Engineering Excel
Given: Barrel circular Area = 4.60 ft2, flow rate of water into the barrel = 36.8 lb / sec, flow rate of water from the leak in the bottom of the barrel = 9.2*h lb/sec (9.2 is the ‘leak rate coefficient C’), water density = 62.4 lb / ft3.
Exit flow rate is a function of water level.
Find : ( 15 pts) Define the five (5) constant variables of Area, Flow in, Coefficient for flow out, density of water,
and appropriate time step size in seconds as shown in class and as done in Excel Assignment 02.
The time step size should be at least 2.0 seconds, but not more than 10.0 seconds. NOT I DONT NEED WORDS DEFINITION FOR THIS QUESTION EVERTHING SHOULD BE BY NUMBERS AND EQUETION.
( 5 pts) Calculate the coefficients C1 and C2 to be used in the solution to the differential equation.
( 5 pts) Calculate the “Time Constant” tau = τ
( 5 pts) Column tabulation of times beginning with time = 0.0 seconds
(20 pts) Column tabulation of water level in the barrel using the time-step simulation or approximations.
(15 pts) Column tabulation of water level in the barrel using the theoretical solution to the governing equation.
(10 pts) Column tabulation of percent error between simulation and theoretical.
( 5 pts) The maximum water level in the Barrel. Explicitly articulate this as you did with the Optimum Angle.
(20 pts) Titled and Labeled Graph showing Simulation (as a Dotted Line), Theoretical (as a Solid Line),
and Percent Error (as any line).
Solution:
The Theoretical Water Level or height is : h(t) = [ C2 / C1 ] * [ 1.0 – exp (- C1*t ) ]
:
OR h(t) = [ C2 / C1 ] * [ 1.0 – exp (-t / τ ) ]
Where
C1 = Leak Coeff. / density / Area and C2 = Flow rate in / density / Area
Include your name on the actual spreadsheet also.
Everyone does his/her own assignment; this is not like a lab. Ask questions during class or send an e-mail titled “Question about Excel 03 Assignment”. Let me know if the points do not sum to 100 pts.
Submit results to me as a spreadsheet file; this worked very well for previous Excel assignments. Send an e-mail with the Excel file attached and Excel 03 in the subject of the e-mail. All files are due by Monday, November 25, 2013 11:00pm. But do not send the e-mail before 6:00pm; this will keep all the e-mails together in my file. They will arrive in one nice batch. That means send the e-mail to me after 6;00pm and before 11;00pm.
13 years ago 10
Purchase the answer to view it
- dsc_0118.jpg
- dsc_0120.jpg
- excel_assignment.docx
- excel_assignment.xlsx
- Discussion Question
- Meet Mark. The mothers in both Pride and Prejudice and Bridget Jones’s Diary very much want their daughters to be...
- Part A: The first step toward your final assignment is to write a brief essay on sports and what sociology offers, as a way to understand it from a human experience. Part B: Find at least 2 outside sources on the sociology of sports, and present a brief d
- Within the Discussion Board area, write 400–600 words that respond to the following questions with your thoughts, ideas, and comments. This will be the foundation for future discussions by your classmates. Be substantive and clear, and use examples to rei
- On pages 345-6 and 353 of Elementary and Intermediate Algebra, there are many factoring problems. You will find your assignment in the following table.
- Title: you create the topic HI there, I need a well done essay with a perfect grammar. Here is somethings I would like you to know before you start doing the essay: 1-I need you to create a title. 2-Don't use a formal words. 3-The essay need to be a good
- finance help needed
- 6-1 Macroeconomics Instructor: Jen Dinsmore Hanson Homework Assignment Chapter 6 Multiple Choice Questions 1. A business firm with limited liability would be a A. proprietorship. B....
- A wooden box weighing 245 N is pushed across the floor by a workman who exerts a horizontal force of...
- k1/10 so how do I get all the symbols I need to post a problem?