six sigma

profileMalansari23
my_answers_for_couple_questions.docx

Question 1:

Step 1:

Case studies presentation codes

Total of codes

Gage R&R

Jakacs1091916, AjsDcs1091916, dbcs1092216, ALCS1092216, CBCS1092216,

RBCS1092216,

BCMECS1091816, FAEACS1091616

8

FMEA

Dbcs1092216, FAEACS1091616

2

Hypothesis testing

AjsDcs1091916, DANACS1092116, Dbcs1092216, jbcs1092216

4

Design of experiment

Jakacs1091916, DCCS1092216, BACS1092216, ecsbcs1092616, AAADCS1091916

5

Step 2:

1- Gage R&R advanced tool was used 8 times.

2- Design of experiment (D.O.E) advanced tool was used 5 times.

Question 3:

3A)

Case studies presentation codes

Total of codes

SPC (control charts)

BBCS2101316, dbcs2101316, ALCS2101316, RBCS2101316, DANACS2102616,

FAEACS2102416, AKSCCS2102616, AFMBCS2103116, SAALCS2103116, ecsbcs2102416, AJSDCS2102616

11

Pareto chart

Dbcs2101316, BAcs2101316, RBCS2101316, DANACS2102616, FAEACS2102416, MDQAcs2103116, SAALCS2103116, AAADCS2103116, ecsbcs2102416, AJSDCS2102616

10

Cause and Effect (Fishbone) Diagram

BBCS2101316, TBCS2101316, JBCS2101316, Dbcs2101316, ALCS2101316, JAcs2101316, DCCS2101316, RBCS2101316, CAACCS2102416,

FAEACS2102416, AKSCCS2102616, MDQAcs2103116, AFMBCS2103116, ABMCC2102416, AAADCS2103116, ecsbcs2102416, jakacs2103116, AJSDCS2102616

18

Histogram

BAcs2101316, FAEACS2102416, SAALCS2103116, ABMCC2102416,

BCMECS2102416

5

Run chart

TBCS2101316, CBCS2101316,

JAcs2101316, DANACS2102616, DEAECS2102416, AFMBCS2103116, jakacs2103116, RAMACS2102616

8

Prioritization matrix

JBCS2101316, JAcs2101316

2

3B)

a) Histogram and Pareto chart:

1-

2-

3-

4-

b) Run chart and control chart:

1- Run chart allow the study of observed data for patter over time and control charts gives a study of variation and its source.

2- Control charts can be used to monitor the process and the run charts can be to compare the performance before and after a solution has been implemented.

3- they both use scatter plot.

4-

c) Fishbone Diagram and Prioritization Matrix:

1-

2-

3-

4-