website

profileemey.b
lesson_learned.docx

Running Head MASTER PROJECT

MASTER PROJECT 2

Topic: Lesson learned

Master project

Through this project, one is made aware that a large number of international students provide so many opportunities. One of such opportunity is developing the website tailored to suit their different needs since the information on the internet not adequate for everyone need. Even before starting to develop a website, it is good to define the problem properly then come up with a suitable solution. The second step is carrying out a feasibility study that entails; studying the benefit that the site will generate, the stakeholders are people that will directly or indirectly use the site. Other factors include maintainability, risk, economic value and reliability.

The basic design of a project has six phases that include planning initiation, Designing, Developing, testing and documenting, implementation and post-implementation. For the project to be successful, it as to meet the post-agreement or the expected outcome, that is time, quality, cost and scope. However, there is a likelihood of risks such as unexpected software abnormalities, overestimation of the project team’s ability, failure to meet the deadline and security threats. Such risks may be mitigated by first identifying those risks assessing them and then prioritizing in a case of more than one risk. The most concerned risk should be given priority to be treated after that it should be monitored and controlled. Apart from the risk associated with website development there, some of the errors that web developer fails to observe.

HTML Validation Errors- these are hidden errors, that cannot be seen but search engines can detect them. These errors are likely to hurt your search engine ranking or hinder potential visitors from seeing them. Broken links can be eradicated by the use of website checker to ensure that the pages lead to live web pages.