COMPANY
Disaster Recovery Plan (DRP) for [PRODUCT]
(Note: this DRP document is somewhat specific to SharePoint, but can be adapted for other products/technologies as
needed)
Plan and related Business Processes
Business Process Feature Relevant Technical Components
December 29, 2014
Table of Contents
1. Purpose and Objective ............................................................................................................................................ 3
Scope ............................................................................................................................................................................ 3
2. Dependencies .......................................................................................................................................................... 3
3. Disaster Recovery Strategies ................................................................................................................................... 5
4. Disaster Recovery Procedures ................................................................................................................................ 5
Response Phase ............................................................................................................................................................ 5
Resumption Phase ........................................................................................................................................................ 6
Data Center Recovery ............................................................................................................................................... 6
Internal or External Dependency Recovery .............................................................................................................. 8
Significant Network or Other Issue Recovery (Defined by quality of service guidelines) ........................................ 8
Restoration Phase ........................................................................................................................................................ 9
Data Center Recovery ............................................................................................................................................... 9
Internal or External Dependency Recovery ............................................................................................................ 10
Significant Network or Other Issue Recovery (Defined by quality of service guidelines) ...................................... 10
Appendix A: Disaster Recovery Contacts - Admin Contact List ..................................................................................... 12
Appendix B: Document Maintenance Responsibilities and Revision History ............................................................... 12
Appendix C: Server Farm Details ................................................................................................................................... 12
Appendix D: Glossary/Terms ......................................................................................................................................... 12
1. Purpose and Objective
COMPANY developed this disaster recovery plan (DRP) to be used in the event of a significant disruption to the features listed in the table above. The goal of this plan is to outline the key recovery steps to be performed during and after a disruption to return to normal operations as soon as possible.
Scope
The scope of this DRP document addresses technical recovery only in the event of a significant disruption. The intent of the DRP is to be used in conjunction with the business continuity plan (BCP) COMPANY has. A DRP is a subset of the overall recovery process contained in the BCP. Plans for the recovery of people, infrastructure, and internal and external dependencies not directly relevant to the technical recovery outlined herein are included in the Business Continuity Plan and/or the Corporate Incident Response and Incident Management plans COMPANY has in place. The link to the specific BCP document related to this DRP can be found here: LINK TO BCP This disaster recovery plan provides:
- Guidelines for determining plan activation; - Technical response flow and recovery strategy; - Guidelines for recovery procedures; - References to key Business Resumption Plans and technical dependencies; - Rollback procedures that will be implemented to return to standard operating state; - Checklists outlining considerations for escalation, incident management, and plan activation.
The specific objectives of this disaster recovery plan are to:
- Immediately mobilize a core group of leaders to assess the technical ramifications of a situation; - Set technical priorities for the recovery team during the recovery period; - Minimize the impact of the disruption to the impacted features and business groups; - Stage the restoration of operations to full processing capabilities; - Enable rollback operations once the disruption has been resolved if determined appropriate by the recovery
team. Within the recovery procedures there are significant dependencies between and supporting technical groups within and outside COMPANY. This plan is designed to identify the steps that are expected to take to coordinate with other groups / vendors to enable their own recovery. This plan is not intended to outline all the steps or recovery procedures that other departments need to take in the event of a disruption, or in the recovery from a disruption.
2. Dependencies
This section outlines the dependencies made during the development of this SharePoint disaster recovery plan. If and when needed the DR TEAM will coordinate with their partner groups as needed to enable recovery.
Dependency Assumptions
User Interface / Rendering Presentation components
Users (end users, power users, administrators) are unable to access the system through any part of the instance (e.g. client or server side, web interface or downloaded application).
Infrastructure and back-end services are still assumed to be active/running.
Business Intelligence / Reporting Processing components
The collection, logging, filtering, and delivery of reported information to end users is not functioning (with or without the user interface layer also being impacted).
Standard backup processes (e.g. tape backups) are not impacted, but the active / passive or mirrored processes are not functioning.
Specific types of disruptions could include components that process, match and transforms information from the other layers. This includes business transaction processing, report processing and data parsing.
Network Layers Infrastructure components
Connectivity to network resources is compromised and/or significant latency issues in the network exist that result in lowered performance in other layers.
Assumption is that terminal connections, serially attached devices and inputs are still functional.
Storage Layer Infrastructure components
Loss of SAN, local area storage, or other storage component.
Database Layer Database storage components
Data within the data stores is compromised and is either inaccessible, corrupt, or unavailable
Hardware/Host Layer Hardware components
Physical components are unavailable or affected by a given event
Virtualizations (VM's) Virtual Layer
Virtual components are unavailable
Hardware and hosting services are accessible
Administration Infrastructure Layer
Support functions are disabled such as management services, backup services, and log transfer functions.
Other services are presumed functional
Internal/External Dependencies
Interfaces and intersystem communications corrupt or compromised
In addition assumptions within the Business Continuity Plan for this work stream still apply.
3. Disaster Recovery Strategies
The overall DR strategy of xyz is summarized in the table below and documented in more detail in the supporting sections. These scenarios and strategies are consistent across the technical layers (user interface, reporting, etc.)
4. Disaster Recovery Procedures
A disaster recovery event can be broken out into three phases, the response, the resumption, and the restoration. These phases are also managed in parallel with any corresponding business continuity recovery procedures summarized in the business continuity plan.
Response Phase
The following are the activities, parties and items necessary for a DR response in this phase. Please note these procedures are the same regardless of the triggering event (e.g. whether caused by a Data Center disruption or other scenario).
Data Center Disruption
Failover to alternate Data Center
Reroute core processes to another Data Center (without full failover)
Operate at a deprecated service level
Take no action
Significant Dependency (Internal or External)
Disruption
Reroute core functions to backup / alternate provider
Participate in recovery strategies as available
Wait for the restoration of service, provide communication as needed
to stakeholders
Significant network or other issues
Reroute operations to backup processing unit / service (load
balancing, caching)
Wait for service to be restored, communicate with core stakholders as needed
•On call personnel paged
•Decision made around recovery strategies to be taken
•Full recovery team identified
Response Phase: The immediate actions following a significant event.
•Recovery procedures implemented
•Coordination with other departments executed as needed
Resumption Phase: Activities necessary to resume services after team has been notified.
•Rollback procedures implemented
•Operations restored
Restoration Phase: Tasks taken to restore service to previous levels.
Response Phase Recovery Procedures – All DR Event Scenarios
Step Owner Duration Components
Identify issue, page on call / Designated Responsible Individual (DR TEAM)
DR TEAM x minutes Issue communicated / escalated
Priority set
Identify the team members needed for recovery
DR TEAM x minutes Selection of core team members required for restoration phase from among the following groups:
Operations
Establish a conference line for a bridge call to coordinate next steps
DR TEAM or Ops
x minutes Primary bridge line: NUMBER Secondary bridge line: NUMBER Alternate / backup communication tools: email, communicator
Communicate the specific recovery roles and determine which recovery strategy will be pursued.
DR TEAM x minutes Documentation / tracking of timelines and next decisions
Creation of disaster recovery event command center / “war room” as needed
This information is also summarized by feature in Appendix A: Disaster Recovery Contacts - Admin Contact List.
Resumption Phase
During the resumption phase, the steps taken to enable recovery will vary based on the type of issue. The procedures for each recovery scenario are summarized below.
Data Center Recovery
Full Data Center Failover
Step Owner Duration Components
Initiate Failover DR TEAM TBD Restoration procedures identified
Risks assessed for each procedure
Coordination points between groups defined
Issue communication process and triage efforts established
Complete Failover DR TEAM TBD Recovery steps executed, including handoffs between key dependencies
Test Recovery DR TEAM TBD Tests assigned and performed
Results summarized and communicated to group
Failover deemed successful DR TEAM TBD
Below is a sample timeline for recovery actions associated with the failover the technical components between different data centers to provide geo-redundant operations. Coordination of recovery actions is crucial. A timeline is necessary in order to manage recovery between different groups and layers.
Sample Recovery Timeline
Event Instantiation Recovery Complete Failback Ends
< F
u n
c ti o
n >
In te
rn a
l
D e
p e
n d
e n
c ie
s
E x te
rn a
l
D e
p e
n d
e n
c ie
s D
B L
a y e
r G
F S
/N e
tw o
rk
L a
y e
r O
p e
ra ti o
n s
Detect/Report
Event
Redirect Traffic to
Alternate Data
Center
Failover Database
to Alternate Data
Center
Redirect Internal
Interfaces to
Failover DB
Redirect External
Interfaces to
Failover DB
Failover UI layer to
backup services
and redirect to
failover DB
Rebuild Primary
DB
Redirect Internal
Interfaces to
Rebuilt Primary
DB
Redirect External
Interfaces to
Rebuilt Primary
DB
Failback UI Layer
to Rebuilt Primary
DB
Redirect traffic to
rebuilt DB and
servers
Failback BeginsT+ 15 T+30 T+45 T+30T+ 15 T+45
Reroute critical processes to alternate Data Center
Step Owner Duration Components
Operate at deprecated service level – prioritize critical feeds
Step Owner Duration Components
Take no action – monitor for Data Center recovery
This recovery procedure would only be the chosen alternative in the event no other options were available to (e.g. the cause and recovery of the Data Center is fully in the control of another department or vendor).
Step Owner Duration Components
Track communication and status with the core recovery team.
DR TEAM As needed
Send out frequent updates to core stakeholders with the status.
DR TEAM As needed
Internal or External Dependency Recovery
Reroute operations to backup provider
Step Owner Duration Components
Execute available recovery procedures
Step Owner Duration Components
Inform other teams about technical dependencies
DR TEAM As needed
DR TEAM As needed
Take no action – monitor status
This recovery procedure would only be the chosen alternative in the event no other options were available to (e.g. the cause and recovery of the disruption is fully in the control of another department or vendor).
Step Owner Duration Components
Track communication and status with the core recovery team.
DR TEAM As needed Provide feedback about SharePoint service availability
Send out frequent updates to core stakeholders with the status.
DR TEAM As needed
Significant Network or Other Issue Recovery (Defined by quality of service guidelines)
Reroute operations to backup provider
Step Owner Duration Components
Execute available recovery procedures
Step Owner Duration Components
Inform other teams about technical dependencies
DR TEAM As needed Hardware (CPU, Memory, Hard disk, Network requirements)
teams DR TEAM As needed
DR TEAM As needed
Take no action – monitor status
This recovery procedure would only be the chosen alternative in the event no other options were available to (e.g. the cause and recovery of the internal or external dependency is fully in the control of another department or vendor).
Step Owner Duration Components
Track communication and status with the core recovery team.
DR TEAM As needed Provide feedback about SharePoint service availability
Send out frequent updates to core stakeholders with the status.
DR TEAM As needed
Restoration Phase
During the restoration phase, the steps taken to enable recovery will vary based on the type of issue. The procedures for each recovery scenario are summarized below.
Data Center Recovery
Full Data Center Restoration
Step Owner Duration Components
Determine whether failback to original Data Center will be pursued
DR TEAM TBD Restoration procedures determined
Original data center restored DR TEAM TBD Server Farm level recovery
Complete Failback DR Team TBD Failback steps executed, including handoffs between key dependencies
Test Failback DR Team TBD Tests assigned and performed
Results summarized and communicated to group
Issues (if any) communicated to group
Determine whether failback was successful
DR TEAM TBD Declaration of successful failback and communication to stakeholder group.
Disaster recovery procedures closed.
Results summarized, post mortem performed, and DRP updated (as needed).
The following section contains steps for the restoration procedures.
Full Server Farm Recovery
This section describes the process for recovering from a farm-level failure, for a: three-tier server farm consisting of a database server, an application server that provides Index, Query, InfoPath Forms Services and Excel Calculation Services, and two front-end Web servers that service search queries and provide Web content.
Front-End Web Servers
(Queries, Content)
Application Server
(Excel Calculation
Services, Indexing
Services
Dedicated SQL Server
The following diagram describes the recovery process for a farm.
Overview of a farm-level recovery
Add Farm restore steps
Internal or External Dependency Recovery
Execute available recovery procedures
Step Owner Duration Components
DR TEAM As needed
DR TEAM As needed
Take no action – monitor status
This recovery procedure would only be the chosen alternative in the event no other options were available to (e.g. the cause and recovery of the disruption is fully in the control of another department or vendor).
Step Owner Duration Components
Track communication and status with the core recovery team.
DR TEAM As needed Provide feedback about SharePoint service availability
Send out frequent updates to core stakeholders with the status.
DR TEAM As needed
Significant Network or Other Issue Recovery (Defined by quality of service guidelines)
Full Farm Recovery Process
Prepare servers and install Prepare to restore Restore backups A
p p li c a ti o n S
e rv
e r
F ro
n t-
E n d W
e b
S e rv
e r
S Q
L S
e rv
e r
1. Install Operating System and patches Install SQL Server and patches
2. Install Operating System and patches Install Office SharePoint Server (type: Complete) Run SharePoint Products and Technologies Wizard to create Central Administration site, Configuration database
3. Install Operating System and patches Install IIS, ASP.NET, and the .NET framework 3.0 Install Office SharePoint Server (type: front-end Web)
7a. Restore Office SharePoint Server or SQL Server backups, highest priority first.
4. Start Search services 5. Recreate Web applications
10. Reconfigure IIS settings
7b. Restore Office SharePoint Server backups for Search, other applications, highest priority first.
Redeploy customizations
6. Run SharePoint Products and Technologies Wizard
9. Optional. Set one or more front-end Web servers to serve queries
11. Optional. Reconfigure alternate access mappings
12. Restart timer jobs.
13. (Optional) Redeploy solutions and reactivate features or restore 12 hive files
Execute available recovery procedures
Step Owner Duration Components
DR TEAM As needed
Take no action – monitor status
This recovery procedure would only be the chosen alternative in the event no other options were available to (e.g. the cause and recovery of the internal or external dependency is fully in the control of another department or vendor).
Step Owner Duration Components
Track communication and status with the core recovery team.
DR TEAM As needed
Send out frequent updates to core stakeholders with the status.
DR TEAM As needed
Appendix A: Disaster Recovery Contacts - Admin Contact List
The critical team members who would be involved in recovery procedures for feature sets are summarized below.
Feature Name Contact Lists
For the key internal and external dependencies identified, the following are the primary contacts.
Dependency Name Contact Information
In addition the key BCP individuals are:
Appendix B: Document Maintenance Responsibilities and Revision History
This section identifies the individuals and their roles and responsibilities for maintaining this Disaster Recovery Plan.
Primary Disaster Recovery Plan document owner is: Primary Designee:
Alternate Designee: [NAME]
Name of Person Updating Document
Date Update Description Version # Approved By
Appendix C: Server Farm Details
Farm Configuration (status as of date)
Table
Appendix D: Glossary/Terms
Standard Operating State: Production state where services are functioning at standard state levels. In contrast to recovery state operating levels, this can support business functions at minimum but deprecated levels. Presentation Layer: Layer which users interact with. This typically encompasses systems that support the UI, manage rendering, and captures user interactions. User responses are parsed and system requests are passed for processing and data retrieval to the appropriate layer. Processing Layer: System layer which processes and synthesizes user input, data output, and transactional operations within an application stack. Typically this layer processes data from the other layers. Typically these services are folded into the presentation and database layer, however for intensive applications; this is usually broken out into its own layer. Database Layer: The database layer is where data typically resides in an application stack. Typically data is stored in a relational database such as SQL Server, Microsoft Access, or Oracle, but it can be stored as XML, raw data, or tables. This layer typically is optimized for data querying, processing and retrieval. Network Layer: The network layer is responsible for directing and managing traffic between physical hosts. It is typically an infrastructure layer and is usually outside the purview of most business units. This layer usually supports load balancing, geo-redundancy, and clustering. Storage Layer: This is typically an infrastructure layer and provides data storage and access. In most environments this is usually regarded as SAN or NAS storage. Hardware/Host Layer: This layer refers to the physical machines that all other layers are reliant upon. Depending on the organization, management of the physical layer can be performed by the stack owner or the purview of an infrastructure support group. Virtualization Layer: In some environments virtual machines (VM's) are used to partition/encapsulate a machine's resources to behave as separate distinct hosts. The virtualization layer refers to these virtual machines. Administrative Layer: The administrative layer encompasses the supporting technology components which provide access, administration, backups, and monitoring of the other layers.