be kept private, and how both
the community and business leaders can potentially benefit from the results of the study.
An informed consent form was included in the e-mail, and I asked the participants to sign
this form and return it to me if they wish to participate in the study or decline and return
the form to me if they did not wish to participate in the study. After gaining participant
acceptance and approval to participate in the study, I contacted each willing participant
by phone to discuss an interview date and time that best suited their schedule.
Building a trusting relationship by discussing with participants all information
important to the study is essential for qualitative researchers (Evans, 2018). I discussed
with each participant the objectives and goals of the study, the interview protocol, and
how each participant received a unique code to protect confidentiality. I asked questions
the participants had to offer clarity on all parts of the study. After discussing with the
participants what would happen during the interview, I asked them to complete an
informed consent form to ensure I conformed to expected and published ethical
standards. There is an expectation of qualitative researchers to develop a level of trust
48
with the participants of the study and the use of consent forms demonstrates that level of
trust (Evans, 2018; Kokolakis, 2017).
Research Method and Design
I used a qualitative research methodology and a multiple case study design for the
study. Researchers use qualitative methodology to gather data in a flexible manner while
developing a rich understanding of the specific research topic (Caputo, Veltri, &
Venturelli, 2017). Researchers use case study design to gather data from participants who
experience the phenomenon directly (Fletcher, de Massis, & Nordqvist, 2016).
Research Method
I used a qualitative research methodology for the study. By using qualitative
research methodology, the researcher implements a process to acquire knowledge about a
subject (Mohajan, 2018). Qualitative researchers identify themes and patterns to gain a
greater understanding of the phenomena they are studying (Petrova et al., 2016). The
complexity of the technical phenomena in the IT field is a good fit for a qualitative
research methodology but not for quantitative research (Chughtai & Myers, 2017). The
use of qualitative research does not place limits on researchers by assuming a specific
outcome and allows the researcher to gain insight into the phenomena (Caputo et al.,
2017). Using qualitative methodology enabled me to explore participants’ insights and
ideas regarding strategies they have used and to develop themes and patterns to explore.
The qualitative approach was a more complete and appropriate method to use for my
study than a quantitative methodology or a mixed methods.
49
Qualitative research is exploratory while quantitative methodology involves
statistical research and procedures. Quantitative researchers examine a hypothesis by
using measurements to (a) test theory, (b) evaluate statistical significance, and (c)
establish relationships (Paskaleva et al., 2017). Quantitative researchers use statistical
procedures and models to conduct tests on relationships through the use of numerical data
and variables (Park & Park, 2016). The purpose of this study was to research and explore
the strategies of the participants by using open-ended interview questions and so a
quantitative methodology was not appropriate.
The mixed methods approach is a combination of both qualitative and quantitative
research. Researchers use mixed methods when neither the qualitative nor the
quantitative methodology are sufficient to explain a phenomenon independently
(McDonald et al., 2019). The purpose of this study was to explore the strategies project
managers use to successfully implement projects. The use of statistical analysis and
hypothesis testing was not appropriate, so I did not select the mixed methods approach
for the study.
Research Design
I used a multiple case study research design to conduct this study. A multiple case
study design is used to research a holistic and real-world perspective of the phenomenon
(Yin, 2017). In qualitative research, a case study does not have clear boundaries between
the phenomenon and the environment thus researchers can more freely explore and
investigate the phenomenon (Ji et al., 2019; Yin, 2017). By using a case study design,
researchers gain a greater understanding of a phenomena allowing them to create further
50
research opportunities (Runfola, Perna, Baraldi, & Gregori, 2017). A researcher can use a
multiple case study to investigate research questions that require an in-depth
understanding through the use of interviews and research (Hitch, 2016). The case study
research design was most appropriate for my research and enabled me to answer my
research question and gain a greater understanding of the strategies project managers use
to successfully implement IT projects. Also considered was the use of either an
ethnographic or phenomenological research design for this study.
An ethnographic research design was not appropriate for this study. Researchers
using an ethnographic research design are heavily involved in fieldwork studying the
cultures of people during their normal day-to-day lives (Caffaro et al., 2018; Caliandro,
2018; Moustakas, 1994). Researchers gain an understanding of the culture of a group of
people by connecting the patterns in experiences and behavior in an ethnographic
research design (Birken et al., 2015). Because I was not exploring or investigating the
behavioral patterns of a culture or group of people, an ethnographic research design was
not appropriate for this study.
A phenomenological research design was also not appropriate for this study.
Researchers use phenomenological research designs to investigate the lived experiences
of people or a group of people for a phenomenon (Finlay, Peacock, & Elander, 2018).
Researchers explore a phenomenon experienced by an individual or a group of people
(Conklin, 2014). Starting by researching a phenomenon, researchers then analyze how or
why an event occurred and conclude with reviewing the individuals who have
51
experienced the phenomenon (Sanders, 1982). Because I was not exploring the lived
experiences of a phenomenon, a phenomenological research design was not appropriate.
To ensure complete and quality data collection results, I checked data saturation
while performing the research and collecting data. A high degree of data saturation, or
when little to no new information is discovered, is how qualitative researchers best ensure
the high quality of data collected (Hyett, Kenny, & Dickson-Swift, 2014). Researchers
also use data saturation as a rule for achieving the correct sample size in a qualitative
research design (Boddy, 2016). In addition to selecting the appropriate sample size, I
used member checking, I scheduled follow-up interviews, and I used data triangulation to
further reach data saturation with my research. By using member checking and follow-up
interviews, data saturation was achieved because the participants had an opportunity to
provide feedback or validation on research questions (Marshall & Rossman, 2016). By
using data triangulation, researchers provide another method to achieve data saturation by
using more than one source or method to collect data on the same topic (Fusch & Ness,
2015). Using the determination of the correct sample size, member checking, follow-up
interviews, and data triangulation, data saturation in the research was ensured.
Population and Sampling
The target population for the study included IT project managers who had
managed or were currently managing IT projects in the Northeast Ohio area. The target
population consisted of six IT project managers who had managed or were currently
managing IT projects in the Northeast Ohio area. Study participants were (a)
knowledgeable in the area of research, (b) capable of answering the research questions
52
posed, and (c) familiar with the particular phenomenon researched (Leedy & Ormrod,
2013; Merriam, 2014; Yin, 2017). The target population consisted of IT project managers
with a minimum of one year of experience managing IT projects and had completed at
least one IT project on time and on budget. Based on these requirements, the target
population for the study was knowledgeable in the subject area, capable of answering the
research questions, and were familiar with the phenomenon I was studying.
I used subjective sampling to select the appropriate participants and to gain access
to the participants. Subjective sampling, also known as purposive sampling, is used by
qualitative researchers to generalize information (Saunders et al., 2015). Qualitative
researchers select participants based on their knowledge of the research topic (Merriam,
2014). Voluntary participants from IT managers who have successfully managed projects
and have proven success in the IT field will be selected. Because one of the requirements
for selecting participants is success with IT project management, I used subjective
sampling to ensure the participants had relevant experience to the research topic
(Mittelstadt, Allo, Taddeo, Wachter, & Floridi, 2016).
Typical sample sizes for qualitative studies are between five and 50 samples
whereas quantitative studies require more samples depending upon the details and goals
of the study (Boddy, 2016). The sample size of qualitative research is determined by data
saturation (Boddy, 2016) while also being impacted by the unique requirements and
constraints of the topic (Varpio. Ajjawi, Monrouxe, O’Brien, & Rees, 2017). To
determine when data saturation occurs, gathering data will continue until no new themes
or patterns revealed during the information gathering process (Murgatroyd, Lockwood,
53
Garth, & Cameron, 2015; Nelson, 2017). Through the use of member checking, follow-
up interviews, and triangulation of collected data I worked toward data saturation. I
achieved data saturation through member checking and follow-up interviews and
collected additional data from the interviewees and used these methods to discover more
information than was initially shared by participants (Marshall & Rossman, 2016).
Another method to confirm data saturation to be used is data triangulation through cross
verification (Fusch & Ness, 2015).
Ethical Research
I obtained permission from the participants before collecting information from
them. Obtaining approval from the institutional review board was sought and achieved
and an e-mail to all prospective participants with the informed consent form was sent. In
the informed consent form, guidelines for participation in the study and the process were
included to ensure their confidentiality. The guidelines included information on (a)
details of the study, (b) procedures for conducting the study, (c) steps for removal from
the study, (d) benefits that may exist from the findings, and (e) my contact information
including my e-mail address and my telephone number. A requirement that all
researchers must adhere to is providing oversight procedures of the study and how
identities are protected for the participation in the study (Wilson et al., 2018). All
prospective participants were required to reply to the e-mail sent them with the words “I
consent to this study.” If there was no response or the prospective participants responded
that they were not interested, I removed them from consideration from the study. I
offered the opportunity to withdraw from the study if the participant initially chose to
54
participate in the study but changed their mind at any point during the study. For this
study, the Walden IRB approval number was 12-24-19-0676441.
All participants had the opportunity to withdraw from the study at any time for
any reason. Per Holmes, Blackwell, Heyes, Renner, & Raes (2016), I informed all
participants of their opportunity to withdraw and how the withdrawal process occurs. The
participants were required to inform me of their decision to withdraw and their
participation was removed from the study. Because there was no compensation or
benefits received for participant in the study, the participants who requested withdrawal
did not incur a penalty. If a participant chose to withdrawal from the study at any time, I
removed the data collected from that participant from the study.
All data collected remained confidential for the duration of the study as well as
after the study has concluded. The confidentiality of participants is of the utmost
importance when qualitative researchers conduct a study using the concepts of
confidentiality (Lancaster, Seear, Treloar, & Ritter, 2017). To guarantee confidentiality,
each participant was assigned a randomly-generated number. All data collected is
securely stored for five years to protect the confidentiality of the participants for the five-
year span.
Data Collection Instruments
I was the primary data collection instrument for the study. The researcher acts as
the primary instrument for qualitative studies and is active in collecting data from
interviews and other sources of information (Bengtsson, 2016; Lazard & McAvoy, 2020;
Vidgen, Shaw, & Grant, 2017). semistructured interviews were used to collect the data
55
necessary for this study. To obtain this data through the use of semistructured interviews,
I asked six semistructured questions along with probing questions based on the responses
of the participants during the interview (Appendix). Researchers gain a comprehensive
data collection for their research through the use of semistructured interview questions
(King et al., 2019).
I used several methods to contact the participants including in-person interviews,
e-mail, or telephone calls. IT project managers were contacted that I know personally as
well as those referred to me by professional colleagues. The interview process included
communication with each participant to ensure all questions from the participant were
answered and availability for the interview was confirmed, the interview was scheduled,
and the consent form was given to the participant. The interview was conducted in a
setting the participants chose and was comfortable with. I informed the participant that
this location must be outside their place of employment to allow for more interaction and
less distractions that might occur in their place of work (Oltmann, 2016).
I followed the interview protocol as provided in the Appendix. The credibility of
research is improved with the use of an interview protocol (Yin, 2017). The first step of
the process before interviews begin was to ensure each participant received and
understood the informed consent form. If the participant had any questions about the
informed consent form, I answered any questions at that time. Face-to-face interviews
were used as the primary method of data collection for the study. I scheduled each
interview for one hour to allow for sufficient time to appropriately include all steps in the
interview and data gathering process. For all semistructured interviews, I listed the
56
interview questions listed in the Appendix. These interview questions are directly related
to the research question concerning the strategies that IT project managers use to deliver
successful IT projects. Follow-up questions during a semistructured interview is
important to a researcher because this can lead to additional information that is more in-
depth and detailed (Roulston & Shelton, 2015).
I used an audio recorder, a journal, and a pen to ensure accurately collected data
during the interviews. I used a journal to supplement the audio recordings to note body
language of each participant. Immediately following each interview, I recorded my
thoughts on the participant and interview in the journal to mitigate potential personal
biases and issues. Bracketing is an effective way for researchers to manage potential
biases and issues and this is accomplished by using a journal and writing notes in the
journal during interviews and other data gathering sessions (Chen & Han, 2016). By
using a journal and pen in addition to an audio recorder, the recordings were as accurate
as possible.
I asked each participant to provide any documentation used by their organization
in the management of IT projects. These documents were valuable to my research of how
IT projects are successfully delivered. The information contained within these documents
were used to analyze if such documentation was useful or necessary with regards to the
overarching research question. The credibility of all findings is enhanced when the
researcher includes multiple sources of evidence to the reader (Yin, 2017) thus enhancing
the credibility of my research. I also used member checking to increase the reliability and
validity of all data collection instruments. After all documents had been gathered, I
57
compared my analysis of the documents to the interviews to add context to each
interview.
I used member checking with all participants to increase the accuracy of data,
decrease incorrect data, and to increase the reliability and validity of the study. Each
participant received the data and my interpretation of the data and this is referred to as
member checking (Birt et al., 2016). After gathering all data from each participant, the
findings were reviewed. To increase the reliability and validity of the findings of a study,
researchers use member checking after gathering data (Jensen, Agersted, Nielsen, 2020).
Through the application and use of member checking, reliability and validity was
increased to ensure there was as little error as possible.
Data Collection Technique
I used one primary data source and two secondary data sources. The primary data
source was the use of semistructured interviews. The secondary data sources were field
journal notes and organizational documents. For the semistructured interviews, I used
face-to-face interviewing and telephone calls as the primary methods to collect data. To
collect information for their research, qualitative researchers use interviews, document
analysis, and direct observations (Arseven, 2014; Norlyk, Haahr, & Hall, 2016). I used
semistructured interviews to gain an in-depth and intimate knowledge directly
corresponding to my research.
I obtained IRB approval before any contact with participants occurred to ensure I
adhered to all regulations. I used the interview protocol in the Appendix to conduct the
semistructured interviews. The interview protocol is an important component of research
58
because it helps to build a foundation of the format of an interview and directs how an
interview operates (Yin, 2017). After IRB approval was obtained, I contacted each
potential participant by e-mail or telephone. After initial contact had occurred, an e-mail
to each participant containing the informed consent form was sent to instruct each
participant to respond with I consent in an e-mail reply to me to participate in the study.
Upon reception of the consent forms from participants who desired to participate, all
consent forms were gathered and securely stored. All participants consenting to the study
were contacted to schedule a date, time, and location for the interview and also
tentatively schedule a secondary date, time, and location if the original date, time, and
location if the interview did not occur. I allowed the participants to choose the date, time,
and location of the interview to ensure the participants were as comfortable as possible
but requested that the location was not their current place of employment. By allowing
the participant to choose the date, time, and location of the interview, researchers
empower the participant to help build a level of trust and comfort that may not already
exist (Dempsey, Dowling, Larkin, & Murphy, 2016; Novakovich, Miah, & Shaw, 2017).
To ensure open communication with all participants, I confirmed the interview
appointment one week before the chosen date and then confirmed the interview
appointment one day before the chosen date. The time and location were confirmed to
ensure the participant and I were fully aware of the scheduled interview.
I conducted each interview using the following standardized process:
1. Introduce myself to the participant to develop a rapport and connect,
59
2. Explain the topic of the research and the reason for the interview with the
participant,
3. Retrieve the informed consent form for the participant and explain the form in
detail,
4. Explain to the participant how their confidentiality will be kept,
5. Ask the participant for permission to record the interview,
6. Explain to the participant that they have the ability to stop the interview at any
point during the interview with no consequences,
7. Explain to the participant the importance of answering each question as
truthfully and fully as possible to the best of their ability,
8. Conduct the interview after the entire process has been explained, and
9. Thank the participant for their participation in the study and the time they
spent assisting me in my data gathering.
At the completion of each interview, all details deemed important were recorded
in the journal. Details that were recorded for each participant included the name of the
participant, date of the interview, time of the interview, location of the interview, and any
observations made during the interview. The use of a journal to record general responses
and thoughts on the interview improves the trustworthiness of the study (Corsaro, 2019).
To minimize potential biases, qualitative researchers create written notes during
interviews in a journal (Chen & Han, 2016). Through the use of a journal, confirmability
of the data collected during the interviews was enhanced in addition to the secondary data
gathered from all organizational documents provided by the participants. Additional
60
experiences may be found to explore during a later study by using a journal to record
notes (Kogan & Schoenfeld-Tacher, 2018).
I used semistructured interviews because there are numerous advantages to do so
in the type of data gathering planned. My research topic was most easily studied through
the use of semistructured interviews. Using semistructured interviews, researchers design
the interview questions to address the specific topic (Yin, 2017). My intention was to
specifically hone in on answering my research question through the use of semistructured
interviews. Additionally, the use of semistructured interviews allows participants the
ability to offer their own views and opinions to the study adding depth and context to the
research (Wehner, Ritter, & Leist, 2017). During the interview process, participants were
allowed to offer additional ideas and opinions outside of what they consider to be facts to
gather information outside the specific interview questions. The collection of this
additional data through semistructured interviews provides researchers with new
information that can be gathered and analyzed to explore different ideas (Karadzhov,
Yuan, & Bond, 2019). However, it is important to focus on the information most relevant
to the study while recording any additional information for future use. Qualitative
researchers must be aware that while there are numerous advantages of using
semistructured interviews, there are also disadvantages.
There are several disadvantages of using semistructured interviews that
researchers must understand. Those disadvantages include a (a) mistake in the analysis of
the data collected, (b) incorrect recall of information by participants, (c) a
misrepresentation of information from the participant due to a desire to satisfy the
61
interviewer, or (d) the possible selective representation of data and misleading the
researcher (Oltmann, 2016; Wilson, Onwuegbuzie, & Manning, 2016). Researchers
benefit from paying strict attention to the interview to control the direction of the
conversation as needed and to ensure the participant does not digress (Yin, 2017). By
paying attention to the interview and to the participant, the researcher builds trust with
the participant and maximizes comfort of the participant and the reliability and validity of
the information collected during the interview (Oltmann, 2016; Yin, 2017).
The advantages of a researcher using a journal during semistructured interviews
include assisting researchers in gathering a greater depth of data than would otherwise
occur (Kogan & Schoenfeld-Tacher, 2018) and improving the understanding of both
nonverbal and verbal cues of the participants (Gray & Jones, 2016). The researcher
benefits from adding written notes to the audio recording because the audio recording
does not capture nonverbal communication and cues. If the researcher does not properly
interpret nonverbal communication and cues, it is possible that the researcher will
incorrectly record a written note and this is a disadvantage of the use of a journal during
and after a semistructured interview (Saunders & Townsend, 2016).
Organizational documents were collected as provided by the participants after
receiving their written confirmation of participation in the study. I asked each participant
to provide documentation through e-mail or printed forms they were able to provide from
their organization that is of use in IT project management. Primary data collected was
supported through the analysis of secondary data such as documentation and effectively
supports research (Arseven, 2014; Norlyk et al., 2016; Yin, 2017). I used these
62
organizational documents to support all primary data collected by checking consistency
and added context and depth to the data gathered. The information found within the
secondary data sources contained additional ideas and concepts that were not uncovered
during the interviews.
Gathering the organizational documents from the participants has both advantages
and disadvantages. By using document review of documentation directly from an
organization with a record of successful project implementation, the researcher increases
reliability and validity of the data gathered (Gresham & Burleigh, 2019; Yin, 2017).
Document review can be used to corroborate evidence reliably (Evans, 2018).
Researchers must be vigilant in obtaining documents that are accurate and complete. A
disadvantage of using document review is that it is possible the documents gathered from
the participants are outdated, incomplete, inaccurate, or biased in one form or another
(Yin, 2017). The researcher should always check all documentation received to ensure
the information on the documents is as accurate as possible. To help improve the
accuracy of the data gathered, member checking was used with the participants.
Member checking was used to increase the quality, reliability, and validity of the
collected data from the semistructured interviews. By providing the participants with a
summary of the interpretations to their responses after the semistructured interviews, a
researcher uses the member checking process by allowing the participants to verify the
accuracy of the summary and information gathered during the interviews (Wilson,
Onwuegbuzie & Manning, 2016). After all interviews were completed and the data was
analyzed, all participants were provided with a report of the findings of the interviews
63
and my interpretation of their responses. Each participant received only their responses
and my interpretation of their responses and did not receive my interpretation of any
other participant’s responses. I then discussed with each participant whether my summary
of their responses was accurate or if I needed to take corrective action. I also asked for
each participant to add any other information they felt was useful for the study. By using
member checking, qualitative researchers enhance the reliability and validity of collected
data during interviews and other data gathering sessions (Birt et al., 2016; Yin, 2017).
Data Organization Technique
Both a hard copy filing system and an electronic filing system was created to store
all data gathered and both of these systems are secure. I created both of these systems
prior to the collection and analysis of data as this is an important task before the data
collection and data analysis tasks (Duffy et al., 2017). Per Castleberry (2014) and Ose
(2016) the use of NVivo 12 is an effective software application to store data gathered
from research securely as well as performing the management and analysis functions of
data. NVivo 12 was used to manage and analyze data and Microsoft Word was used as
the tool to transcribe the interviews. Microsoft Excel was used as needed for other data
requirements that required a spreadsheet format. All data gathered was organized into
categories using both the hard copy and electronic format for easy retrieval. The hard
copies of data was stored in an electronically locked safe to which only I have the
security code while the electronic data is stored in an online database that requires two-
factor authentication to access to ensure only I have access to the data as needed. The
confidentiality of all participants is of the utmost importance and restricting access to the
64
data ensures proper care is taken to maintain that confidentiality (Evans, 2018). I
transferred all hard copy documentation to the secure database to maintain both a primary
and backup of all data gathered.
I gathered, organized, and securely stored all data collected during interviews in
both electronic and hard copy format. Immediately following each interview, I
transcribed the recording. By transcribing the recording immediately following the
interview, researchers are less likely to make an error in the transcription and
interpretation of the data gathered (Yin, 2017). After transcribing the interviews, the data
was transferred to NVivo 12 for analysis at a later point in time. NVivo is an appropriate
and effective software application to manage data organization and assist in analysis
(Ose, 2016). I organized and placed all data gathered into the categories defined before
the data gathering process and interviews. By creating categories and using those
categories, qualitative researchers more easily summarize the data gathered by creating
more manageable data units (Bevort & Suddaby, 2016). Because the summary and
analysis of data is more easily completed by focusing on specific categories, I did not
attempt to summarize and analyze all the data at one time. The identity of all participants
and the organizations was replaced with pseudonyms to ensure confidentiality and
privacy during the data organization process.
A field journal was used to supplement the interview data and documentation
provided by participants. Qualitative researchers use a field journal to gain a deeper
understanding of qualitative data and to explore additional research opportunities at a
later time (Kogan & Schoenfeld-Tacher, 2018). Qualitative researchers may also discover
65
additional themes that were not discovered initially through the use of a field journal
(Shek, Wu, & Chai, 2017). By using a field journal, qualitative researchers may capture
nonverbal communication and responses from the participant, and this may assist the
researcher in understand the interview data in a deeper manner (Wilson, Onwuegbuzie &
Manning, 2016). I included my field journal notes in the organization of data task to
ensure correct categorization, summarization, and analysis.
After I collected the research information, I updated the data organization and
analysis techniques to ensure the most effective methods were used. Research results may
be enhanced by updating and changing their data organization and analysis techniques
throughout the research process (Vernon-Dotson, 2013). During the data collection and
organization, additional categories and themes were uncovered that had no definition
prior to the data collection process. Marshall and Rossman (2016) noted that qualitative
researchers enhance their data analysis by creating groups and categories with which data
can be organized into. By reviewing all data gathered, qualitative researchers may create
a high quality and accurate study (Yin, 2017). Because of the need for confidentiality and
a need to maintain a copy of all data gathered, all data is stored securely for a period of
five years.
The confidentiality and privacy of all participants is protected for a period of five
years by restricting access to all research data including names and the organizations with
which each person is associated with. All researchers that take action to restrict data
gathered ensure the data is securely stored (Evans, 2018; Thorpe et al., 2018; Wilson et
al., 2018). All hard copy data is stored in an electronically locked safe to which only I
66
have the security code. Electronic data is stored in an online database requiring two factor
authentication to access. After five years, I will destroy all confidential documentation
and other materials related to the research study. This documentation and other materials
include transcripts of interviews and other correspondence, recordings of interviews,
organizational documentation provided by the participant, informed consent forms, and a
field journal containing notes and other materials.
Data Analysis
I analyzed and interpreted data from the collected information to attempt to
generate themes and ideas. Researchers perform data analysis to discover themes that
pertain to the research question of the study (Thomas, 2015). For qualitative researchers,
data analysis provides information to apply and to discover additional relevant
information. (Kalu & Bwalya, 2017). Per Paulus, Woods, Atkins, & Macklin, (2017),
data analysis includes coding the data gathered and identifying themes from the data. I
used data analysis to identify themes, ideas, and patterns related to the research question
to get the best results from the gathered data. As an additional method to increase
confidence in my findings, triangulation was used for more reliable information.
Qualitative researchers use triangulation to increase the confidence of the research
findings. When qualitative researchers use triangulation for their research findings, they
are using three or more sources of data for the research (Overgaard, 2015). By using
triangulation, qualitative researchers increase the credibility and trustworthiness of a
qualitative study by combining data, connecting sources, and drawing conclusions (Busis
et al., 2017; Erlingsson & Brysiewicz, 2017). By increasing the confidence in the results
67
of a study, a qualitative researcher increases their credibility and the accuracy of the
results. There are several types of triangulation that qualitative researchers can use for
qualitative studies.
Qualitative researchers may use four types of triangulation for their research.
These four types of triangulation are (a) data triangulation, (b) investigator triangulation,
(c) theoretical triangulation, and (d) methodological triangulation (Erlingsson &
Brysiewicz, 2017; Walters, 2016). I used methodological triangulation for this study by
using notes from my field journal, interviews with participants, and organizational
documentation provided by the participants. Through the use of methodological
triangulation, qualitative researchers provide a full view of the research performed and
rely on more than one source for information (Overgaard, 2015). The most common
method of triangulation for a case study design is the methodological triangulation
method (Kalu & Bwalya, 2017).
The five-step process described by Yin (2017) was used to analyze information as
it relates to strategies used by organizational leadership and IT project managers to
manage their IT projects. The five steps are (a) compiling, (b) disassembling, (c)
reassembling, (d) interpreting, and (e) concluding (Yin, 2017). To ensure a high-quality
analysis, Yin (2017) suggests that qualitative researchers take all information gathered
and disassembling the data to regroup it prior to analyzing. This breakdown of the data
and reassembling makes the process of analysis simpler as the data will then be grouped
in a logical manner.
68
Compiling
For the compiling tasks, I gathered data from interviews of participants,
organizational documentation provided by participants, and from journal notes. I used
NVivo 12, Microsoft Word, and Microsoft Excel to collect and organize data. After
conducting the interviews, I read through the transcribed interviews, reviewed the
organizational documentation, and reviewed my journal notes to gain a greater
understanding of the information gathered. Qualitative researchers can identify concepts,
phases, and themes by examining data gathered several times thus revealing additional
information that may not be identified immediately (Karadzhov et al., 2019; Leedy &
Ormrod, 2013; Vernon-Dotson, 2013). I disassembled the data immediately after
compiling the data.
Disassembling
After compiling the data, disassembling the data began to identify concepts,
themes, and phases. During the disassembling task, coding started by tagging the data
into categories identified in the literature review. To identify themes or patterns correctly,
a code is used to represent the data collected (DeVaney, Spangler, Lee, & Delgadillo,
2018). After coding process occurs the categories or themes are then grouped (Eker &
Zimmermann, 2016). I identified themes and patterns in the data by listening to the audio
while transcribing the interviews. I also reviewed all organizational documentation
provided by participants and reviewed the field journal notes to identify additional
themes and patterns. Additional codes were added as they were identified during the
analysis as qualitative researchers should do so to continue analyzing additional themes
69
and patterns identified (Bengtsson, 2016). Immediately following the disassembling task,
data reassembling into logical groups began.
Reassembling
Reassembling the data into groups of common themes and groups began after
disassembling the data. I used NVivo 12 to organize and identify themes and groups as
this software is an appropriate and effective application for the organization of data and
the management tasks of the data (Ose, 2016). Researchers may discover themes and
groupings that may not have otherwise been discovered by using NVivo (Cai, Huang,
Liu, & Liang, 2016). The features of the NVivo 12 application such as the auto-coding
feature to identify and organize themes and groups was used. After reassembling the data
into themes and groups, interpretation of the meaning of the data collected occurred.
Interpreting
I interpreted the data after reassembling the data into logical themes and groups.
By identifying and interpreting themes and groups, I connected these themes and groups
with the research question of the study. By interpreting data that has been reassembled,
qualitative researchers may increase knowledge about the research question and may
open additional areas of study (Thomas, 2015; Yin, 2017). The themes and groups I
discovered through interpretation connected directly to the research question of the study
to increase the knowledge base of how IT project managers successfully implement IT
projects. After I interpreted the data, the data analysis portion of the study was
completed.
70
Concluding
The concluding step of this data analysis was to finalize the conclusions from the
study. Participants received a copy of my interpretation of the data gathered to allow
them to add information or thoughts to my interpretations. I enhanced the reliability and
validity of my interpretations by requesting feedback from the participants. By requesting
the perspective of participants on interpretations, qualitative researchers enhance the
accuracy and credibility of their interpretations (Birt et al., 2016). To enhance the
integrity of the data analysis and complete study, qualitative researchers will include
direct quotes from the participants (Karadzhov et al., 2019). Qualitative researchers must
ensure there are no personal biases and that findings should be based entirely upon the
data collected to increase the reliability and validity of the study (Noble & Smith, 2015).
I ensured that only the data gathered influenced my interpretations with no personal ideas
or biases affecting the interpretations. By doing so the reliability and validity of my study
was increased.
I used the NVivo 12 software to assist in coding and identifying patterns and
themes. The NVivo 12 application is an effective application or organize, manage, and
analyze data (Ose, 2016). Through the use of auto-coding in the data analysis phase,
researchers can use NVivo 12 to discover themes and patterns (Cai et al., 2016).
Following the pattern and theme recognition of the data analysis, the data was
investigated and correlated to the data to the literature review.
I focused on themes and patterns uncovered during the data analysis phase to
connect the themes and patterns from this phase to the themes and patterns discovered in
71
the literature review. I also focused on the themes and patterns uncovered during the data
analysis phase and correlate those themes and patterns to the conceptual framework
chosen for this study. I chose the coordination theory as the conceptual framework for
this study. Qualitative researchers may add depth of information by connecting
uncovered themes and patterns to the conceptual framework to assist in answering the
overarching research question (Karabulut-Ilgu, Cherrez, & Jahren, 2017; Yin, 2017).
Additionally, qualitative researchers may improve the integrity of the study by using
direct quotes from participants in the study during the data analysis phase (Karadzhov et
al., 2019). After completing the data analysis and the concluding phase, a greater
understanding of how IT managers successfully manage IT projects and implement
processes to positively impact those projects was gained.
Reliability and Validity
By developing the reliability and validity of a study, researchers increase the
quality of the themes and patterns in the study. Other researchers following the steps of
the original researcher will benefit from the reliability of the original research while
consistently concluding studies with similar results (Sanders et al., 2016). The accuracy
of the representation of a phenomenon is referred to as the validity of a study (Chen &
Han, 2016). Qualitative researchers must ensure a proper level of rigor in their study to
develop an appropriate amount of reliability and validity. Researchers must develop an
appropriate amount of rigor to accurately portray the findings of the study, increase the
confidence of the study, and provide appropriate details to replicate a study (Caffaro et
al., 2018). I included dependability, credibility, transferability, and confirmability to
72
increase the level of reliability and validity. These four qualities are positively associated
with rigor and increase the trustworthiness of the study (Hays, Wood, Dahl, & Kirk-
Jenkins, 2016).
Reliability
A key aspect of qualitative research is quality. Qualitative research must contain a
level of quality that must be present at every stage of the research process (Ali & Yusof,
2011). Qualitative researchers reach a saturation point where no new information is
uncovered creating a consistency of findings thus increasing the level of reliability
(Cadez, Czerny, & Letmathe, 2019; Varpio et al., 2017). Dependability, credibility,
transferability, and confirmability exist when trust is present in the findings of study
(Cadez et al., 2019; Golafshani, 2003).
Qualitative researchers focus on a high degree of reliability by increasing the level
of trustworthiness and dependability for their research. To increase the level of
dependability, researchers must ensure the study is repeatable and is able to be replicated
(Cadez et al., 2019; Lorenz et al., 2018). Several strategies exist to enhance the level of
trustworthiness such as triangulation, audit trails, and systematic data collection
procedures (Lorenz et al., 2018). To establish and enhance dependability for my study I
used systematic data collection and audit trails.
I enhanced the level of dependability in my study by conducting semistructured
interviews and using the interview protocol detailed in the Appendix. I used open-ended
questions along with a script that details instructions at the beginning of the interview and
summarizes information at the end of the interview. These semistructured interviews are
73
important because the structure of the questions allow the participant to add all detail they
possess (Jacob & Furgerson, 2012). To ensure consistency across all interviews,
researchers ask the same open-ended questions of all participants (Kallio et al., 2016). I
focused on asking each participant the same set of questions in the same order and the
same tone to ensure I received responses consistently from each participant.
I used a field journal during the interviews to write any notes on body language or
nonverbal cues. The field journal is effective to record additional information while also
writing about any ideas or problems that arise during data collection (Caffaro et al., 2018;
Doherty, 2011). The field journal serves as an additional data point that is useful when
creating an audit trail (Cadez et al., 2019). Researchers use these strategies to increase the
level of reliability in their study by enhancing consistency and descriptions of the
research process for their study.
Validity
Qualitative researchers conduct studies that include credibility, transferability, and
confirmability (Cadez et al., 2019). Qualitative researchers strive to increase the validity
of their study by demonstrating how the results of a study correlates with the phenomena
observed by the researcher (Cadez et al., 2019; Caffaro et al., 2018). A high level of
validity enhances the overall perception of a study by other researchers.
Credibility. To ensure a high degree of credibility, the researcher must carefully
select the participants of their study. The degree to which the perspective of a participant
is believable is how credible the perspective is to the researcher (Cadez et al., 2019;
Stieglitz et al., 2018). I used processes such as transcript review, member checking, and
74
triangulation to ensure all data was correct and each participant was comfortable with my
research and interpretations. By using such processes, I enhanced the level of credibility
for my findings. Each participant received the interview transcript created after each
interview and they received it via e-mail. A review time of seven days was set for the
participants to request changes or edits to the transcripts. After seven days had passed, I
considered the review and edit phase closed. If the participants had any changes or edits,
I analyzed the suggestions and updated my research as necessary. It was possible the
participant required a follow-up interview and I scheduled that follow-up interview
within seven days of the review and edit phase. Follow-up interviews may clarify any
questions after the initial interviews and the follow-up interviews may ensure an
enhanced amount of validity (Navimipour & Charband, 2016). The member checking
process is the process by which participants verify the accuracy of their answers and this
ensures a higher level of validity and also ensures that fewer errors or inaccuracies exist
in the transcripts and interpretations (Birt et al., 2016).
I used triangulation to enhance the level of validity for my study. Yin (2017) and
Cadez et al., (2019) remark that triangulation improves the validity of case studies by
crosschecking data collected from several sources. By crosschecking data from several
sources, I ensured a high level of consistency. The organizational documentation
provided by the participants was crosschecked with the interviews to increase the overall
credibility of the study.
Transferability. To enhance the validity of the study, I established transferability
of findings. If a study has a high degree of transferability, researchers can use the
75
findings of one study in another study that is similar to the initial study (Busis et al.,
2017; Cox et al., 2016; Petrova et al., 2016). I focused on creating rich descriptions of
data during the data analysis phase to ensure all data collected and interpretations were
easily transferable. Stieglitz et al., (2018) remarks that creating thick and rich
descriptions is necessary for easily transferable findings. Additionally, descriptions of
each participant were created to ensure the participants fit well within the bounds of what
is considered an appropriate participant. I identified and communicated with IT project
managers with at least one year of IT project management experience.
Confirmability. The third element of validity is confirmability. Confirmability is
the extent to which other researchers are capable of verifying and substantiating the
findings of a study (Stieglitz et al., 2018). Confirmability is achieved when qualitative
researchers complete the study and the results of the study reflect the responses of the
participants (Chen & Han, 2016). Additionally, researchers may achieve confirmability
by creating an audit trail displaying the decision-making during the study and why
judgments were made (Petrova et al., 2016). I kept a detailed field journal to document all
notes, judgments, and decisions made. Also, I ensured there was an awareness of
personal feelings and biases during the research process by maintaining a reflexive
journal. Removing personal feelings and biases is important piece of the confirmability
element.
Data saturation. I achieved data saturation to increase the quality of my study
and to improve reliability and validity. Researchers may improve the quality of the study
by displaying that data saturation has occurred (Hyett et al., 2014). I used the review of
76
literature to display data saturation. Researchers assume data saturation occurs when all
relevant information for the research question has been researched and no new
information will be found by analyzing other sources of data (Assarroudi et al., 2018). By
detecting the point at which no new relevant information is found, data saturation is
ensured. No new information such as ideas or themes should be revealed through further
examination of data if data saturation has occurred (Assarroudi et al., 2018).
Transition and Summary
In Section 2, I have described the research methodology of this study and have
detailed the benefits and consequences of using the research methodology. Additionally, I
have detailed why multiple case study design was the most effective design to use for this
study. The role of the researcher, the participants that will participate in this study, and
the selection criteria to determine the participants are detailed in Section 2. I detailed the
strategies I used for the data collection procedures and the data analysis stage. I detail
how reliability and validity of the study was established by including descriptions of the
processes and procedures of the study. In Section 3, I will present the findings of the
study, the recommendations for action, the recommendations for future research, and the
implications of social change due to the study and the results.
77
Section 3: Application to Professional Practice and Implications for Change
Introduction
The purpose of this qualitative multiple case study was to explore the strategies
project managers in the IT sector use for delivering successful IT projects. For this study,
my focus was to identify strategies used by project managers in the IT sector. Upon
receiving IRB approval to conduct this study (IRB approval #12-24-19-0676441), I
started the data collection process. The data collection process occurred during a 3-week
period and involved semistructured face-to-face interviews with six IT project managers
with at least 1 year of experience from three businesses in Northeast Ohio.
As written in my interview protocol, I met with each interviewee and recorded
and transcribed the interviews to gain a solid understanding of the data collected from the
participants. I triangulated the data gathered with the project documentation that each
participant provided from their place of employment. To code, analyze the data, and
identify themes, I used NVivo 12 software. From the data analysis, I found four main
themes: (a) communication amongst all members of the project, (b) professional
development in project management, (c) extensive planning, and (d) experience in the
field. These three themes provided information and insight in understanding the major
reasons IT project managers are successful in implementing IT projects.
Presentation of the Findings
The overarching research question of this study was as follows: What strategies
do project managers in the IT sector use for delivering successful IT projects? I
conducted semistructured interviews to answer this question. After conducting the
78
semistructured interviews I reviewed all responses and analyzed additional
documentation that each interviewee provided. I analyzed the data and triangulated the
responses of the interviewees. Each interview was conducted in a location selected by the
participant to ensure comfortability. Additionally, to ensure confidentiality of each
interviewee and the company represented, I coded each company and interviewee as
presented in Table 2.
Table 2
Participant and Organization Codes
Company A
Column B
Column C
Participant CA-
P1
Participant CB-
P3
Participant CC-
P5
Participant CA-
P2
Participant CB-
P4
Participant CC-
P6
The primary focus of this study was to determine strategies used by IT project
managers to effectively implement IT projects. The participants involved had varying
degrees of experience ranging from 5 years of experience to 20 years of experience
managing projects. Table 3 shows the participant along with the number of years of
experience and the theme or themes discussed in the interviews.
Table 3
Participants, Experiences, and Themes
Participant
Experience
in Years
Participant CA-
P1
5
Participant CA-
P2
14
Participant CB-
P3
7
79
Participant CB-
P4
20
Participant CC-
P5
6
Participant CC-
P6
5
Four themes emerged from the data analysis: (a) communication amongst all
members of the project, (b) professional development in project management, (c)
extensive planning, and (d) experience in the field. The discovered themes displayed a
wide understanding of the challenges facing IT project managers in Northeast Ohio.
Additionally, the themes provided insight into the strategies IT project managers used to
manage teams and resources.
Theme 1: Communication
The first theme that emerged was communication and how communication from
all levels aids in the successful completion of projects. Communication is one of the most
important factors for all IT projects and is also one of the most cited factors in the
literature about IT project management (Hassan, Ahmad, & Zuhaira, 2018; Kocherla,
2012; Müller & Jugdev, 2012; Rashid & Boussabiane, 2019; Slepian, 2013). Two of the
six participants remarked that communication was a key factor in successful projects.
Participant CA-P1 remarked that communication was the most important factor in the
success of IT projects because communication allows for both successes and failures to
be communicated to all stakeholders of the project. Not only did participant CA-P1
remark that communication was important but that it was necessary to ensure success of
any IT project, and this included communication from the leadership overseeing the
project all the way to the individual project members performing everyday tasks.
80
Participant CC-P6 remarked that communication was an integral part of the
success of all IT projects. Participant CC-P6 also stated that if there is no communication
or if improper channels of communication were used, the project should be considered a
risk because the varying participants of the project may then work toward goals that did
not align with the project as a whole. Participant CC-P6 said that without proper
communication, the project becomes at risk of failure at the onset. The importance of
communication as stated by two of the six participants confirmed the findings of
researchers in the field that communication is a critical factor in the successful
implementation of IT projects (Jan, Dad, Amin, Hameed, & Shah, 2016).
Zuofa and Ochieng (2017) found that communication strategies used in the proper
format and with the proper participants were critical for the success of project
implementation. Participants CA-P1 and CC-P6 both followed a logical communication
methodology to ensure all participants were kept up-to-date and knew what other
participants in the project were working toward. Stakeholders from leadership were also
aware of how the projects were proceeding because of effective communication. Both
CA-P1 and CC-P6 effectively communicated leadership decisions to project team
members to ensure communication was present at all levels of the project. The
organizational documentation provided by CA-P1 and CC-P6 on how IT projects were to
be implemented included a section on communication. This section on communication
from both participants stressed the importance of face-to-face meetings to keep
stakeholders and project team members updated. Weekly and biweekly meetings were
held at all levels by both participants CA-P1 and CC-P6.
81
Participant CA-P1 remarked that all team members and stakeholders were in the
same building every day so face-to-face communication was an easy task. Participant
CA-P1 set up meetings with leadership and other high-level stakeholders every 2 weeks
and allowed for up to 2 hours of discussion to ensure there was enough time to
communicate progress, issues, and resolutions. For the project team members, participant
CA-P1 set up daily meetings that were no more than 15 minutes and had weekly
meetings to discuss all progress for that week. Participant CA-P1 remarked that the
scheduled meetings were not the only meetings during the week as they had a
relationship with nearly all project participants and would discuss the specifics about the
project in a less formal structure at other times during the week.
Participant CC-P6 created a communication plan at the beginning of each phase
of the project with the assistance of project leadership. This communication plan detailed
when meetings should occur and how often participant CC-P6 should meet with each
level of the project team. Participant CC-P6 indicated that even though the
communication plan was very specific, these plans would often not occur as expected
because there were several members of the stakeholder group that were routinely
unavailable and so the communication plan could not occur as laid out. Participant CC-P6
indicated that communication still existed throughout the project but would often occur
through text messages or e-mails.
Participants CA-P1 and CC-P6 demonstrated an ability to communicate
effectively with stakeholders and project team members and many studies have affirmed
the findings of this research showing that proper communication is essential to the
82
successful implementation of IT projects (Deshpande, Beecham, & Richardson, 2013;
Kuehn, 2016). Additionally, the highly-regarded Project Management Institute created
the Project Management Book of Knowledge that included an entire chapter about the
importance of communication in project management (PMI, 2017).
Theme 2: Professional Development
The second theme was professional development and the positive outcome of
using resources aimed at furthering knowledge and information about project
management. Two participants, CB-P4 and CC-P6, remarked that professional
development for IT project management is an important strategy to ensuring successful
IT project management. Professional development from both internal and external
sources is important to better understand how future projects occur for organizations
(Langley, 2015). Both CB-P4 and CC-P6 had well-documented professional development
experiences and focused on increasing their knowledge of IT project management by
using classroom learning and conferences to enhance their experience.
Participants CB-P4 and CC-P6 work for organizations that require documentation
of attendance at professional development classes and of passing along information
learned from the classes to the other parts of the organization. After attending the
professional development classes, CB-P4 was required to hold several small conferences
with those coworkers interested in hearing about the professional development classes
and the content that came from them. CC-P6 was required to hold one larger seminar in
which all employees in the organization were invited to attend. In both situations the
meetings were recorded and posted on an internal company website.
83
By attending professional development classes, participants CB-P4 and CC-P6
learned from the mistakes and successes of other IT project managers and then passed
along that information to others in the organization. This method of information
gathering through professional development allowed participants CB-P4 and CC-P6 to
draw on knowledge that they did not previously possess and go through a sort of
postproject review on projects they did not manage. By going through this practice during
the professional development classes, participants CB-P4 and CC-P6 identified what
went right or wrong in the final phase of the project and used this knowledge to ensure
they and others would not commit the same mistakes in future projects. The final part of
the closing phase is the postproject review where the researcher appraises what was
successful and what was a failure during the project (Windapo et al., 2014). Participants
CB-P4 and CC-P6 used the knowledge gained from the professional development classes
to gather information in a more detailed and thorough process so they could then apply
those learnings to projects in the future.
Theme 3: Planning
The third theme was planning for the project both before the project started and
while the project was underway. Two participants, CA-P1 and CB-P3, identified planning
as one of the most important pieces to successfully implementing an IT project. Both
participants identified in-progress planning as an important tool to understand the
direction of the project and to ensure high performance. Monitoring and controlling
activities used by project managers assist in understanding the direction of the project and
if the project is moving along successfully or if something within the project needs to be
84
changed (PMI, 2017). Project managers must monitor the correct activities and decisions
to understand the day-to-day progress of each project and understand how each
interaction affects other parts of the project (Mauerhoefer et al., 2017). Participants CA-
P1 and CB-P3 used appropriate monitoring and controlling systems provided by their
organization to assist in decision-making and to provide greater definition to the direction
of the projects.
For both CA-P1 and CB-P3 and their respective organizations, Microsoft Office
Project was used to monitor and control the project and timelines associated with the
project. Both participants tracked timeline and resource availability while also using the
dependency function of Microsoft Office Project. Both participants conducted daily and
weekly meetings to communicate and understand the progress of all projects. By using a
Gantt chart, both participants gave an illustrated display of the project progress while also
displaying the dependencies each task was associated with. The participants planned with
both stakeholders and project team members to get a better understanding of the project
and the direction needed after each meeting.
Participants CA-P1 and CB-P3 understood that to successfully implement an IT
project there would need to be a high degree of monitoring and the flexibility to change
dependent upon what happened on a day-to-day basis. The plan must be constantly
compared to the progress of the project which requires constant monitoring and updating
(Allen et al., 2014; Zhang & Zuo, 2016). The PMI (2017) stated that project managers
must frequently monitor and control the progress of projects to ensure that the established
85
project plan is being followed while also adapting the needs of the project to fit any
changes that may occur.
Theme 4: Experience
The fourth theme that emerged was experience and how learning from prior
projects, both successful and unsuccessful, can aid a project manager in the
implementation of other projects. Participants CA-P2, CB-P3, CB-P4, and CC-P5
recognized experience as being an important part in implementing successful IT projects.
Similar to professional development, experience allows the participants to understand
how and why projects in the past succeeded and failed (Langley, 2015). All four
participants that identified experience as an important factor in IT project implementation
stated they performed a lessons learned meeting at the end of the project to gather as
much information as possible for what went correctly during the project and what failed
during the project.
Participants CA-P2, CB-P4, and CC-P5 used organizational documentation to
determine what was successful in the project and what was not successful in the project.
These documents were formalized by the organization and after they were completed the
participants would meet with leadership to determine the next steps in implementing
further projects based on the experience from the project that had just concluded.
Participant CB-P3 was not provided with formal documentation by their organization but
the expectation after a project had concluded was for participant CB-P3 to gain an
understanding of the successes and failures of the project and report them to all
stakeholders in a meeting before formally closing the project. All documentation for all
86
four participants was required to be signed by the CTO before formally closing each
project.
Participants CB-P4 and CC-P5 conducted a formal process for both the closure
and opening of new projects. These two participants were required by their organization
to use the documentation on successes and failures of their previous projects to plan for
their next project to aid in avoiding the failures that occurred previously. Researchers
have affirmed the importance of using documentation from previous projects to avoid
similar mistakes in future projects thus confirming the findings of this study (Allen et al.,
2014; Winch & Leiringer, 2016; Zhang & Zuo, 2016). Participants CB-P4 and CC-P5
remarked that the formal process of using the documentation on the successes and
failures of their previous projects aided them in making positive decisions in the
following projects. Both participants stated that the process was not perfect, but they felt
more comfortable making decisions than they would have otherwise.
Findings Related to the Conceptual Framework
Malone and Crowston (1994) developed the coordination theory which is the
basis of the conceptual framework for this study. To be successful in any project, leaders
must develop processes and procedures to coordinate communication and project work
among different groups (Malone & Crowston, 1994). The results and findings of this
study indicates the applicability of coordination theory and confirms the general idea of
coordination theory. Project managers that successfully implement IT projects use
effective communication and coordination amongst all parties in an organization (Tan et
al., 2017; Thalmann et al., 2014). Using the coordination theory, I uncovered and
87
identified themes and strategies that IT project managers use to successfully implement
projects.
The results of this study demonstrate that correct and proper coordination of
activities by project managers and project teams is important to the success of the project
(Tan et al., 2017). Also demonstrated through the findings of this study is that inefficient
or poor coordination in projects remains problematic for IT project managers and lowers
the likelihood of successful implementation of IT projects (Jiang & Klein, 2014).
Because of the complex nature of IT projects, project managers are required to
understand how to coordinate functions throughout the organization and amongst the
many levels of employees within the organization (Barata & Cunha, 2017).
Findings Related to Existing Literature
The results and findings of this study may add to the existing body of literature by
promoting specific strategies to ensure that IT project managers are as well prepared as
possible to successfully implement an IT project. All strategies used by the participants of
this study aligned closely with the existing literature on strategies to successfully
implement IT projects. Purkayastha and Sharma (2016) noted that identifying and using
the best possible strategies helps to successfully implement IT projects thus increasing
the capabilities of the IT department in an organization.
The four themes identified in this study are communication, professional
development, planning, and experience. Communication is a wide topic but the
participants that specifically identified communication as an important piece of
successfully implementing an IT project specified that communication includes daily,
88
weekly, and monthly meetings. The participants also noted that the correct type of
communication is necessary to successfully communicate with all levels of the
organization. The communication ideas presented by the participants links directly with
the coordination theory as posed by Malone and Crowston (1990) suggesting that IT
project managers must understand the dependencies and what is happening with their
project to understand how to best coordinate all functions for a project. Communication
among all levels of the project and stakeholder teams is not only useful but necessary for
a project manager to grasp progress and dependencies for the project (Crowston, 1997).
With the advent of agile project methodologies, many IT project managers used those
strategies that work best for their projects (Azanha et al., 2017; Ozieranska et al., 2016).
Because agile project methodology focuses on a constant stream of communication with
many meetings, the participants of this study focused on meetings for their primary
method of communication.
Applications to Professional Practice
The purpose of this study was to explore the strategies that IT project managers
use to effectively manage and implement IT projects. As IT continues to grow and
support more departments of all organizations, leaders must rely on IT capabilities to not
only fix issues that arise but also implement new solutions that helps organizations move
forward (Sanchez-Morcilio & Quiles-Torres, 2016; Thalmann et al., 2014). The four
themes gathered from IT project managers may have a positive effect on the strategies
used by IT project managers. The findings and results of this study may assist IT project
managers in using the correct tools to best implement an IT project. IT leaders may also
89
gain a better understanding of the effective methods and strategies of implementing an IT
project and may create new or additional organizational standards to which IT project
managers must adhere.
The results contained in this study are relevant to professional practice because
the findings were gathered from IT project managers with varying levels of experience
who have successfully implemented IT projects. IT project managers continue to fail at
implementing IT projects as a majority of these IT projects do not progress as expected
(Larson & Chang, 2016; Terlizzi, de Souza, & de Moraes, 2016). The results of this study
may assist IT project managers and IT leaders to better understand what an IT project
needs to be successfully implemented. Current IT project managers may use the findings
of this study to implement better practices and procedures whereas future IT project
managers may get a positive start to their career as an IT project manager by using the
findings of this study.
Implications for Social Change
The findings of this study may help to create positive social change by providing
knowledge to IT project managers, IT leaders, and organizations as a whole thus creating
and maintaining job growth which will, in turn, impact the local community standard of
living. By implementing the strategies and information in this study, IT leaders may
promote positive growth in the business and may implement more successful projects
leading to resources being used more across a larger range of products and services. The
innovative efforts of organizations will increase thus leading to more innovative products
and services. These innovations can lead to a reduction in the cost of products and
90
services thus allowing customers of the products and services to buy more with the
resources they possess. Additional benefits such as improved quality in the products and
services, higher customer satisfaction, and an increase in sales are some of the benefits
that may follow the use of more effective strategies.
Through an increase in organizational efficiency, the local community may
benefit through consideration of hiring more employees as efficiencies increase.
Additionally, products and services may become more available to the general public
through the reduction in cost of these products and services. An increase in volunteerism
and charitable giving may also occur. Increased efficiencies in the organization may
possibly lead to more proactive engagement by the organization in the local and remote
communities.
Recommendations for Action
The findings of this study may assist current and future IT project managers to
anticipate challenges and issues that may arise during IT projects. In this study, I
explored the strategies used by IT projects managers to successfully implement an IT
project. Based on the results of this research, I recommend the following to all current
and future IT project managers:
• schedule daily meetings,
• schedule weekly meetings,
• develop a project plan to gather and record requirements,
• create a communication plan that includes all project team members,
• create risk assessments and risk mitigation plans,
91
• develop a lessons learned schedule after each major accomplishment.
The results of this study are significant and applicable to IT project managers, IT
stakeholders, IT professionals, and any organizational leader that works with or leads an
IT team. To communicate these strategies from this study I will submit the results to
journals and other professional literature. Additionally, I will present the findings to my
local PMI Cleveland Chapter. I will also present these findings to my coworkers who
desire to learn more about effective IT project management strategies.
Recommendations for Further Research
The purpose of this qualitative multiple case study was to explore the strategies
used by IT project managers to successfully implement an IT project. For this study, I
identified three limitations. The first limitation dealt with only allowing IT project
managers to take part in the study. To overcome this limitation, I contacted only those
potential participants that I knew to be currently employed as an IT project manager. The
second limitation I identified was that each IT project manager was required to have at
least one year of IT project manager experience while also having completed successfully
at least one IT project. The definition of a successful implementation of a project was
determined to be a project that was completed both on time and having used only the
allotted resources or less than the allotted resources. To overcome this limitation, I
contacted only those IT project managers I knew to have successfully implemented IT
projects in the past. The third limitation concerned the sample size and the geographic
location of the study. I limited the study to include a sample size of six IT project
managers from the Northeast Ohio area. To overcome this limitation, future researchers
92
could expand the geographic location of the study as well as increasing the sample size of
the study. Based on the limitations of this study, I recommend future research consider
the following:
• use a larger sample size of IT project managers,
• increase the geographic region to other states or other areas of Ohio,
• consider using IT project managers from other countries,
• use different methodologies than this study,
• research more deeply into specific IT projects rather than all of IT.
Reflections
The DBA Doctoral study process was a long and challenging process but,
ultimately, a fulfilling and rewarding one. Prior to the start of this program, I generally
understood the difficulty and time commitment this journey would require but did not
anticipate the full extent of the time commitment. The time commitment has been a
consistent challenge to overcome as there are always situations in life occurring that takes
away from my academic focus.
Based on the subject of this study, I did have preconceived ideas about the subject
matter because I am an IT project manager and have many years of experience so I am
already aware of many of the strategies that are required to successfully implement an IT
project. To mitigate any potential biases on the subject matter, I focused only on the facts
and research I found in articles and other forms of research. When interviewing
participants, I did not lead them into any answer and allowed them to speak as much or as
little about a topic as they desired. If I required clarification of an answer, I would ask the
93
participant to repeat their answer in a different manner so I could better understand the
response given. Additionally, I used NVivo software to aid in the generation of themes
and the interpretation of results to mitigate any bias I may have had. To further increase
reliability and credibility, member checking was used so the participants were able to see
a summary of their responses and my interpretations and they were able to correct
anything that was incorrect.
During the interview process, I identified four major themes from the participants.
Several of the participants had very similar responses to one another and used the same
general strategies to successfully implement IT projects. While there was variation in the
responses received by the participants, most used very similar strategies. Because of these
responses, I now have a better grasp of some of the basic concepts of IT project
management that I did not incorporate into my own process before. Additionally, with
this gathering of knowledge, all six participants expressed interest in receiving a
summary of findings so they could use the techniques that others use.
Conclusion
For this qualitative multiple case study, I explored the strategies IT project
managers use to successfully implement IT projects. I collected data from IT project
managers with at least one year of experience and one successfully implemented IT
project. The data was collected in the Northeast Ohio geographical area. I used
methodological triangulation to analyze two sources of data until I reached data
saturation. From the data, four major themes were identified that can could assist both IT
stakeholders and IT project managers to improve the implementation of IT projects. The
94
four major themes included (a) effective communication, (b) professional development,
(c) extensive planning, and (d) experience in the IT project management field. Each
theme was analyzed in relation to existing literature and I used coordination theory to
address the differing levels of complexity in successfully implementing an IT project.
Identifying and using the strategies to successfully implement IT projects is the main
contribution to business practice. The potential positive social change is the increase in
efficiency in organizations thus potentially leading to more community involvement
through increased hiring and larger charitable acts.
95
References
Aaltonen, K., & Kujala, J. (2016). Towards an improved understanding of project
stakeholder landscapes. International Journal of Project Management, 34, 1536-
1552. doi:10.1016/j.ijproman.2016.08.009
Abbasianjahromi, H., Sepehri, M., & Abbasi, O. (2018). A decision-making framework
for subcontractor selection in construction projects. Engineering Management
Journal, 30, 141-152. doi:10.1080/10429247.2018.1448967
Acevedo, A. L. R. (2016). Strategies to control internal factors affecting information
systems projects in Puerto Rico (Doctoral dissertation). Walden Dissertations and
Doctoral Studies database. (UMI No. 3119)
Addas, S., & Pinsonneault, A. (2016). IT capabilities and NPD performance: Examining
the mediating role of team knowledge processes. Knowledge Management
Research & Practice, 14, 76-95. doi:10.1057/kmrp.2014.16
Ahamed, R. S. S. (2012). Moving toward effective software project scheduling and
planning to establish reasonable plans for performing the software engineering
and for managing the software project. GESJ: Computer Science and
Telecommunication, 1(33), 21-29. Retrieved from
http://gesj.internetacademy.org.ge
Ali, A., & Yusof, H. (2011). Quality in qualitative studies: The case of validity,
reliability, and generalizability. Social and Environmental Accounting, 5(1), 25-
64. Retrieved from http://www.iiste.org
96
Aljawarneh, S., Alawneh, A., & Jaradat, R. (2017). Cloud security engineering: Early
stages of SDLC. Future Generation Computer Systems, 74, 385-392.
doi:10.1016/j.future.2016.10.005
Allen, M., Alleyne, D., Farmer, C., McRae, A., & Turner, C. (2014). A framework for
project success. Journal of IT and Economic Development, 5(2), 1-17. Retrieved
from http://www.tandfonline.com/toc/RJTE20/current
Almgren, K. (2014). Information technology project management processes and
practices: A comprehensive study for successful implementation of IT projects.
International Journal of Business and Social Science, 5(11), 84-92. Retrieved
from http://www.ijbssnet.com/
Alsharo, M., Gregg, D., & Ramirez, R. (2017). Virtual team effectiveness: The role of
knowledge sharing and trust. Information & Management, 54, 479-490.
doi:10.1016/j.im.2016.10.005
Annansingh, F., & Howell, K. (2016). Using phenomenological constructivism (pc) to
discuss a mixed method approach in information systems research. Electronic
Journal of Business Research Methods, 14(1), 39-49. Retrieved from
http://www.ejbrm.com/main.html
Antonenko, P. D. (2015). The instrumental value of conceptual frameworks in
educational technology research. Education Technology Research and
Development, 63, 53-71. doi:10.1007/s11423-014-9363-4
97
Armour, P. G. (2013). The business of software: How we build things and why things are
90% complete. Communications of the ACM, 56(1), 32-33.
doi:10.1145/2398356.2398367
Arseven, I. (2014). A study design using qualitative methods for program evaluation.
International Journal of Academic Research, 6, 417-422.
doi:10.7813/20754124.2014/6-1/B.56
Assarroudi, A., Nabavi, F. H., Armat, M. R., Ebadi, A., & Vaismoradi, M. (2018).
Directed qualitative content analysis: The description and elaboration of its
underpinning methods and data analysis process. Journal of Research in Nursing,
23(1), 42-55. doi:10.1177/1744987117741667
Azanha, A., Argoud, A. T., Camargo, J. D., & Antoniolli, P. D. (2017). Agile project
management with scrum. International Journal of Managing Project in Business,
10, 121-142. doi:10.1108/IJMPB-06-2016-0054
Badewi, A. (2016). The impact of project management (PM) and benefits management
(BM) practices on project success: Towards developing a project benefits
governance framework. International Journal of Project Management, 34, 761-
778. doi:10.1016/j.ijproman.2015.05.005
Banks, G. C., Pollack, J. M., & Seers, A. (2016). Team coordination and organizational
routines: Bottoms up – and top down. Management Decision, 54, 1059-1072.
doi:10.1108/MD-07-2014-0442
Barata, J., & Cunha, P. R. (2017). Synergies between quality management and
information systems: A literature review and map for further research. Total
98
Quality Management & Business Excellence, 28, 282-295.
doi:10.1080/14783363.2015.1080117
Bengtsson, M. (2016). How to plan and perform a qualitative study using content
analysis. NursingPlus Open, 2, 8-14. doi:10.1016/j.npls.2016.01.001
Bevort, F., & Suddaby, R. (2016). Scripting professional identities: How individuals
make sense of contradictory institutional logics. Journal of Professions and
Organization, 3(1), 17-38. doi:10.1093/jpo/jov007
Bhutani, K., Kumar, M., Garg, G., & Aggarwal, S. (2016). Assessing IT projects success
with extended fuzzy cognitive maps & neutrosophic cognitive maps in
comparison to fuzzy cognitive maps. Neutrosophic Sets and Systems, 12, 9-19.
doi:10.5281/zenodo.571131
Birken, S. A., Lee, S. Y. D., Weiner, B. J., Chin, M. H., Chiu, M., & Schaefer, C. T.
(2015). From strategy to action: How top managers’ support increases middle
managers’ commitment to innovation implementation in healthcare organizations.
Health Care Management Review, 40, 159-168.
doi:10.1097/HMR.0000000000000018
Birt, L., Scott, S., Cavers, D., Campbell, C., & Walter, F. (2016). Member checking: A
tool to enhance trustworthiness or merely a nod to validation? Qualitative Health
Research, 26, 1802-1811. doi:10.1177/1049732316654870
Boddy, C. (2016). Sample size for qualitative research. Qualitative Marketing Research,
19, 426-432. doi:10.1108/QMR-06-2016-0053
99
Busis, N. A., Shanafelt, T. D., Keran, C. M., Levin, K. H., Schwarz, H. B., Molano, J. R.,
. . . Cascino, T. L. (2017). Burnout, career satisfaction, and well-being among US
neurologists in 2016. Neurology, 88, 797-808.
doi:10.1212/WNL.0000000000003640
Cadez, S., Czerny, A., & Letmathe, P. (2019). Stakeholder pressures and corporate
climate change mitigation strategies. Business Strategy & the Environment, 28, 1-
14. doi:10.1002/bse.2070
Caffaro, F., Lundqvst, P., Cremasco, M. M., Nilsson, K., Pinzke, S., & Cavallo, E.
(2018). Machinery-related perceived risks and safety attitudes in senior Swedish
farmers. Journal of Agromedicine, 23, 78-91.
doi:10.1080/1059924X.2017.1384420
Cai, Z., Huang, Q., Liu, H., & Liang, L. (2016). The moderating role of information
technology capability in the relationship between supply chain collaboration and
organizational responsiveness: Evidence from China. International Journal of
Operations & Production Management, 36, 1247-1271. doi:10.1108/IJOPM-08-
2014-0406
Caliandro, A. (2018). Digital methods for ethnography: Analytical concepts for
ethnographers exploring social media environments. Journal of Contemporary
Ethnography, 47, 551-578. doi:10.1177/0891241617702960
Caputo, F., Veltri, S., & Venturelli, A. (2017). Sustainability strategy and management
control systems in family firms. Evidence from a case study. Sustainability, 9,
977-999. doi:10.3390/su9060977
100
Castillo-Montoya, M. (2016). Preparing for interview research: The interview research
protocol refinement framework. Qualitative Report, 21, 811-831. Retrieved from
https://nsuworks.nova.edu/tqr/vol21/iss5/2
Castleberry, A. (2014). NVivo 10 [software program]. Version 10. QSR International;
2012. American Journal of Pharmaceutical Education, 78(1), 1-21.
doi:10.5688/ajpe78125
Chen, L., & Han, W. J. (2016). Shanghai: Front-runner of community-based eldercare in
China. Journal of Aging and Social Policy, 28. 292-307.
doi:10.1080/08959420.2016.1151310
Chen, T., Fu, M., Liu, R., Xu, X., Zhou, S., & Liu, B. (2019). How do project
management competencies change within the project management career model
in large Chinese construction companies? International Journal of Project
Management, 37, 485-500. doi:10.1016/j/ijproman.2018.12.002
Chughtai, H., & Myers, M. D. (2017). Entering the field in qualitative field research: A
rite of passage into a complex practice world. Information Systems Journal, 27,
795-817. doi:10.1111/isj.12124
Church, K. S., Schmidt, P. J., & Smedley, G. (2016). Casey’s collections: A strategic
decision-making case using the systems development lifecycle—planning and
analysis phases. Journal of Emerging Technologies in Accounting, 13(2), 231-
245. doi:10.2308/jeta-51472
101
Clayton, D. (2016). Volunteers’ knowledge activities at UK music festivals: A
hermeneutic-phenomenological exploration of individuals’ experiences. Journal
of Knowledge Management, 20, 162-180. doi:10.1108/JKM-05-2015-0182
Cleland, D. I. (2007). Strategic management: The project linkages. The Wiley Guide to
project, program & portfolio management (2nd Ed.). Hoboken, NJ: John Wiley &
Sons. doi:10.1002/9780470172391.ch9
Conklin, T. A. (2014). Phenomenology redux: Doing phenomenology, becoming
phenomenological. Organization Management Journal, 11, 116-128.
doi:10.1080/15416518.2014.929935
Conrow, E. H., & Shishido, P. S. (1997). Implementing risk management on software
intensive projects. IEEE Software 14, 3, 83–89. doi:10.1109/52.589242
Corsaro, D. (2019). Capturing the broader picture of value co-creation management.
European Management Journal, 37, 99-116. doi:10.1016/j.emj.2018.07.007
Cox, J., Cormack, C., Prendergast, M., Celestino, H., Willis, S., & Witteveen, M. (2016).
Patient and provider experience with a new model of care for primary hip and
knee arthroplasties. International Journal of Orthopaedic and Trauma Nursing,
20, 13-27. doi:10.1016/j.ijotn.2015.05.003
Crowston, K. (1997). A coordination theory approach to organizational process design.
Organization Science, 8, 157-176. doi:10.1287/orsc.8.2.157
Curtis, A. M., Dennis, A. R., & McNamara, K. O. (2017). From monologue to dialogue:
Performative objects to promote collective mindfulness in computer-mediated
102
team discussions. MIS Quarterly, 41, A1-A6. Retrieved from
http://www.misq.org/
Dempsey, L., Dowling, M., Larkin, P., & Murphy, K. (2016). Sensitive interviewing in
qualitative research. Research in Nursing & Health, 39, 480-490.
doi:10.1002/nur.21743
Deshpande, S., Beecham, S., & Richardson, I. (2013). Using the PMBOK? Guide to
frame GSD coordination strategies. Proceedings – IEEE 8th International
Conference on Global Software Engineering, ICGSE 2013, 188-196.
doi:10.1109/ICGSE.2013.32
DeVaney, S., Spangler, A., Lee, Y. A., & Delgadillo, L. (2018). Tips from the experts on
conducting and reviewing qualitative research. Family & Consumer Sciences, 46,
396-405. doi:10.1111/fcsr.12264
Doherty, M. (2011). Using organizational, coordination, and contingency theories to
examine project manager insights on Agile and traditional success factors for
information technology projects (Doctoral dissertation). ProQuest Dissertations
and Theses database. (UMI No. 3478454)
Duffy, J. M. N., Rolph, R., Gale, C., Hirsch, M., Khan, K. S., Ziebland, S., & McManus,
R. J. (2017). Core outcome sets in women’s and newborn health: A systematic
review. An International Journal of Obstetrics and Gynaecology, 124, 1481-1489.
doi:10.1111/1471-0528.14694
Eker, S., & Zimmermann, N. (2016). Using textual data in system dynamics model
conceptualization. Systems, 4(3), 28-41. doi:10.3390.systems4030028
103
Englander, M. (2016). The phenomenological method in qualitative psychology and
psychiatry. International Journal of Qualitative Studies in Health and Well-being,
11, 1-11. doi:10.3402/qhw.v11.3068
Erlingsson, C., & Brysiewicz, P. (2017). A hands-on guide to doing content analysis.
African Journal of Emergency Medicine, 7(3), 93-99.
doi:10.1016/j.afjem.2017.08.001
Evans, B. (2018). HIPAA’s individual right of access to genomic data: Reconciling
safety and civil rights. American Journal of Human Genetics, 102, 5-10.
doi:10.1016/j.ajhg.2017.12.004
Finlay, K., Peacock, S., & Elander, J. (2018). Developing successful social support: An
interpretative phenomenological analysis of mechanisms and processes in a
chronic pain support group. Psychology & Health, 33, 846-871.
doi:10.1080/08870446.2017.1421188
Fletcher, D., de Massis, A., & Nordqvist, M. (2016). Qualitative research practices and
family business scholarship: A review and future research agenda. Journal of
Family Business Strategy, 7(1), 8-25. doi:10.1016/j.jfbs.2015.08.001
Fusch, P. I., & Ness, L. R. (2015). Are we there yet? Data saturation in qualitative
research. The Qualitative Report, 20, 1408-1416. Retrieved from
http://nsuworks.edu
Gehman, J., Glaser, V. L., Eisenhardt, K. M., Gioia, D., Langley, A., & Corley, K. G.
(2018). Finding theory—method fit: A comparison of three qualitative approaches
104
to theory building. Journal of Management Inquiry, 27, 284-300.
doi:10.1177/1056492617706029
Geithner, S., & Menzel, D. (2016). Effectiveness of learning through experience and
reflection in a project management simulation. Simulation & Gaming, 47, 228-
256. doi:10.1177/1046878115624312
Golafshani, N. (2003). Understanding reliability and validity in qualitative research. The
Qualitative Report, 8, 597-606. Retrieved from http://www.tqr.nova.edu
Gray, D., & Jones, K. (2016). Using organizational development and learning methods to
develop resilience for sustainable futures with SMEs and micro businesses.
Journal of Small Business and Enterprise Development, 23, 474-494.
doi:10.1108/JSBED-03-2015-0031
Gresham, G., & Burleigh, C. (2019). Exploring early childhood preservice teachers’
mathematics anxiety and mathematics efficacy beliefs. Teaching Education, 30,
217-241. doi:1080/10476210.2018.1466875
Guha, S., & Chakrabarti, S. (2016). Differentials in attitude and employee turnover
propensity: A study of information technology professionals. Global Business &
Management Research, 8(1), 1-17. Retrieved from http://www.gbmr.ioksp.com
Guo, J. X. (2019). Measuring information system project success through a software-
assisted qualitative content analysis. Information Technology and Libraries,
38(1). 53-70. doi:10.6017/ital.v38i1.10603
Gupta, A., Kannan, K., & Sanyal, P. (2018). Economic experiments in information
systems. MIS Quarterly, 42, 595-606. doi:10.25300/MISQ/2018/13049
105
Hak, S., Morandi, P., & Magenes, G. (2018). Prediction of inter-storey drifts for regular
RC structures with masonry infills based on bare frame modeling. Bulletin of
Earthquake Engineering, 16, 397-425. doi:10.1007/s10518-017-0210-y
Hamersly, W. (2015). Business governance best practices of virtual project teams
(Doctoral dissertation). ProQuest Dissertations and Theses database. (UMI No.
3682520)
Hassan, I., Ahmad, N., & Zuhaira, B. (2018). Calculating completeness of software
project scope definition. Information and Software Technology, 94, 203-233.
doi:10.1016/j.infsof.2017.10.010
Havakhor, T., & Sabherwal, R. (2018). Team processes in virtual knowledge teams: The
effects of reputation signals and network density. Journal of Management
Information Systems, 35, 266-318. doi:10.1080/07421222.2018.144075
Hays, D. G., Wood, C., Dahl, H., & Kirk-Jenkins, A. (2016). Methodological rigor in
journal of counseling & development qualitative research articles: A 15-year
review. Journal of Counseling & Development, 94, 172-183.
doi:10.1002/jcad.12074
Hermano, V., & Martin-Cruz, N. (2016). The role of top management involvement in
firms performing projects: A dynamic capabilities approach. Journal of Business
Research, 69, 3447-3458. doi:10.1016/j.jbusres.2016.01.041
Hill, C., Knafl, K., & Santacroce, S. J. (2018). Family-centered care from the perspective
of parents of children cared for in a pediatric intensive care unit: An integrative
review. Journal of Pediatric Nursing, 41, 22-33. doi:10.1016//j.pedn.2017.11.007
106
Hitch, D. (2016). Attitudes of mental health occupational therapists toward evidence-
based practice. Canadian Journal of Occupational Therapy, 83(1), 27-32.
doi:10.1177/0008417415583108
Holmes, E. A., Blackwell, S. E., Heyes, S. B., Renner, F., & Raes, F. (2016). Mental
imagery in depression: Phenomenology, potential mechanisms, and treatment
implications. Annual Review of Clinical Psychology, 12, 249-280.
doi:10.1146/annurev-clinpsy-021815-092925
Hooper, L. A. (2013). Exploration of the project management practitioner’s emotional
intelligence competencies (Doctoral study). ProQuest Dissertations and Theses
database. (UMI No. 3604406)
Hyett, N., Kenny, A., & Dickson-Swift, V. (2014). Methodology or method? A critical
review of qualitative case study reports. International Journal of Qualitative
Studies on Health and Well-Being, 9, 1-12. doi:10.3402/qhw.v9.23606
Jacob, S. A., & Furgerson, S. P. (2012). Writing interview protocols and conducting
interviews: Tips for students new to the field of qualitative research. The
Qualitative Report, 17(42), 1-10. Retrieved from http://www.tqr.nova.edu
Jan, S. R., Dad, F., Amin, N., Hameed, A., & Shah, S. S. A. (2016). Issues in global
software development (communication, coordination and trust): A critical review.
Journal of Software Engineering and Applications, 2(2), 660-663. Retrieved from
http:www.ijsrset.com
107
Javani, B., & Rwelamila, P. M. D. (2016). Risk management in IT project: A case of the
South African public sector. International Journal of Managing Projects in
Business, 9, 389-413. doi:10.1108/IJMPB-07-2015-0055
Jensen, R. K., Agersted, M. E. I., Nielsen, H. A., & O’Neill, S. (2020). A cross-sectional
study of website claims related to diagnoses and treatment of non-musculoskeletal
conditions. Chiropractic & Manual Therapies, 28(16), 1-8. doi:10.1186/s12998-
020-00305-w
Ji, J., Plakoyiannaki, E., Dimitratos, P., & Chen, S. (2019). The qualitative case research
in international entrepreneurship: A state of the art and analysis. International
Marketing Review, 36, 164-187. doi:10.1108/IMR-02-2017-0052
Jiang, J., Klein, G., & Fernandez, W. (2018). From project management to program
management: An invitation to investigate programs where IT plays a significant
role. Journal of the Association for Information Systems, 19(1), 40-57.
doi:10.17705/1jais.00480
Jiang, J. J., & Klein, G. (2014). Special section: IT project management. Journal of
Management Information Systems, 31(1), 13-16. doi:10.2753/MIS0742-
1222310101
Jing, S., Li, B., & Yao, R. (2018). Exploring the “black box” of thermal adaptation using
information entropy. Building and Environment, 146, 166-176.
doi:10.1016/j.buildenv.2018.09.038
108
Joslin, R., & Müller, R. (2016). The relationship between project governance and project
success. International Journal of Project Management, 34, 613-626.
doi:10.1016/j.ijproman.2016.01.008
Kallio, H., Pietila, A. M., & Johnson, M. (2016). Systematic methodological review:
Developing a framework for a qualitative semi-structured interview guide.
Journal of Advanced Nursing, 72, 2954-2965. doi:10.111/jan.13031
Kalu, F. A., & Bwalya, J. (2017). What makes qualitative research good research? An
exploratory analysis of critical elements. International Journal of Social Science
Research, 5(2), 43-56. doi:10.5296/ijssr.v5i2.10711
Kapustin, N. O., & Grushevenko, D. A. (2018). Exploring the implications of Russian
energy strategy project for oil refining sector. Energy Policy, 117, 198-207.
doi:10.1016/j.enpol.2018.03.005
Karabulut-Ilgu, A., Cherrez, N. J., & Jahren, C. T. (2017). A systematic review of
research on the flipped learning method in engineering education. British Journal
of Educational Technology, 49, 398-411. doi:10.1111/bjet.12548
Karadzhov, D., Yuan, Y., & Bond, L. (2019). Coping amidst an assemblage of
disadvantage: A qualitative metasynthesis of first-person accounts of managing
severe mental illness while homeless. Journal of Psychiatric and Mental Health
Nursing. 1-21. doi:10.1111.jpm.12524
Karpovsky, A., & Galliers, R. (2015). Aligning in practice: From current cases to a new
agenda. Journal of Information Technology, 30, 136-160. doi:10.1057/jit.2014.34
109
Karpowicz, M., Arabas, P., & Niewiadomska-Szynkiewicz, E. (2018). Design and
implementation of energy-aware application-specific CPU frequency governors
for the heterogeneous distributed computing systems. Future Generation
Computer Systems, 78, 302-315. doi:10.1016/j.future.2016.05.011
Khaparde, V. M., Somani, Y. R., & Malde, A. (2015). Role of information technology
and communication systems in implementing enterprise resource planning
systems in Indian industries. Global Journal of Enterprise Information Systems,
7(4), 18-22. doi:10.18311/gjeis/2015/6233
Khodyakov, D., Stockdale, S., Smith, N., Booth, M., Altman, L., & Rubenstein, L.
(2017). Patient engagement in the process of planning and designing outpatient
care improvements at the Veterans Administration health-care system: Findings
from an online expert panel. Health Expectations, 20, 130-145.
doi:10.1111/hex.12444
Killen, C. (2017). Managing portfolio interdependencies: The effects of visual data
representations on project portfolio decision making. International Journal of
Managing Projects in Business, 10, 856-879. doi:10.1108/IJMPB-01-2017-0003
King, J., O’Neill, B., Ramsay, P., Linden, M. A., Medniuk, A. D., Outtrim, J., &
Blackwood, B. (2019). Identifying patients’ support needs following critical
illness: A scoping review of the qualitative literature. Critical Care, 23(187), 1-
12. doi:10.1186/s13054-019-2441-6
Kneuper, R. (2017). Sixty years of software development life cycle models. IEEE Annals
of the History of Computing, 39(3), 41-54. doi:10.1109/MAHC.2017.3481346
110
Kocherla, S. (2012). Evaluating managerial styles for system development life-cycle
stages to ensure software project success (Doctoral Dissertation). ProQuest
Dissertations and Theses database. (UMI No. 3527308)
Kogan, L. R., & Schoenfeld-Tacher, R. M. (2018). Participation in an intergenerational
service learning course and implicit biases. Educational Gerontology, 44, 90-98.
doi:10.1080/03601277.2017.1413784
Kokolakis, S. (2017). Privacy attitudes and privacy behavior: A review of current
research on the privacy paradox phenomenon. Computers & Security, 64, 122-
134. doi:10.1016/j.cose.2015.07.002
Korytkowski, P. (2019). Competence-based estimation of activity duration in IT projects.
European Journal of Operational Research, 275, 708-720.
doi:10.1016/j.ejor.2018.11.061
Krajcik, V. (2013). Information system for the management of the processes. Accounting
and Management Information Systems, 12, 650-670. Retrieved from
http://econpapers.repec.org/article/amijournl/
Kuehn, S. (2016). Exploring U.S. Business Leaders’ Strategies for Enhancing Team
Communication. (Doctoral dissertation). Retrieved from
http://scholarworks.waldenu.edu/dissertations/2410/
Kumari, A. C., & Srinivas, K. (2016). Hyper-heuristic approach for multi-objective
software module clustering. Journal of Systems & Software, 117, 384-401.
doi:10.1016/j.jss.2016.04.007
111
Lai, C. Y., Hsu, J. S. C., & Li, Y. (2018). Leadership, regulatory focus and information
systems development project team performance. International Journal of Project
Management, 36, 566-582. doi:10.1016/j.ijproman.2017.11.001
Lancaster, K., Seear, K., Treloar, C., & Ritter, A. (2017). The productive techniques and
constitutive effects of “evidence-based policy” and “consumer participation”
discourses in health policy processes. Social Science & Medicine, 176, 60-68.
doi:10.1016/j.socsimed.2017.01.031
Langley, M. A. (2015). Capturing the Value of Project Management. PMIs Pulse of the
Profession. Retrieved from http://www.pmi.org/
Larson, D., & Chang, V. (2016). A review and future direction of agile, business
intelligence, analytics and data science. International Journal of Information
Management, 36, 700-710. doi:10.1016/j.ijinfomgt.2016.04.013
Lazard, L., & McAvoy, J. (2020). Doing reflexivity in psychological research: What’s the
point? What’s the practice? Qualitative Research in Psychology, 17(2), 159-177.
doi:10.1080/14780887.2017.1400144
Leedy, P. D., & Ormrod, J. E. (2013). Practical research: Planning and design (10th
ed.). Upper Saddle River, NJ: Pearson Education.
Longenecker, J. G., & Pringle, C. D. (1978). The illusion of contingency theory as a
general theory. Academy of Management Review, 3, 679-683.
doi:10.5465/AMR.1978.4305970
Lorenz, M., Ramsey, J., & Richey, R. G. (2018). Expatriates’ international opportunity
recognition and innovativeness: The role of metacognitive and cognitive cultural
112
intelligence. Journal of World Business, 53, 222-236.
doi:10.1016/j.jwb.2017.11.004
Luna, I., & Terra da Silva, M. (2015). Service intangibility and its implications for the
work coordination of primary healthcare multi-professional teams in Brazil.
Work, 52, 617-626. doi:10.3233/WOR-152195
Madsen, A. K. (2013). Virtual acts of balance: Virtual technologies of knowledge
management as co-produced by social intentions and technical limitations.
Electronic Journal of E-Government, 11(2), 183–197.
Retrieved from http://www.ejeg.com/main.html
Malone, T. W., & Crowston, K. (1990). What is coordination theory and how can it help
design cooperative work systems? Proceedings of the 1990 ACM Conference on
Computer-Supported Cooperative Work – CSCW, 90, 357-370.
doi:10.1145/99332.99367
Malone, T. W., & Crowston, K. (1994). The interdisciplinary study of coordination. ACM
Computing Surveys, 26(1), 87-119. doi:10.1145/174666/174668
Mamonov, S., & Koufaris, M. (2018). The effects of IT-related attributional style in
voluntary technology training. Information Systems Management, 35, 220-233.
doi:10.1080/10580530.2018.1477302
Mao, H., Liu, S., Zhang, J., & Deng, Z. (2016). Information technology resource,
knowledge management capability, and competitive advantage: The moderating
role of resource commitment. International Journal of Information Management,
36, 1062-1074. doi:10.1016/j.ijinfomgt.2016.07.001
113
March, J., & Simon, H. A. (1958). Organizations, Wiley, New York.
Marks, G., O’Connor, R. V., & Clarke, P. M. (2017). The impact of situational context on
the software development process – A case study of a highly innovative start-up
organization. Software Process Improvement and Capability Determination, 455-
466. doi:10.1007/978-3-319-67383-7_33
Marshall, C., & Rossman, G. B. (2016). Designing qualitative research (6th ed.).
Thousand Oaks, CA: Sage.
Martens, M., & Carvalho, M. M. (2017). Key factors of sustainability in project
management context: A survey exploring the project managers’ perspective.
International Journal of Project Management, 35, 1084-1102.
doi:10.1016/j.ijproman.2016.04.004
Marzagão, D. S. L., & Carvalho, M. (2016). Critical success factors for Six Sigma
projects. International Journal of Project Management, 34, 1505-1518.
doi:10.1016/j.ijproman.2016.08.005
Mauerhoefer, T., Strese, S., & Brettel, M. (2017). The impact of information technology
on new product development performance. Journal of Product Innovation
Management 34, 719-738. doi:10.1111/jpim.12408
McDonald, S. E., Collins, E. A., Maternick, A., Nicotera, N., Graham-Bermann, S.,
Ascione, F., & Williams, J. H. (2019). Intimate partner violence survivors’ report
of their children’s exposure to companion animal maltreatment: A qualitative
study. Journal of Interpersonal Violence, 34, 2627-2652.
doi:10.1177/0886260516689775
114
Merriam, S. B. (2014). Qualitative research: A guide to design and implementation. San
Francisco, CA: John Wiley & Sons.
Mittelstadt, B. D., Allo, P., Taddeo, M., Wachter, S., & Floridi, L. (2016). The ethics of
algorithms: Mapping the debate. Big Data & Society, 3(2), 1-21.
doi:10.1177/2053951716679679
Mohajan, H. K. (2018). Qualitative research methodology in social sciences and related
subjects. Journal of Economic Development, Environment and People, 7, 23-48.
doi:10.26458/jedep.v7i1.571
Momeni, K., & Martinsuo, M. (2019). Going downstream in a project-based firm:
Integration of distributors in the delivery of complex systems. International
Journal of Project Management, 37(1), 27-42.
doi:10.1016/j.ijproman.2018.09.007
Moustakas, C. (1994). Phenomenological research methods. London, New Delhi: Sage
Publications.
Müller, R., & Jugdev, K. (2012). Critical success factors in projects: Pinto, Slevin, and
Prescott – The elucidation of project success. International Journal of Managing
Projects in Business, 5, 757-775. doi:10.1108/17538371211269040
Murgatroyd, D., Lockwood, K., Garth, B., & Cameron, I. D. (2015). The perceptions and
experiences of people injured in motor vehicle crashes in a compensation scheme
setting: A qualitative study. BMC Public Health, 15, 1-10. doi:10.1186/s12889-
015-1739-9
115
National Commission for the Protection of Human Subjects in Biomedical and
Behavioral Research (1979). The Belmont report: Ethical principles and
guidelines for the protection of human subject’s research. Washington DC:
National Institutes of Health. Retrieved from
http://www.hhs.gov/ohrp/humansubjects/guidance/belmont.htm
Navimipour, N. J., & Charband, Y. (2016). Knowledge sharing mechanisms and
techniques in project teams: Literature review, classification, and current trends.
Computers in Human Behavior, 62, 730-742. doi:10.1016/j.chb.2016.05.003
Nelson, J. (2017). Using conceptual depth criteria: Addressing the challenge of reaching
saturation in qualitative research. Qualitative Research, 17, 554-570.
doi:1177/1468794116679873
Noble, H., & Smith, J. (2015). Issues of validity and reliability in qualitative research.
Evidence-Based Nursing, 18, 34-35. doi:10.1136/eb-2015-102054
Norlyk, A., Haahr, A., & Hall, E. (2016). Interviewing with or without the partner
present? An underexposed dilemma between ethics and methodology in nursing
research. Journal of Advanced Nursing, 72, 936-945. doi:10.1111/jan.12871
Novakovich, J., Miah, S., & Shaw, S. (2017). Designing curriculum to shape professional
social media skills and identity in virtual communities of practice. Computers &
Education, 104, 65-90. doi:10.1016/j.compedu.2016.11.002
Obradovic, V., Kostic, S. C., & Mitrovic, Z. (2016). Rethinking project management: Did
we miss marketing management? Procedia – Social and Behavior Sciences, 226,
390-397. doi:10.1016/j.sbspro.2016.06.203
116
Oliveira, E. C. B., Alencar, L. H., & Costa, A. S. (2018). Decision process of allocating
projects to project managers. Production Planning & Control, 29, 645-654.
doi:10.1080/09537287.2018.1432086.
Oltmann, S. (2016). Qualitative interviews: A methodological discussion of the
interviewer and respondent contexts. Forum: Qualitative Social Research, 17(2),
1-16. doi:10.17169/fqs-17.2.2551
Ose, S. O. (2016). Using Excel and Word to structure qualitative data. Journal of Applied
Social Science, 10, 147-162. doi:10.1177/1936724416664948
Overgaard, S. (2015). How to do things with brackets: The epoche explained. Continental
Philosophy Review, 48, 1-17. doi:10.1007/s11007-015-9322-8
Ozieranska, A., Kuchta, D., Skomra, A., & Rola, P. (2016). The critical factors of scrum
implementation in IT project: The case study. Journal of Economics &
Management, 25, 79-96. doi:10.22367/jem.2016.25.06
Papke-Shields, K., & Boyer-Wright, K. M. (2017). Strategic planning characteristics
applied to project management. International Journal of Project Management, 35,
169-179. doi:10.1016/j.ijproman.2016.10.015
Parameswar, N., Dhir, S., & Dhir, S. (2017). Banking on innovation. Innovation in
banking of ICICI bank. Global Business & Organizational Excellence, 36(2), 6-
16. doi:10.1002/joe.21765
Park, J., & Park, M. (2016). Qualitative versus quantitative research methods: Discovery
or justification? Journal of Marketing Thought, 3(1), 1-7.
doi:10.15577/jmt.2016.03.01.1
117
Parker, D. W., Dressel, U., Chevers, D., & Zeppetella, L. (2018). Agency theory
perspective on public-private-partnerships: International development project.
International Journal of Productivity and Performance Management, 67, 239-
259. doi:10.1108/IJPPM-09-2016-0191
Paskaleva, K., Evans, J., Martin, C., Linjordet, T., Yang, D., & Karvonen, A. (2017).
Data governance in the sustainable smart city. Informatics, 4(41), 1-19.
doi:10.3390/informatics4040041
Patanakul, P., Kwak, Y. H., Zwikael, O., & Liu, M. (2016). What impacts the
performance of large-scale government projects? International Journal of Project
Management, 34, 452-466. doi:10.1016/j.ijproman.2015.12.001
Paulus, T., Woods, M., Atkins, D. P., & Macklin, R. (2017). The discourse of QDAS:
Reporting practices of ATLAS.ti and NVivo users with implications for best
practices. International Journal of Social Research Methodology, 20, 35-47
doi:10.1080/13645579.2015.1102454
Petrova, E., Dewing, J., & Camilleri, M. (2016). Confidentiality in participatory research:
Challenges from one study. Nursing Ethics, 23, 442-454.
doi:10.1177/0969733014564909
Poonpool, N., Limsuwan, S., & Satchawatee, N. (2013). The effects of risk management
effectiveness on organizational sustainability of information technology
businesses. Review of Business Research, 13(1), 109–129. Retrieved from
http://www.iabe.org/
118
Portillo-Tarragona, P., Scarpellini, S., Moneva, J. M., Valero-Gil, J., & Aranda-Uson, A.
(2018). Classification and measurement of the firms’ resources and capabilities
applied to eco-innovation projects from a resource-based view perspective.
Sustainability, 10, 3161-3183. doi:10.3390/su10093161
Project Management Institute. (2017). A guide to the project management body of
knowledge: PMBOK® guide (5th ed.). Newtown Square, PA: Author.
Purkayastha, A., & Sharma, S. (2016). Gaining competitive advantage through the right
business model: Analysis based on case studies. Journal of Strategy and
Management, 9, 138-155. doi:10.1108/JSMA.0060
Qin, W., Guangping, Z., & Xuyan, T. (2017). Information technology project portfolio
implementation process optimization based on complex network theory and
entropy. Entropy, 19, 1-23. doi:10.3390/e19060287
Rashid, A., & Boussabiane, H. (2019). Conceptualizing the influence of personality and
cognitive traits on project managers’ risk-taking behaviour. International Journal
of Managing Projects in Business. Advanced online publication.
doi:10.1108/IJMPB-11-2017-0138
Rasnacis, A., & Berzisa, S. (2017). Method for adaptation and implementation of agile
project management methodology. Procedia Computer Science, 104, 43-50.
doi:10.1016/j.procs.2017.01.055
Rezvani, A., Chang, A., Wiewiora, A., Ashkanasy, N., Jordan, P., & Zolin, R. (2016).
Manager emotional intelligence and project success: The mediating role of job
119
satisfaction and trust. International Journal of Project Management, 34, 1112-
1122. doi:10.1016/j.ijproman.2016.05.012
Robson, M. (2016). An ethnographic study of the introduction of internal supervisors to
an internal coaching scheme. International Journal of Evidence Based Coaching
& Mentoring 14(2), 106-122. Retrieved from
https://radar.brookes.ac.uk/radar/items/b6bb9783-f20a-44f6-9e07-f9bd4437eb1/1/
Rodriguez, A., Ortega, F., & Concepcion, R. (2016). A method of the evaluation of risk
in IT projects. Expert Systems with Applications, 45, 273-285.
doi:10.1016/j.eswa.2015.09.056
Roulston, K., & Shelton, S. A. (2015). Reconceptualizing bias in teaching qualitative
research methods. Qualitative Inquiry, 21, 332-342.
doi:10.1177/107780041456803
Ruiz-Espiga, A. G., Severino, M. S., & Humero, A. (2018). Incidence in licensing
management activities in building project life cycle: A strategic matter of
knowledge. Journal of Modern Project Management, 6, 78-87. Retrieved from
http://journalmodernpm.com/index.php/jmpm/article/view/348
Runfola, A., Perna, A., Baraldi, E., & Gregori, G. L. (2017). The use of qualitative case
studies in top business and management journals: A quantitative analysis of recent
patterns. European Management Journal, 35, 116-127.
doi:10.1016/j.emj.2016.04.001
Saaty, T. L. (2008). Decision making for leaders: The analytic hierarchy process for
decisions in a complex world. Pittsburgh, Pennsylvania: RWS Publications.
120
Sabri, O., & Alfifi, F. (2017). Integrating knowledge life cycle within software
development process to produce a quality software product. 2017 International
Conference on Engineering and Technology (ICET), 1-17.
doi:10.1109/ICEngTechnol.2017.8308172
Saghir, A., & Abdullahi, A. M. (2017). Leadership and project success in development
sector. Journal of Economics & Management, 30, 5-19.
doi:10.22367/jem.2017.30.01
Sanabria, O. (2014). Forecast inaccuracies in power plant projects from project
managers’ perspectives (Doctoral study). ProQuest Dissertations and Theses
database. (UMI No. 3628919)
Sanchez, O. P., Terlizzi, M. A., & de Moraes, H. R. de O. (2017). Cost and time project
management success factors for information systems development projects.
International Journal of Project Management, 35, 1608-1626.
doi:10.1016/j.ijproman.2017.09.007
Sanchez-Morcilio, R., & Quiles-Torres, F. (2016). Trends in information technology
project management. Issues in Information Systems, 17, 187-198. Retrieved from
https://iacis.org/iis/
Sanders, J. J., Robinson, M. T., & Block, S. D. (2016). Factors impacting advance care
planning among African Americans: Results of a systematic integrated review.
Journal of Palliative Medicine, 19, 202-227. doi:10.1089/jpm.2015.0325
Sanders, P. (1982). Phenomenology: A new way of viewing organizational research.
Academy of Management Review, 7, 353-360. doi:0.5465/AMR.1982.4285315
121
Santos, J. N., & Baptista, C. S. (2016). Information exchange within horizontal
relationships: A fuzzy-set approach to companies’ characteristics role. Journal of
Business Research, 69, 5255-5260. doi:10.1016/j.jbusres.2016.04.121
Saunders, M., Lewis, P., & Thornhill, A. (2015). Research methods for business students.
5th ed. Upper Saddle River, NJ: Pearson.
Saunders, M., & Townsend, K. (2016). Reporting and justifying the number of interview
participants in organization and workplace research. British Journal of
Management, 27, 836-852. doi:1111/1467-8551.12182
Schary, D. P., & Cardinal, B. J. (2016). Starting to uncover the mystery of
interdisciplinary research in Kinesiology. Physical Educator, 73, 213-229.
doi:10.18666/TPE-2106-v73-I2-6184
Shek, D. T. L., Wu, F. K. Y., & Chai, W. Y. (2017). Students’ views on general
education: Insights gained from the narratives of Chinese students in Hong Kong.
International Journal of Disability and Human Development, 16, 443-450.
doi:10.1515/ijdhd-2017-7013
Shishodia, A., Dixit, V., & Verma, P. (2018). Project risk analysis based on project
characteristics. Benchmarking: An International Journal, 25, 893-918.
doi:10.1108/BIJ-06-2017-0151
Shrivastava, S. V., & Rathod, U. (2017). A risk management framework for distributed
agile projects. Information & Software Technology, 85, 1-15.
doi:10.1016/j.infsof.2016.12.005
122
Singh, C. D., & Khamba, J. S. (2016). Structural equation modeling for manufacturing
competency and strategic success factors. International Journal of Engineering
Research in Africa, 19, 138-155. doi:10.4028/JERA.19.138
Slepian, J. L. (2013). Cross-functional teams and organizational learning: A model and
cases from telecommunications operating companies. International Journal of
Innovation and Technology Management, 10(1), 1-29.
doi:10.1142/S0219877013500053
Stieglitz, S., Mirbabaie, M., Ross, B., & Neuberger, C. (2018). Social media analytics:
Challenges in topic discovery, data collection, and data preparation. International
Journal of Information Management, 39, 156-168.
doi:10.1016/j.ijinfomgt.2017.12.002
Stingl, V., & Geraldi, J. (2017). Errors, lies and misunderstandings: Systematic review on
behavioural decision making in projects. International Journal of Project
Management, 35, 121-135. doi:10.1016/j.ijproman.2016.10.009
Stoica, M., Ghilic-Micu, B., Mircea, M., & Uscatu, C. (2016). Analyzing agile
development – from Waterfall style to Scrumban. Informatica Economica, 20(4),
5-14. doi:12948/issn14531305/20.4.2016.01
Tan, Y., Xue, B., & Cheung, Y. T. (2017). Relationships between main contractors and
subcontractors and their impacts on main contractor competitiveness: An
empirical study in Hong Kong. Journal of Construction Engineering and
Management, 143. doi:10.1061/(ASCE)/CO.1943-7862.0001311
123
Terlizzi, M. A., de Souza, F., & de Moraes, H. R. O. (2016). Barriers to the use of an IT
project management methodology in a large financial institution. International
Journal of Project Management, 34, 467-479.
doi:10.1016/j.ijproman.2015.12.005
Thalmann, S., Bachlechner, D., Demetz, L., & Manhart, M. (2014). Complexity is dead,
long live complexity! How software can help service providers manage security
and compliance. Computers & Security, 45, 172-185.
doi:10.1016/j.cose.2014.05.012
Thatcher, J. B., Wright, R. T., Heshan, S., Zagenczyk, T. J., & Klein, R. (2018).
Mindfulness in information technology use: Definitions, distinctions, and a new
measure. MIS Quarterly, 42, 831-847. doi:10.25300/MISQ/2018/11881
Thomas, S. (2015). Exploring strategies for retaining information technology
professionals: A case study (Doctoral dissertation). ProQuest Dissertations and
Theses database. (UMI No. 3681815)
Thorpe, R., Hawkes, G., Dune, T., Fileborn, B., Pitts, M., & Minichiello, V. (2018).
Hidden boundaries and shared meanings: The roles of researcher characteristics
and cultural norms in shaping understandings of sexuality in the unstructured
interview setting. International Journal of Social Research Methodology, 21, 205-
217. doi:10.1080/13645579.2017.1350016
Tilk, D. (2016). 5 steps to agile project success. Internal Auditor, 73(2), 57-61. Retrieved
from https://na.theiia.org/periodicals/pages/internal-auditor-magazine.aspx
124
Torp, O., & Klakegg, O. J. (2016). Challenges in cost estimation under uncertainty: A
case study of the decommissioning of Barsebäck nuclear power plant.
Administrative Sciences, 6(14), 1-21. doi:10.3390/admsci6040014
van Marrewijk, A., Ybema, S., Smits, K., Clegg, S., & Pitsis, T. (2016). Clash of the
titans: Temporal organizing and collaborative dynamics in the Panama Canal
megaproject. Organization Studies, 37, 1745-1769.
doi:10.1177/0170840616655489
VanVactor, J. (2015). Healthcare succession management: Are we ready? International
Journal of Public Leadership, 11, 107-122. doi:10.1108/IJPL-11-2014-0021
Varpio, L., Ajjawi, R., Monrouxe, L. V., O’Brien, B. C., & Rees, C. E. (2017). Shedding
the cobra effect: Problematising thematic emergence triangulation, saturation and
member checking. Medical Education, 51, 40-50. doi:10.1111.medu.13124
Vasumanthy, C., & Mohan, J. B. (2013). Application of knowledge management in
systems development life-cycle. International Journal of Management Research
and Review, 3, 2759-2764. Retrieved from http://www.ijmrr.com
Venkatesh, V., Brown, S. A., & Sullivan, Y. (2016). Guidelines for conducting mixed-
methods research: An extension and illustration. Journal of the Association for
Information Systems, 17, 436-494. doi:10.17705/1jais.00433
Vernon-Dotson, L. J. (2013). A review of “doing case study research: A practical guide
for beginning researchers.” Journal of Educational Research, 106, 250.
doi:10.1080/00220671.2012.750135
125
Vidgen, R., Shaw, S., & Grant, D. (2017). Management challenges in creating value from
business analytics. European Journal of Operational Research, 261, 626-639.
doi:10.1016/j.ejor.2017.02.023
Walters, W. (2016). Beyond use statistics: Recall, precision, and relevance in the
assessment and management of academic libraries. Journal of Librarianship and
Information Science, 48, 340-352. doi:10.1177/0961000615572174
Wamba, S. F., Gunasekaran, A., Akter, S., Ren, S. J. F., Dubey, R., & Childe, S. (2017).
Big data analytics and firm performance: Effects of dynamic capabilities. Journal
of Business Research, 70, 356-365. doi:10.1016/j.jbusres.2016.08.009
Wang, Y., Han, Q., de Vries, B., & Zuo, J. (2016). How the public reacts to social
impacts in construction projects? A structural equation modeling study.
International Journal of Project Management, 34, 1433-1448.
doi:10.1016/j.ijproman.2016.07.008
Wehner, B., Ritter, C., & Leist, S. (2017). Enterprise social networks: A literature review
and research agenda. Computer Networks, 114, 125-142.
doi:10.1016/j.comnet.2016.09.001
Williams, T. (2016). Identifying success factors in construction projects: A case study.
Project Management Journal, 47(1), 97-112. doi:10.1002/pmj.21558
Wilson, A. D., Onwuegbuzie, A. J., & Manning, L. P. (2016). Using paired depth
interviews to collect qualitative data. Qualitative Report, 21, 1549-1573.
Retrieved from https://nsuworks.nova.edu/tqr/vol21/iss9/1
126
Wilson, E., Kenny, A., & Dickson-Swift, V. (2018). Ethical challenges in community-
based participatory research: A scoping review. Qualitative Health Research, 28,
189-199. doi:10.1177/1049732317690721
Wilson, P., Valera, P., Martos, A., Wittlin, N., Munoz-Laboy, M. A., & Parker, R. G.
(2016). Contributions of qualitative research in informing HIV/AIDS
interventions targeting black MSM in the United States. The Journal of Sex
Research, 53, 642-654. doi:10.1080/00224499.2015.1016139
Winch, G., & Leiringer, R. (2016). Owner project capabilities for infrastructure
development: A review and development of the “strong owner” concept.
International Journal of Project Management, 34, 271-281.
doi:10.1016/j.ijproman.2015.02.002
Windapo, A. O., Oyewobi, L., & Zwane, Z. (2014). Investigation of stakeholders’
awareness and adoption of inherently safer design (ISD) principles in South
African utility industry projects. Journal of Loss Prevention in the Process
Industries, 32, 152-160. doi:10.1016/j.jlp.2014.08.006
Worren, N. (2017). The matrix as a transitory form: The evolution of FMC technologies.
Journal of Organization Design, 6(13), 1-14. doi:10.1186/s41469-017-0023-0
Wysocki, R. K. (2014). Effective project management: Traditional, agile, extreme (7th
ed.). Indianapolis, IN: John Wiley & Sons.
Xia, H., Dawande, M., & Mookerjee, V. (2016). Optimal coordination in distributed
software development. Production & Operations Management, 25, 56-76.
doi:10.1111/poms.12408
127
Yalegama, S., Chileshe, N., & Ma, T. (2016). Critical success factors for community-
driven development projects. A Sri Lankan community perspective. International
Journal of Project Management, 34, 643-659.
doi:10.1016/j.ijproman.2016.02.006
Yin, R. K. (2017). Case study research design and methods. Thousand Oaks, California:
Sage Publications.
Zhang, Y., & Zuo, F. (2016). Selection of risk response actions considering risk
dependency. Kybernetes, 45, 1652-1667. doi:10.1108/K-05-2016-0096
Zickert, F., & Beck, R. (2012). Coping with existing systems in information systems
development. IEEE Transactions on Software Engineering, 38, 1027-1039.
doi:10.1109/TSE.2011.89
Zou, Y., Kiviniemi, A., & Jones, S. (2016). Developing a tailored RBS linking to BIM
for risk management of bridge projects. Engineering, Construction and
Architectural Management, 23, 727-750. doi:10.1108/ECAM-01-2016-0009
Zuofa, T., & Ochieng, E. G. (2017). Working separately but together: Appraising virtual
project team challenges. Team Performance Management, 23, 227-242.
doi:10.1108/TPM-06-2016-0030
Students also viewed