BUS644 Operations Management / Space Age Furniture Company
Space Age Furniture Company
The Space Age Furniture Company manufactures tables and cabinets to hold microwave
ovens and portable televisions. These products are made in various sizes and with various features, but all follow basically the same production and assembly operations. How ever,
two of these products—the Saturn microwave stand and the Gemini TV stand—have a part (no. 3079) that requires machining on a special lathe used only for making that part. At
present the machine is run by Ed Szewczak, a machinist who also operates oth er machines in Space Age's shop. Once set up and started, the lathe can run nearly unattended. However,
the machinist must be present (even if not actually attending the machine) any time one of
the machines, including the lathe, is in operation. At presen t, Ed works a regular 40-hour week. However, due to the workload for producing part 3079, it has been necessary to schedule frequent overtime for him in order to finish the necessary parts on time.
Coral Snodgrass, operations manager for Space Age, has ju st heard from Ed's foremen that
Ed is becoming unhappy about so much overtime. As Coral knows, Ed has been with the
company a long time and is an excellent, reliable employee. Skilled machinists with Ed's experience and employment record are extremely diff icult to find. Coral wonders what can be done to alleviate this problem.
Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. In fact, Space Age carries no finished -goods inventory.
Instead, everything in the master schedule is being produced for customer orders, so all products are shipped almost immediately. Previously Space Age had estimated that it cost
$1.25 per week to store each Gemini and $1.50 per week to store each Saturn that wa sn't
shipped immediately. The master schedule for producing these two items for the next six
weeks is shown below.
Master Schedule
Week 1 2 3 4 5 6 Gemini 600 400 700 500 400 600
Saturn 300 400 400 600 300 300
The part in question, 3079, is used in two different subassemblies: no. 435, which is used in
the Gemini TV stand, and no. 257, which is used in the Saturn microwave stand. One of part
3079 is used in each subassembly, and one of each subassembly is used in each of the final products.
Part 3079 may be produced in any quantity since the lathe that makes it is not used for
anything else. However, both of the subassemblies are produced using the same
equipment. To minimize change over time, Space Age has decided that these subassemblies
should be made in minimum quantities of 1,000 at a time, although there is no problem with capacity on the equipment that makes them. In fact, an order for 1,000 of subassembly
435 is due to be received in week 1, as is an order for 1,000 of subassembly 257. Lead time
for both these subassemblies is one week, and no inventory is expected to be on hand for
either part at the beginning of week 1. There is not any on -hand inventory of part 3079, and there are no orders in process.
Ed Szewczak earns $22 per hour and gets a 50 % premium for any overtime work.
Whenever part 3079 is made, there is no set-up time, but processing takes 0.03 hour per unit. It costs $0.25 per week to hold any of these parts over from one week to the next. The cost of holding each subassembly in inventory is $0.75 per unit per week.