Capacity

Problem 6.

Crossover / Cost-Volume Analysis

1 Variable Cost, 3 Options

Problem 9.

= 4,500 / 6,500 = 69.23%

Problem 10.

= 6,400 * .88 = 5,632 units

Problem 11.

= 800 / 900 = 88.9%

Problem 12.

= 500 / .85 = 588 sinks/day

Problem 13.

Design = 93,600 * .90 = 84,240

Fabrication = 156,000 * 1.03 = 160,680

Finishing = 64,000 * 1.05 = 67,200

Problem 16.

Productivity Station 1 = 60 / 20 = 3 units/min

Productivity Station 2 = 60 / 12 = 5 units/min

Productivity Station 3 = 4 / 15 = 4 units/min

Bottleneck = slowest productivity = Station 2, 5 minutes/unit.

Throughput Time = sum of station productivity = 3 + 5 + 4 = 12 minutes

Weekly capacity = 12 hrs./day x 5 days/week x 60 minutes = 3,600 minutes

= 3,600 minutes / 5 minutes = 720 units