Solve the parts given in the question using six sigma mini tab tools.
MSE 618- Six Sigma Quality Engineering
Homework # 2 (10 points)
You work for a company that manufactures aluminum rods in the machine shop. The aluminum rods must be 601 mm +/-4 mm long to meet customer’s specifications. There has been a chronic problem with rods length being out of specifications causing high scrap and rework rates.
For a month, data was collected on the length of 30 aluminum rods in the machine shop. Also, three suppliers A, B and C that manufacture the same part, collected data on 30 aluminum rods at their own facilities (see data below).
Machine Shop | Supplier A | Supplier B | Supplier C |
599 | 602.1 | 601 | 603 |
600 | 604.0 | 600.1 | 601 |
609 | 603.7 | 605.9 | 601 |
603 | 606.4 | 602.8 | 600 |
600 | 605.7 | 604 | 605 |
601.3 | 605.3 | 604 | 604 |
601.2 | 603.2 | 602 | 603 |
600.5 | 606.9 | 600 | 602 |
601.6 | 605.5 | 602.2 | 602 |
603 | 603.7 | 603.1 | 599 |
598.1 | 604.6 | 600.2 | 606 |
603 | 603.3 | 604 | 600 |
602.1 | 606.9 | 599.9 | 601 |
604 | 605.9 | 600 | 603 |
577.6 | 603.1 | 603 | 600 |
607 | 607.7 | 601.4 | 605 |
602 | 603.3 | 602.5 | 604 |
603 | 605.3 | 603.7 | 604 |
601.5 | 604.1 | 603.9 | 602 |
604.6 | 603.8 | 602 | 600 |
601.1 | 602.5 | 600 | 599 |
602.5 | 606.9 | 607 | 600 |
603.1 | 607.8 | 609 | 601 |
600 | 605.9 | 608 | 602 |
604.1 | 604.5 | 606.3 | 603 |
591.7 | 603.1 | 605.7 | 603 |
589.1 | 606.1 | 601.1 | 607 |
605.3 | 602.6 | 606 | 601 |
600.9 | 604.1 | 602 | 603 |
598.0 | 603.4 | 605 | 604 |
Question:
Should the company continue producing aluminum rods or buy parts from outside suppliers? You have been asked to lead a problem-solving team and recommend a solution. Hint:
You must run the following analysis, study results and make a recommendation:
· Run a normality test for the machine shop and each supplier A, B and C data set
· Perform a Process Capability Analysis for the machine shop, supplier A, B, and C
· Approximate Sigma level for the machine shop, supplier A, B and C (Use
Cpks)
· Calculate Cp to determine how much the machine shop and each supplier (A, B and C) sample is consuming out of the spec.
· Scrap cost for the machine shop and each supplier A, B and C (Use Taguchi analysis)
|
· Run ¯¯ and R chart for the machine shop, supplier A, B, and C
12 years ago
20
Purchase the answer to view it

- fwd08611sigmaminitab.zip
- BIO Paper
- Accounting Homework
- PHSX 237_01 Mid-term Exam 2014
- No plagiarized work - well written paragraphs
- Write an essay reviewing the Cold War era and the threats to American families. Include what you would do to protect your family in case of an attack.
- can you have this done by tommorw
- 0
- Biology related question. How would you get rid of the mice based on information given?
- PSYCH/625 PSYCH 625 Weeks 1-6 Learning Team Assignment - Real Estate Data Analysis - A+& Original Guaranteed!
- The WHO