Material Requirements

Planning (MRP)

12-2

MRP

•Material requirements planning (MRP):

– A computer-based information system that

translates master schedule requirements for

end items into time-phased requirements for

subassemblies, components, and raw

materials.

– The MRP is designed to answer three

questions:

1. What is needed?

2. How much is needed?

3. When is it needed?

MRP Objectives

• Improve customer service

• Reduce inventory

investment

• Improve coordinating

production and thus, plant

operating efficiency

3

MRP Inputs MRP Processing MRP Output

Master

Production

Schedule

Bill-of-

Materials

File

Inventory

Records

File

MRP

Computer

Programs

Changes

Order Release

Planned-Order

Schedules

Exception

Reports

Planning Reports

Performance

Control Reports

Inventory

Transactions

Order

Forecast

Design

Changes

Receipts

Withdrawal

P ri

m a ry

R e p

o rt

S

e c o

n d

a ry

R e p

o rt

Overview of MRP

Master Production Scheduling

• The master schedule deals with end items and is a

major input to the MRP process.

• All production systems have limited capacity and

limited resources.

– The aggregate plan provides the general range of operation;

the master scheduler must specify exactly what is to be

produced.

• To determine an acceptable feasible schedule to be

released to the shop, trial master production

schedules are tested using the MRP program.

5

Electronic Industry (10,000 Items)

 Product Group

TV (19”, 32”, …, 72”) 1000

Computer 5000

Cell Phone 2000

Others 2000

Total 10,000

6

This is an example of an electronic industry produces 10000 items. We can break them into 4 group of products in creating aggregate plan.

12-7

Master Schedule

TV WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8

19” 10 30 80 0 10 10 0 20

32” 30 10 0 50 5 0 80 40

72” … …. … … … … … …

Other

Sizes

… … … … … … … …

Total = 1000 This slide displays one of the groups in our agregate plan (TV) in demand for individual items during 8 weeks and it is called Master Schedule. It showes what to produce, when to make them, and how much.

12-8

Disaggregating the Aggregate

Plan

• Master schedule:

– The result of disaggregating an aggregate

plan

– Shows quantity and timing of specific end

items for a scheduled horizon

From Aggregate plan to

MPS • MPS: Time-phased plan specifying how

many and when the firm plans to build

each end item

Aggregate Plan

(Product Groups)

MPS

(Specific End Items)

9

From Aggregate plan to MPS

10

Week

Aggregate plan shows

overall quantities to

produce – without

specifying type.

MPS shows quantities of

each type, with

information about the

production time frame.

12-11

MRP: Development

• The MRP is based on the product structure tree diagram

• Requirements are determined level by level, beginning

with the end item and working down the tree

– The timing and quantity of each “parent” becomes the basis for

determining the timing and quantity of the “children” items directly

below it.

– The “children” items then become the “parent” items for the next

level, and so on

3 – Drawer

File Cabinet

Case

(1)

Lock

(1)

Drawers

(3)

Drawer

Slide

(6)

Formed

Case

(1)

Formed

Drawer

(1)

Handle

(1)

Support

Rollers

(2)

Sheet

Steel

Sheet

Steel

Level 0

Level 1

Level 2

Level 3

Product Structure File

X

C (1)

B (2)

F (2)

E (2)

E (1)

D (2)

E (4)

0

1

2

3

Product Structure File

varzande
Sticky Note
Similar components are not in the same level in this BOM

X

C (1)

B (2)

F (2)

E (2)

E (1)

D (2)

E (4)

0

1

2

3

Product Structure File

varzande
Sticky Note
Placing similar components in the lowest level where that component is list called low level coding

W

F L G

I H M P

G J

0

1

2

3

Product Structure File

12-16

Example MRP

Shutter

Frames (2) Wood

sections (4)

Example MRP

MRP Record

18

Week Number 1 2 3 4 5 6

MRP Responds to Net Requirements, and creating 2 plans: “Planned Order Receipt” and “Planned Order Release”

MRP Record

19

Week Number 1 2 3 4 5 6

MRP Responds to Net Requirements, and creating 2 plans: “Planned Order Receipt” and “Planned Order Release”

MPR Record

• Gross requirements – Total expected demand

• Scheduled receipts – Open orders scheduled to arrive

• Projected on hand – Expected inventory on hand at the beginning

of each time period

• Net requirements – Actual amount needed in each time period

• Planned-order receipts – Quantity expected to be received at

the beginning of a period Offset by

lead time

• Planned-order releases – Planned amount to order in each

time period

20

Calculating Net Requirements

• Adjusts gross requirements to account for

the quantity already on hand and on order.

                  

         -

Available Inventory

Net Gross On Hand Scheduled

Requirements Requirements Inventory Receipts

21

MRP Primary Outputs

• Planned orders – Schedule indicating the amount and timing of future orders.

• Order releases – Authorization for the execution of planned orders.

• Changes – Revisions of due dates or order quantities, or cancellations of orders.

22

MRP Secondary Reports

• Performance-control reports – Evaluation of system operation, including deviations from plans and cost information

– e.g., missed deliveries and stockouts

• Planning reports – Data useful for assessing future material requirements

– e.g., purchase commitments

• Exception reports – Data on any major discrepancies encountered

– E.g., late and overdue orders, excessive scrap rates,

requirements for nonexistent parts

23

• Enables managers to easily

– determine the quantities of each component for a given order size

– To know when to release orders for each component

– To be alerted when items need attention

• Additional benefits

– Low levels of in-process inventories

– The ability to track material requirements

– The ability to evaluate capacity requirements

– A means of allocating production time

– The ability to easily determine inventory usage via backflushing

– Exploding an end item’s BOM to determine the quantities of the

components that were used to make the item

MRP Benefits

• Consequence of Inaccurate Data

– Missing parts

– Ordering incorrect numbers of items

– Inability to stay on schedule

• Other problems

– Assumptions of constant lead times

– Products being produced differently from the BOM

– Failure to alter a BOM when customizing a product

– Inaccurate forecasts

MRP Difficulties

Develop a tentative

MPS

Use MRP to

simulate material

requirements

Convert material

requirements to

resource requirements

Firm up a portion

of the MPS

Is shop

capacity

adequate?

Can capacity be

changed to meet

requirements

Revise tentative

master production

schedule

Change

capacity

Yes

No

Yes

No

Time Fence

Capacity Requirement

Procedure

MRP in Services

• Food catering service

–End item catered food

–Dependent demand ingredients for each recipe, i.e. bill of materials

• Hotel renovation

–Activities and materials “exploded” into component parts for cost estimation and scheduling

27

MRP II

Expanded MRP with emphasis placed on integration involving other areas of the firm in the planning process and enabling capacity requirements planning

–Financial planning

–Marketing

–Engineering

–Purchasing

–Manufacturing 28

MRP II Market Demand Manufacturing

Others

Finance

Marketing

MRP II Market Demand

Production Plan

Manufacturing

Others

Finance

Marketing

Rough-cut Capacity

Planning

Problems

?

Yes, Then Adjust Production

Plan

No

MRP II Market Demand

Production Plan

Manufacturing

Others

Finance

Marketin

g Rough-cut Capacity

Planning

Problems

?

Yes, Then Adjust Production

Plan

No MPS

MRP

Capacity

Requirements

Planning

Problems?

Yes No

Requirements Schedule Adjust MPS