Consider the following project activities:
Activity Duration (Days) Predecessors
A 3 None
B 2 None
C 6 A
D 1.5 A,B
E 2.5 C,D
F 3.5 D
G 4 E,F
Draw the project network diagram, identify all the paths through the network and their strengths, and identify all the critical activities and path(s). How long will the entire project take?