ME 121 assignment
Question 1 (10 points)
Match the following components to the schematic.
Question 1 options:
|
|
|
Save
Order the correct procedure for wiring the electrical power.
Question 2 options:
|
|
Connect short jumpers (red and green lines in the schematic) to two other terminals 4 |
|
|
Connect the barrel jack to two of the posts on the barrier strip in the switch box. 3 |
|
|
Connect the negative (ground) leads. 2 |
|
|
Connect one switch to each of the positive leads coming out of the barrier strip. 1 |
Save
Compute the avereage of x
Question 3 options:
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
Save
Calculate the standard deviation of x.
Question 4 options:
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
Quiz Submissions - Online Quiz 3 - programming for salinity sensor
Top of Form
Abdulaziz Alhajeri (username: a25)
Attempt 1
Written: Apr 6, 2016 11:39 AM - Apr 6, 2016 12:57 PM
Submission View
Your quiz has been submitted successfully.
|
Question 1 |
|
0 / 10 points |
Match the following components to the schematic.
|
|
|
||||||||||||||||||||||||
|
Question 2 |
|
0 / 1 point |
Order the correct procedure for wiring the electrical power.
|
|
__4__ |
(2) |
Connect short jumpers (red and green lines in the schematic) to two other terminals |
|
|
__3__ |
(1) |
Connect the barrel jack to two of the posts on the barrier strip in the switch box. |
|
|
__2__ |
(4) |
Connect the negative (ground) leads. |
|
|
__1__ |
(3) |
Connect one switch to each of the positive leads coming out of the barrier strip. |
|
Question 3 |
|
10 / 10 points |
Compute the avereage of x
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
Question 4 |
|
1 / 1 point |
Calculate the standard deviation of x.
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
Attempt Score: |
11 / 22 - 50 % |
|
Overall Grade (highest attempt): |
11 / 22 - 50 % |
Bottom of Form