Space Age Furniture Company

The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens and portable televisions. These products are made in various sizes and with various features, but all follow basically the same production and assembly operations. However, two of these products—the Saturn microwave stand and the Gemini TV stand—have a part (no. 3079) that requires machining on a special lathe used only for making that part. At present the machine is run by Ed Szewczak, a machinist who also operates other machines in Space Age's shop. Once set up and started, the lathe can run nearly unattended. However, the machinist must be present (even if not actually attending the machine) any time one of the machines, including the lathe, is in operation. At present, Ed works a regular 40-hour week. However, due to the workload for producing part 3079, it has been necessary to schedule frequent overtime for him in order to finish the necessary parts on time.

Coral Snodgrass, operations manager for Space Age, has just heard from Ed's foremen that Ed is becoming unhappy about so much overtime. As Coral knows, Ed has been with the company a long time and is an excellent, reliable employee. Skilled machinists with Ed's experience and employment record are extremely difficult to find. Coral wonders what can be done to alleviate this problem.

Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. In fact, Space Age carries no finished-goods inventory. Instead, everything in the master schedule is being produced for customer orders, so all products are shipped almost immediately. Previously Space Age had estimated that it cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn't shipped immediately. The master schedule for producing these two items for the next six weeks is shown below.

Master Schedule

Week

1

2

3

4

5

6

Gemini

600

400

700

500

400

600

Saturn

300

400

400

600

300

300

The part in question, 3079, is used in two different subassemblies: no. 435, which is used in the Gemini TV stand, and no. 257, which is used in the Saturn microwave stand. One of part 3079 is used in each subassembly, and one of each subassembly is used in each of the final products.

Part 3079 may be produced in any quantity since the lathe that makes it is not used for anything else. However, both of the subassemblies are produced using the same equipment. To minimize change over time, Space Age has decided that these subassemblies should be made in minimum quantities of 1,000 at a time, although there is no problem with capacity on the equipment that makes them. In fact, an order for 1,000 of subassembly 435 is due to be received in week 1, as is an order for 1,000 of subassembly 257. Lead time for both these subassemblies is one week, and no inventory is expected to be on hand for either part at the beginning of week 1. There is not any on-hand inventory of part 3079, and there are no orders in process.

Ed Szewczak earns $22 per hour and gets a 50% premium for any overtime work. Whenever part 3079 is made, there is no set-up time, but processing takes 0.03 hour per unit. It costs $0.25 per week to hold any of these parts over from one week to the next. The cost of holding each subassembly in inventory is $0.75 per unit per week.

Space

Age

Furniture

Company

The

Space

Age

Furniture

Company

manufactures

tables

and

cabinets

to

hold

microwave

ovens

and

portable

televisions.

These

products

are

made

in

various

sizes

and

with

various

features,

bu

t

all

follow

basically

the

same

production

and

assembly

operations.

However,

two

of

these

prod

ucts

the

Saturn

microw

ave

stand

and

the

Gemini

TV

stand

have

a

part

(no.

3079)

that

requires

machining

on

a

special

lathe

used

only

for

making

that

part.

At

present

the

machine

is

run

by

Ed

Szewczak,

a

machinist

who

also

operates

other

machines

i

n

Space

Age's

shop.

Once

set

up

and

started,

the

lathe

can

run

nearly

unattended.

However,

th

e

machinist

must

be

present

(even

if

not

actually

attending

the

machine)

any

time

one

of

the

m

achines,

including

the

lathe,

is

in

operation.

At

present,

Ed

works

a

regular

40

-

hour

week.

However,

due

to

the

workload

for

producing

part

3079,

it

has

been

necessary

to

sch

edule

frequent

overtime

for

him

in

order

to

finish

the

necessary

parts

on

time.

Coral

Snodgrass,

operations

manager

for

Space

Age,

has

just

heard

from

Ed's

foremen

that

Ed

is

becoming

unhappy

about

so

much

overtime.

As

Coral

knows,

Ed

has

been

with

the

company

a

l

ong

time

and

is

an

excellent,

reliable

employee.

Skilled

machinists

with

Ed's

experience

and

em

ployment

record

are

extremely

difficult

to

find.

Coral

wonders

what

can

be

done

to

alleviate

thi

s

problem.

Recently,

Space

Age

began

using

an

MRP

system

that

has

helped

reduce

inventories

greatly

and

improve

on

-

time

deliveries.

In

fact,

Space

Age

carries

no

finished

-

goods

inventory.

Instead,

everything

in

the

master

schedule

is

being

produced

for

customer

ord

ers,

so

all

products

are

shipped

almost

immediately.

Previously

Space

Age

had

estimated

that

it

cost

$1.25

per

week

to

store

each

Gemini

and

$1.50

per

week

to

store

each

Saturn

that

wasn't

s

hipped

immediately.

The

master

schedule

for

producing

these

two

items

for

the

next

six

weeks

is

shown

below.

Master

Schedule

Week

1

2

3

4

5

6

Gemini

600

400

700

500

400

600

Saturn

300

400

400

600

300

300

Space Age Furniture Company

The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens

and portable televisions. These products are made in various sizes and with various features, bu

t all follow basically the same production and assembly operations. However, two of these prod

ucts—the Saturn microwave stand and the Gemini TV stand—

have a part (no. 3079) that requires machining on a special lathe used only for making that part.

At present the machine is run by Ed Szewczak, a machinist who also operates other machines i

n Space Age's shop. Once set up and started, the lathe can run nearly unattended. However, th

e machinist must be present (even if not actually attending the machine) any time one of the m

achines, including the lathe, is in operation. At present, Ed works a regular 40-

hour week. However, due to the workload for producing part 3079, it has been necessary to sch

edule frequent overtime for him in order to finish the necessary parts on time.

Coral Snodgrass, operations manager for Space Age, has just heard from Ed's foremen that Ed is

becoming unhappy about so much overtime. As Coral knows, Ed has been with the company a l

ong time and is an excellent, reliable employee. Skilled machinists with Ed's experience and em

ployment record are extremely difficult to find. Coral wonders what can be done to alleviate thi

s problem.

Recently, Space Age began using an MRP system that has helped reduce inventories greatly and

improve on-time deliveries. In fact, Space Age carries no finished-

goods inventory. Instead, everything in the master schedule is being produced for customer ord

ers, so all products are shipped almost immediately. Previously Space Age had estimated that it

cost $1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wasn't s

hipped immediately. The master schedule for producing these two items for the next six weeks

is shown below.

Master Schedule

Week

1 2 3 4 5 6

Gemini 600 400 700 500 400 600

Saturn 300 400 400 600 300 300