What is Supply Chain Integration?
Supply Chain Integration
The effective coordination of supply chain processes though the seamless flow of information up and down the supply chain.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Supply Chain Integration
Upstream
Tier 3
Tier 2
Tier 1
Downstream
Information flows
Cash flows
Tomato suppliers
Tomato paste factories
Tomato grading stations
Retail sales
Consumers
Ketchup factory
Figure 14.1
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
3
Supply Chain Disruptions
External Causes
Environmental Disruptions
Supply Chain Complexity
Loss of Major Accounts
Loss of Supply
Customer-Induced Volume Changes
Service and Product Mix Changes
Late Deliveries
Underfilled Shipments
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Supply Chain Disruptions
Internal Causes
Internally Generated Shortages
Quality Failures
Poor Supply Chain Visibility
Engineering Changes
Order Batching
New Service or Production Introductions
Service or Product Promotions
Information Errors
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Supply Chain Dynamics
Bullwhip Effect
The phenomenon in supply chains whereby ordering patterns experience increasing variance as you proceed upstream in the chain.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Supply Chain Dynamics
The Bullwhip Effect
9,000
7,000
5,000
3,000
0
Order quantity
Month of April
Day 1
Day 30
Day 1
Day 30
Day 1
Day 30
Day 1
Day 30
Consumers’ daily demands
Retailers’ daily orders to manufacturer
Manufacturer’s weekly orders to package supplier
Package supplier’s weekly orders to cardboard supplier
Figure 14.2
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Integrated Supply Chains
External Supply Chain Linkages
First-Tier Supplier
Service/Product Provider
Support Processes
External Suppliers
Support Processes
Supplier relationship process
New service/ product development process
Order fulfillment process
Business-to-business (B2B) customer relationship process
External Consumers
Supplier relationship process
New service/ product development process
Order fulfillment process
Business-to-business (B2B) customer relationship process
Business-to-business (B2B) customer relationship process
Business-to-consumer (B2C) customer relationship process
Figure 14.3
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
8
Integrated Supply Chains
SCOR (Supply Chain Operations Reference) Model
Plan
Source (purchasing)
Make (manufacturing)
Delivery
Return (returned product)
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall
12 - 09
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
SCOR Model
Figure 14.4
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
New Service/Product Development
Design
Analysis
Development
Full Launch
Service or product not profitable
Need to rethink the new offering or production process
Post-launch review
Figure 14.5
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall
12- 12
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Supplier Relationship Process
Supplier selection
Material costs
Annual material costs = pD
Freight costs
Inventory costs
Cycle inventory = Q/2
Pipeline inventory = L
Annual inventory costs = (Q/2 + L) H
Administrative costs
Total Annual Cost =
pD + Freight costs + (Q/2 + L) H + administrative costs.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
13
Example 14.1
Compton Electronics manufactures laptops for major computer manufacturers. A key element of the laptop is the keyboard. Compton has identified three potential suppliers for the keyboard, each located in a different part of the world. Important cost considerations are the price per keyboard, freight costs, inventory costs, and contract administrative costs. The annual requirements for the keyboard are 300,000 units. Assume Compton has 250 business days a year. Managers have acquired the following data for each supplier.
Which supplier provides the lowest annual total cost to Compton?
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
14
Example 14.1
| Annual Freight Costs | |||
| Shipping Quantity (units/shipment) | |||
| Supplier | 10,000 | 20,000 | 30,000 |
| Belfast | $380,000 | $260,000 | $237,000 |
| Hong Kong | $615,000 | $547,000 | $470,000 |
| Shreveport | $285,000 | $240,000 | $200,000 |
| Keyboard Costs and Shipping Lead Times | ||||
| Supplier | Price/Unit | Annual Inventory Carrying Cost/Unit | Shipping Lead Time (days) | Administrative Costs |
| Belfast | $100 | $20.00 | 15 | $180,000 |
| Hong Kong | $96 | $19.20 | 25 | $300,000 |
| Shreveport | $99 | $19.80 | 5 | $150,000 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
15
Example 14.1
The average requirements per day are:
Total Annual Cost =
pD + Freight costs + (Q/2 + dL)H + Administrative costs
d =
300,000/250 = 1,200 keyboards
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
16
Example 14.1
BELFAST: Q = 10,000 units.
Material costs = pD =
Freight costs = $380,000
Administrative costs = $180,000
Total Annual Cost =
= (10,000 units/2 + 1200 units/day(15 days))$20/unit/year
= $460,000
= $31,020,000
$30,000,000 + $380,000 + $460,000 + $180,000
= $30,000,000
($100/unit)(300,000 units)
Inventory costs = (cycle inventory + pipeline inventory)H
= (Q/2 + L)H
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
17
The total costs for all three shipping quantity options are similarly calculated and are contained in the following table.
Example 14.1
| Total Annual Costs for the Keyboard Suppliers | |||
| Shipping Quantity | |||
| Supplier | 10,000 | 20,000 | 30,000 |
| Belfast | |||
| Hong Kong | |||
| Shreveport |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
18
The total costs for all three shipping quantity options are similarly calculated and are contained in the following table.
Example 14.1
| Total Annual Costs for the Keyboard Suppliers | |||
| Shipping Quantity | |||
| Supplier | 10,000 | 20,000 | 30,000 |
| Belfast | |||
| Hong Kong | |||
| Shreveport |
| $31,020,000 | $31,000,000 | $31,077,000 |
| $30,352,800 | $30,406,800 | $30,465,800 |
| $30,387,000 | $30,415,000 | $30,434,000 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
19
Green Purchasing
Green purchasing – The process of identifying, assessing, and managing the flow of environmental waste and finding ways to reduce it and minimize its impact on the environment.
Choose environmentally conscious suppliers.
Use and substantiate claims such as green, biodegradable, natural, and recycled.
Use sustainability as criteria for certification.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Example 14.2
The management of Compton Electronics has done a total cost analysis for three international suppliers of keyboards (see Example 14.1). Compton also considers on-time delivery, consistent quality, and environmental stewardship in its selection process. Each criterion is given a weight (total of 100 points), and each supplier is given a score (1 = poor, 10 = excellent) on each criterion. The data are shown in the following table.
| Score | ||||
| Criterion | Weight | Belfast | Hong Kong | Shreveport |
| Total Cost | 25 | 5 | 8 | 9 |
| On-Time Delivery | 30 | 9 | 6 | 7 |
| Consistent Quality | 30 | 8 | 9 | 6 |
| Environment | 15 | 9 | 6 | 8 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Example 14.2
Belfast =
(25 5) + (30 9) + (30 8) + (15 9) = 770
Hong Kong =
(25 8) + (30 6) + (30 9) + (15 6) = 740
Shreveport =
(25 9) + (30 7) + (30 6) + (15 8) = 735
Preferred
For example, the Belfast weighted score is:
The weighted score for each supplier is calculated by multiplying the weight by the score for each criterion and arriving at a total.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Supplier Relationship Process
Design collaboration
Early supplier involvement
Presourcing
Value analysis
Negotiation
Competitive orientation
Cooperative orientation
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Supplier Relationship Process
Buying
Electronic Data Interchange (EDI)
Catalog Hubs
Exchanges
Auctions
Locus of Control
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Supplier Relationship Process
Information Exchange
Radio Frequency Identification (RFID)
Vendor-Managed Inventories (VMI)
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Using Information Systems to Achieve Competitive Advantage
Supermarkets and large retail stores such as Walmart use sales data captured at the checkout counter to determine which items have sold and need to be reordered. Walmart’s continuous replenishment system (also known as Vendor Managed Inventory – VMI) transmits orders to restock directly to its suppliers (wrong). The system enables Walmart to keep costs low while fine-tuning its merchandise to meet customer demands.
Supplier Relationship Process
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
26
Build a competitive advantage that helps to build the business while driving down costs.
Improve customer satisfaction – drives additional sales.
Provides more detailed data, closer to the point of actual demand, to help develop better production and inventory plans/forecasts, ultimately leading to lower inventories at the manufacturer.
Reduces lead-time from “order to delivery” (the order fulfillment process) and provides an additional set of eyes to manage the customer’s inventory that will ultimately lead to lower inventories at the retailer and manufacturer.
Transfers responsibility of retailer inventory management to the vendor.
Improve the business relationship between the two trading partners.
VMI’s Objectives
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Customer Benefits
Reduces and balances inventory levels
Improves cash flow
More productive use of the Buyers time
Improves service level to distribution centers and stores, reducing out of stocks
Reduces administrative costs
Warehouse efficiencies (reduced space requirements, less product handling, stabilize staffing/reduce overtime)
Reduce damage/unsaleables
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Improve reliability (on time deliveries)
Shorter lead-time/cycle-time
Higher truckload utilization
Increased volume
Increased profitability
Dedicated Single Point of Contact (SPOC)
Preferential treatment on order fulfillment, product allocations, shipments
Customer Benefits (continued)
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Supplier/Manufacturer Benefits
Reduces and balances inventory levels
Shorter lead-time/cycle-time
Higher truckload utilization
Improves cash flow, increases sales and profitability
Improves “perfect order” %
Increases service level to distribution centers and stores, reducing out of stocks (reliability) – increasing sales
Warehouse efficiencies (reduced space requirements, less product handling, stabilize staffing/reduce overtime)
Reduce damage/unsaleables
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
VMI Performance Measures
Inventory levels ($, weeks on hand, turns)
On time deliveries
Order/case completeness
Out of stocks/cuts to stores (increased reaction time)
Communication (problems before they happen, special promotions, etc.)
Perfect orders – on-time, complete and billed accurately
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
VMI – Combined With Consignment
Who knows what consignment is?
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Consignment Concept
Customer pays based on scan data (actual sales) versus receipt of goods
Customer builds trust in inventory control capabilities of supplier
Customer no longer needs to manage inventory on a daily/weekly basis
Eliminates 2% terms discount (2% 10, net 30)
Eliminate invoicing
Customer required to be Vendor Managed Inventory (VMI), Electronic Funds Transfer (EFT) capable
Incents efficient behaviors
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Consignment Timeline
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
35
Radio Frequency Tags
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
35
Order Fulfillment Process
Customer Demand Planning
Supply Planning
Production
Logistics
Ownership
Facility location
Mode selection
Capacity level
Cross-docking
The Perfect Order
On-Time
Complete
Billed Accurately
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Example 14.3
Tower Distributors provides logistical services to local manufacturers. Tower picks up products from the manufacturers, takes them to its distribution center, and then assembles shipments to retailers in the region. Tower needs to build a new distribution center; consequently, it needs to make a decision on how many trucks to have. The monthly amortized capital cost of ownership is $2,100 per truck. Operating variable costs are $1 per mile for each truck owned by Tower. If capacity is exceeded in any month, Tower can rent trucks at $2 per mile. Each truck Tower owns can be used 10,000 miles per month. The requirements for the trucks, however, are uncertain. Managers have estimated the following probabilities for several possible demand levels and corresponding fleet sizes.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Example 14.3
If Tower Distributors wants to minimize the expected cost of operations, how many trucks should it have?
| Requirements (miles/month) | 100,000 | 150,000 | 200,000 | 250,000 |
| Fleet Size (trucks) | 10 | 15 | 20 | 25 |
| Probability | 0.2 | 0.3 | 0.4 | 0.1 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Example 4.3
C = monthly capital cost of ownership + variable operating cost per month + rental costs if needed
C(100,000 miles/month) =
C(150,000 miles/month) =
C(200,000 miles/month) =
C(250,000 miles/month) =
($2,100/truck)(10 trucks) + ($1/mile)(100,000 miles) = $121,000
($2,100/truck)(10 trucks) + ($1/mile)(100,000 miles) + ($2 rent/mile)(150,000 miles – 100,000 miles)
= $221,000
($2,100/truck)(10 trucks) + ($1/mile)(100,000 miles) + ($2 rent/mile)(200,000 miles – 100,000 miles)
= $321,000
($2,100/truck)(10 trucks) + ($1/mile)(100,000 miles) + ($2 rent/mile)(250,000 miles – 100,000 miles)
= $421,000
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Example 14.3
Next, calculate the expected value for the 10 truck fleet size alternative as follows:
Expected Value (10 trucks) =
Using similar logic, we can calculate the expected costs for each of the other fleet-size options:
Expected Value (15 trucks) =
Expected Value (20 trucks) =
Expected Value (25 trucks) =
0.2($121,000) + 0.3($221,000) + 0.4($321,000) + 0.1($421,000) = $261,000
0.2($131,500) + 0.3($181,500) + 0.4($281,500) + 0.1($381,000) = $231,500
0.2($142,000) + 0.3($192,000) + 0.4($242,000) + 0.1($342,000) = $217,000
0.2($152,500) + 0.3($202,500) + 0.4($252,500) + 0.1($302,500) = $222,500
The preferred option is 20 trucks.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
The Customer Relationship Process
Marketing
Business-to-Consumer Systems
Business-to-Business Systems
Order Placement
Cost Reduction
Revenue Flow Increase
Global Access
Pricing Flexibility
Customer Service
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
41
Supply Chain Risk Management
Supply Chain Risk Management
The practice of managing the risk of any factor or event that can materially disrupt a supply chain, whether within a single firm or across multiple firms.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Operational Risks – Threats to the effective flow of materials, services, and products in a supply chain
Strategic Alignment
Upstream/Downstream Supply Chain Integration
Visibility
Flexibility and Redundancy
Short Replenishment Lead Times
Small Order Lot Sizes
Rationing Short Supplies
Everyday low pricing (EDLP)
Cooperation and Trustworthiness
Supply Chain Risk Management
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
43
Financial Risks – Threats to the financial flows in a supply chain, such as prices, costs, and profits.
Low Cost Hopping
Hedging
Production Shifting
Futures Contract
Supply Chain Risk Management
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
44
Security Risks - Threats to a supply chain that could potentially damage stakeholders, facilities, or operations.
Access Control
Physical Security
Shipping and Receiving
Transportation Service Provider
ISO 28000
Supply Chain Risk Management
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
45
Performance Measures
| Customer Relationship | Order Fulfillment | Supplier Relationship |
| Percent of orders taken accurately Time to complete the order placement process Customer satisfaction with the order placement process Customer’s evaluation of firm’s environmental stewardship Percent of business lost because of supply chain disruptions | Percent of incomplete orders shipped Percent of orders shipped on-time Time to fulfill the order Percent of botched services or returned items Cost to produce the service or item Customer satisfaction with the order fulfillment process Inventory levels of work-in-process and finished goods Amount of greenhouse gasses emitted into the air Number of security breaches | Percent of suppliers’ deliveries on-time Suppliers’ lead times Percent defects in services and purchased materials Cost of services and purchased materials Inventory levels of supplies and purchased components Evaluation of suppliers’ collaboration on streamlining and waste conversion Amount of transfer of environmental technologies to suppliers |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
46
Performance measures
Costs
Time
Quality
Environmental impact
Revenues – How?
Levers for Improved Supply Chain Performance
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall
12 - 47
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
47
Revenues
Improved quality
Improved customer service
Perfect orders (on-time + complete + billed accurately
Lower costs leading to lower prices
Efficient behaviors (order as we make from where we make)
Levers for Improved Supply Chain Performance
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall
12 - 48
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
48
Solved Problem 1
Eagle Electric Repair is a repair facility for several major electronic appliance manufactures. Eagle wants to find a low-cost supplier for an electric relay switch used in many appliances. The annual requirements for the relay switch (D) are 100,000 units. Eagle operates 250 days a year. The following data are available for two suppliers. Kramer and Sunrise, for the part:
| Freight Costs | ||||||
| Shipping Quantity (Q) | ||||||
| Supplier | 2,000 | 10,000 | Price/Unit (p) | Carrying Cost/Unit (H) | Lead Time (L)(days) | Administrative Costs |
| Kramer | $30,000 | $20,000 | $5.00 | $1.00 | 5 | $10,000 |
| Sunrise | $28,000 | $18,000 | $4.90 | $0.98 | 9 | $11,000 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Solved Problem 1
The daily requirements for the relay switch are:
100,000/250 = 400 units
d =
We must calculate the total annual costs
for each alternative:
Total annual cost = Material costs + Freight costs + Inventory costs + Administrative costs
= pD + Freight costs + (Q/2 + dL) H + Administrative costs
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Solved Problem 1
Kramer
Q = 2,000:
Q = 10,000:
The analysis reveals that using Sunrise and a shipping quantity of 10,000 units will yield the lowest annual total costs.
Sunrise
Q = 2,000:
Q = 10,000:
($5.00)(100,000) + $30,000 + (2,000/2 + 400(5))($1) + $10,000
= $543,000
($5.00)(100,000) + $20,000 + (10,000/2 + 400(5))($1) + $10,000
= $537,000
($4.90)(100,000) + $28,000 + (2,000/2 + 400(9))($0.98) + $11,000
= $533,508
(4.90)(100,000) + $18,000 + (10,000/2 + 400(9))($0.98) + $11,000
= $527,428
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Solved Problem 2
Eagle Electric Repair wants to select a supplier based on total annual cost, consistent quality, and delivery speed. The following table shows the weights management assigned to each criterion (total of 100 points) and the scores assigned to each supplier (Excellent = 5, Poor = 1).
| Scores | |||
| Criterion | Weight | Kramer | Sunrise |
| Total annual cost | 30 | 4 | 5 |
| Consistent quality | 40 | 3 | 4 |
| Delivery speed | 30 | 5 | 3 |
Which supplier should Eagle select, given these criteria and scores?
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Solved Problem 2
Using the preference matrix approach, the weighted scores for each supplier are:
| Scores | |||
| Criterion | Weight | Kramer | Sunrise |
| Total annual cost | 30 | 4 | 5 |
| Consistent quality | 40 | 3 | 4 |
| Delivery speed | 30 | 5 | 3 |
WSKramer =
WSSunrise =
(30 4) + (40 3) + (30 5) = 390
(30 5) + (40 4) + (30 3) = 400
Preferred
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Solved Problem 3
Schneider Logistics Company has built a new warehouse in Columbus, Ohio, to facilitate the consolidation of freight shipments to customers in the region. How many teams of dock workers should he hire to handle the cross docking operations and the other warehouse activities? Each team costs $5,000 a week in wages and overhead. Extra capacity can be subcontracted at a cost of $8,000 a team per week. Each team can satisfy 200 labor hours of work a week. Management has estimated the following probabilities for the requirements:
| Requirements (hours/wk) | 200 | 400 | 600 | |
| Number of teams | 1 | 2 | 3 | |
| Probability | 0.20 | 0.50 | 0.30 |
How many teams should Schneider hire?
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Solved Problem 3
We use the expected value decision rule by first computing the cost for each option for each possible level of requirements and then using the probabilities to determine the expected value for each option. The option with the lowest expected cost is the one Schneider will implement. We demonstrate the approach using the “one team” in-house option.
One Team In-House
C(200) =
C(400) =
C(600) =
Expected Value =
0.20($5,000) + 0.50($13,000) + 0.30($21,000) = $13,800
$5,000 + $8,000 + $8,000 = $21,000
$5,000 + $8,000 = $13,000
$5,000
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Solved Problem 3
A table of the complete results is below.
| Weekly Labor Requirements | ||||
| In-House | 200 hrs | 400 hrs | 600 hrs | Expected Value |
| One team | ||||
| Two teams | ||||
| Three teams |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
Solved Problem 3
A table of the complete results is below.
Based on the expected value decision rule,
Schneider should employ two teams at the warehouse.
| $5,000 | $13,000 | $21,000 | $13,800 |
| $10,000 | $10,000 | $18,000 | $12,400 |
| $15,000 | $15,000 | $15,000 | $15,000 |
| Weekly Labor Requirements | ||||
| In-House | 200 hrs | 400 hrs | 600 hrs | Expected Value |
| One team | ||||
| Two teams | ||||
| Three teams |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
14-‹#›
010203040506012Days
Order To Payment Cycle Comparison
Order GeneratedOrder AcquiredOrder ShippedOrder Recieved1st Case Moved1st PaymentLast Case MovedLast Payment
Average
Payment
Average
Payment
Chart1
| 1 | 1 | 3 | 1 | 19 | 26 | ||
| 1 | 3 | 1 | 5 | 1 | 5 | 1 |
Sheet1
| non con | consignment | ||
| order genrated | 1 | 1 | |
| order acquired | 1 | ||
| order shipped | 3 | 3 | |
| order received | 1 | 1 | |
| first case moved | 5 | ||
| first EFT payment | 19 | 1 | |
| last case moved | 5 | ||
| last EFT payment | 26 | 1 | |
| total | 51 | 17 |