Risk Score for a Specific Risk
Probability Risk Score = P x I
0.9 0.90 1.80 2.70 3.60 4.50
0.7 0.70 1.40 2.10 2.80 3.50
0.5 0.50 1.00 1.50 2.00 2.50
0.3 0.30 0.60 0.90 1.20 1.50
0.1 0.10 0.20 0.30 0.40 0.50
  1 2 3 4 5
Impact on an Objective (e.g., cost, time, or scope)