FMEA Worksheet

Failure modes and effects analysis (FMEA)
Project: Date:
FMEA Team: Prepared by:
SEV = How severe is effect on the customer?
OCC = How frequent is the cause likely to occur?
DET = How probable is detection of cause?
RPN = Risk priority number in order to rank concerns; calculated as SEV x OCC x DET
Process step Potential failure mode Potential failure effects SEV Potential causes OCC Current process controls DET RPN Actions recommended Responsibility (target date) Actions taken New SEV New OCC New DET New RPN
What is the step? In what ways can the step go wrong? What is the impact on the customer if the failure mode is not prevented or corrected? 10 What causes the step to go wrong? (i.e., How could the failure mode occur?) 10 What are the existing controls that either prevent the failure mode from occurring or detect it should it occur? 10 1000 What are the actions for reducing the occurrence of the cause or for improving its detection? You should provide actions on all high RPNs and on severity ratings of 9 or 10. Who is responsible for the recommended action? What date should it be completed by? What were the actions implemented? Include completion month/year (then recalculate resulting RPN). 10 10 10 1000
0 0
&L&F&CPrinted &T,&D&RPage &P of &N

Rating Factors

Add Row

Add Row