Problem A

Problem A: Portland Sewing Factory
Bag type Demand Forecast (units/year) Processing Time (minutes/ unit) Lot Size (# of bags) Setup Time (minutes/ setup)
Messenger 14,000 8 10 50
Grocery 16,000 10 10 80
Fashion 19,000 12 25 40
Total Processing Time Total Setup Time minutes
Total Time Required minutes
Shifts 2 Total Time Available minutes
Yearly Hours per Shift 2,000 Lines

Problem B

Problem B: Camus Ketchup
Process Fixed Cost Variable Cost Units Cost Current Line A Line B
Current 240000 0.5 0
Line A 320000 0.3 250000
Line B 400000 0.25 500000
750000
Comparison Indiff Quantity 1000000
Current vs. A 1250000
Current vs. B 1500000
A vs. B 1750000
2000000