Need to complete 2 parts from a project

profilesaheerbasma
the_requirements.docx

Hi

Please download this file: http://expirefile.com/jpvssg

Which has the project slides and information that will help for this project

I could not attach it in the website because it is more than 25MB, it is 36MB

I just need you to complete this project (Check the file attached called "The project.docx" which is the project that I need you to complete) please read all what I have done on it so that you can understand the topic.

The topic of the project is Expansion Joint Manufacturing, which we need to design a system for the Expansion Joint

Here is the project steps:

Executive Summary

1. Scope

1.1  Objectives

1.2  Assumptions

1.3  Applicable Documents

1.4  People Responsible for updating SEMP (remember SEMP is a live document)

2. Overview

            2.1 Organization chart (identify subsystems)

            2.2 Purpose, Objectives and Activities of system and subsystems

            2.3 Identify TPMs  (need you to do this)

3.  Plans  for System Engineering Process

            3.1 Mission statement

            3.2 Tasks and Functions

            3.3 Models / Data

            3.4 Testing and Evaluation

            3.5 Resource Allocation (people, tools, $, time, responsibilities)

            3.6 Logistics

            3.7 Maintenance

            3.8 Life Cycle Cost Analysis  (need you to do this)

            3.9 System Optimization  (need you to do this)

4.  Plans  for Production and Evaluation

            4.1 Overall baseline (what will happen and when)

            4.2 Risk management (e.g. what happens if there are delays?)

            4.3 Hardware

            4.4 Software

            4.5 Installation

            4.6 testing

5.  Plans  for System Utilization

            5.1 Reliability

            5.2 Maintainability

            5.3 Security (how do you protect the system?)

            5.4 Commissioning and decommissioning

            5.5 Quality monitoring

Nomenclature

References

Appendices

I just need you to do the 3 highlighted things to complete this project which are (2.3 Identify TPMs, 3.8 Life Cycle Cost Analysis and 3.9 System Optimization)

The file attached "All slides and steps.pdf" has all steps and how to do it step by step. I need you to do it 100% correct and perfect.

For the Life Cycle Cost Analysis, you can also use the "Resourse Allocation.xlsx" attached for it and you will find also helpful information in "expansion-joint-catalog.pdf" file which you can read.

I need the work a 100% correct in 24hrs. Can you do it correctly?