strategic planning
Strategic IT Planning for
Public Organizations: A Toolkit
Adegboyega Ojo, Bimal Pratap Shah
and Tomasz Janowski
May 2009
UNU-IIST Report No. 417 TTTT
UNU-IIST and UNU-IIST Reports
UNU-IIST (United Nations University International Institute for Software Technology) is a Research and
Training Centre of the United Nations University (UNU). It is based in Macao, and was founded in 1991. It
started operations in July 1992. UNU-IIST is jointly funded by the government of Macao and the governments
of the People’s Republic of China and Portugal through a contribution to the UNU Endowment Fund. As well as
providing two thirds of the endowment fund, the Macao authorities also supply UNU-IIST with its office
premises and furniture and subsidise fellow accommodation.
The mission of UNU-IIST is to assist developing countries in the application and development of software
technology.
UNU-IIST contributes through its programmatic activities:
1. Advanced development projects, in which software techniques supported by tools are applied,
2. Research projects, in which new techniques for software development are investigated,
3. Curriculum development projects, in which courses of software technology for universities in developing countries are developed,
4. University development projects, which complement the curriculum development projects by aiming to strengthen all aspects of computer science teaching in universities in developing countries,
5. Schools and Courses, which typically teach advanced software development techniques,
6. Events, in which conferences and workshops are organised or supported by UNU-IIST, and
7. Dissemination, in which UNU-IIST regularly distributes to developing countries information on international progress of software technology.
Fellows, who are young scientists and engineers from developing countries, are invited to actively participate in
all these projects. By doing the projects they are trained.
At present, the technical focus of UNU-IIST is on formal methods for software development. UNU-IIST is an
internationally recognised center in the area of formal methods. However, no software technique is universally
applicable. We are prepared to choose complementary techniques for our projects, if necessary.
UNU-IIST produces a report series. Reports are either Research R , Technical T , Compendia C or
Administrative A . They are records of UNU-IIST activities and research and development achievements.
Many of the reports are also published in conference proceedings and journals.
Please write to UNU-IIST at P.O. Box 3058, Macao or visit UNU-IIST’s home page: http://www.iist.unu.edu, if
you would like to know more about UNU-IIST and its report series.
G. M. Reed, Director
P. O. Box 3058
Macau
Strategic IT Planning for
Public Organizations: A Toolkit
Adegboyega Ojo, Bimal Pratap Shah
and Tomasz Janowski
Abstract This report serves as a toolkit to guide Information Technology (IT) Managers in carrying out
strategic IT planning in government organizations. It presents process models and detailed
descriptions of the various activities and tasks involved in a typical IT strategy exercise in public
institutions. The report begins by explaining the concept of strategic planning and why it is an
important exercise in achieving organizational-IT alignment. Next, it reviews different models for
strategic planning and subsequently presents a generic process model for Strategic IT Planning guided
by a set of principles. Later, the report describes each step or activity of the IT Strategy Process in
sequence. For each activity, it provides: overview of the step, required inputs, expected outputs, tasks
lists and process diagram, supporting tools, related tasks and general remarks. The strategy
development activity is based on the Balanced Scorecard technique. As tool support for the strategy
process, a set of templates and a strategy management software system which manages elements of IT
strategies resulting from strategy activities have been developed.
Adegboyega Ojo is a Research Fellow at the Center for Electronic Governance - United Nations
University - International Institute for Software Technology (UNU-IIST-EGOV) in Macao, on leave
from the Department of Computer Sciences, University of Lagos, Nigeria where he is a Senior
Lecturer. He has been involved in e-government research and development activities since 2004 at
UNU-IIST as a member of the team working on the e-Macao Project. His research interests include
Strategic IT Planning, Software Infrastructure for Electronic Government, E-Government
Measurement, Ontology, Semantic Interoperability, and Applications of Computational Intelligence.
He holds a doctorate degree in Computer Science from the University of Lagos in Nigeria. He is also
a member of the Computer Professionals of Nigeria.
Bimal Pratap Shah was a Government Fellow and Researcher at the Center for Electronic
Governance, United Nations University - International Institute for Software Technology in Macao
from September 2007 to July 2008.
Tomasz Janowski is the Head of the Center for Electronic Governance - United Nations University -
International Institute for Software Technology in Macao (UNU-IIST-EGOV) and a Senior Research
Fellow of UNU-IIST. Tomasz Janowski is the author or co-author of numerous publications in
Computer Science, Software Engineering and Foundations. He has been a Program Committee
member at many international conferences, supervised a number of international students and staff,
and led several research, development and capacity-building projects. These include the e-Macao
Program to build a foundation for Electronic Government in Macao and the UNeGov.net initiative to
building a global community of practice for Electronic Governance. As part of the UNeGov.net
initiative, he organized many workshops and schools on Electronic Governance in developing
countries. His current research interests include foundations of Electronic Governance, tools and
applications of formal methods, and rigorous development of enterprise software, particularly
software for the public sector. Tomasz Janowski holds a PhD in Computer Science from the
University of Warwick, England, and an MSc in Mathematics from the University of Gdansk, Poland.
Copyright © 2009 by UNU-IIST, Adegboyega Ojo, Bimal Pratap Shah and Tomasz Janowski
Strategic IT Planning Toolkit – Table of Contents
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
i
Contents
1 Introduction ..................................................................................................................................................... 1
1.1 IT and Public Organizations ..................................................................................................................... 1
1.2 What is Strategic IT Planning? ................................................................................................................. 3
1.3 IT and Organizational Strategy ................................................................................................................ 3
1.4 Using this Toolkit ..................................................................................................................................... 4
2 Strategic IT Planning Process ........................................................................................................................ 6
2.1 Conceptual Framework ............................................................................................................................ 6
2.2 Process Specification .............................................................................................................................. 13
2.3 Implementing the Process ...................................................................................................................... 19
2.4 Summary ................................................................................................................................................ 21
3 Planning the Strategy Process ...................................................................................................................... 22
3.1 Getting Commitment and Approval ....................................................................................................... 22
3.2 Analyzing Stakeholders .......................................................................................................................... 23
3.3 Forming the Strategy Team .................................................................................................................... 24
3.4 Scheduling and Mobilizing Resources ................................................................................................... 26
3.5 Summary ................................................................................................................................................ 27
4 IT Strategic Framework ............................................................................................................................... 28
4.1 Reviewing Organization Goals............................................................................................................... 28
4.2 Reviewing IT Mission ............................................................................................................................ 29
4.3 Establishing IT Vision ............................................................................................................................ 30
4.4 Setting IT Goals ..................................................................................................................................... 31
4.5 Summary ................................................................................................................................................ 33
5 IT Capability Assessment ............................................................................................................................. 34
5.1 Business and Organizational Requirements ........................................................................................... 34
5.2 Internal Capabilities ............................................................................................................................... 35
5.3 External Factors ...................................................................................................................................... 36
5.4 Summary ................................................................................................................................................ 37
6 Strategy Development ................................................................................................................................... 38
6.1 SWOT Analysis...................................................................................................................................... 38
6.2 Eliciting Strategy .................................................................................................................................... 39
6.3 Specifying Objectives............................................................................................................................. 40
6.4 Mapping Objectives ............................................................................................................................... 41
6.5 Summary ................................................................................................................................................ 43
7 Strategic Implementation ............................................................................................................................. 44
7.1 Developing Initiatives ............................................................................................................................ 44
7.2 Prioritizing Initiatives ............................................................................................................................. 45
7.3 Summary ................................................................................................................................................ 46
8 Strategy Control ............................................................................................................................................ 47
8.1 Strategy Monitoring ............................................................................................................................... 47
8.2 Strategy Evaluation ................................................................................................................................ 48
8.3 Summary ................................................................................................................................................ 50
9 Strategy Documentation ............................................................................................................................... 51
9.1 Drafting IT Strategy Document .............................................................................................................. 51
9.2 Obtaining Feedback on Strategy ............................................................................................................ 52
9.3 Revision and Dissemination ................................................................................................................... 52
9.4 Summary ................................................................................................................................................ 52
10 Conclusions .................................................................................................................................................... 53
Bibliography ........................................................................................................................................................ 54
Appendix A: Tools for Strategic IT Planning .................................................................................................. 56
Appendix B: Definitions ..................................................................................................................................... 57
Strategic IT Planning Toolkit – Section 1: Introduction
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
1
1 Introduction This section contextualizes the IT strategy process in the overall development and application of IT in
government organizations. It begins with an explanation of the business of government and nature of
public values as a basis for characterizing the use of IT in the public sector. Next, the section
discusses why IT requirements for public sector are different from those of private organizations. The
importance of strategic planning in general and strategic IT planning in particular is later explained.
The section also explains the relationship between IT and organizational strategies, before closing
with an explanation of the usage scenarios for the toolkit - by individual government agencies and the
whole-of-government.
1.1 IT and Public Organizations
The business of government broadly covers the development of public policies (laws and regulations),
delivery of public services and infrastructure (common good) and maintenance of social order and
security [6]. The performance or effectiveness of a government organization is linked to how well
public values or benefits are delivered in the social, political and economic spheres. It also measured
in terms of the degree to which the core mission and organizational goals are met. The production of
public value entails the conversion of core resources – human, information (or IT), organizational and
financial; to support the internal processes, direct delivery of services to the public and general
interactions with stakeholders [1][8]. We expect that appropriate use of resources in carrying out
internal processes should produce concrete results for the public (e.g. increased customer satisfaction
and fewer complaints from public) and the organization itself (e.g. better control, oversight and
planning capabilities). Customer results in particular should lead to the attainment of some strategic or
policy outcomes - for instance, improved home security or more responsive government. Figure 1
below outlines the value chain for a typical public organization. Detailed discussion on public value
generation can be found in [7].
Figure 1: Value Creation Process in Public Organizations
Strategic IT Planning Toolkit – Section 1: Introduction
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
2
The focus on the strategic value of IT in the public sector has grown with the popular acceptance and
adoption of the new public management (NPM) approach, the Internet and particularly electronic
governance by governments. Today, IT constitutes a major strategic resource in any modern
government enterprise. However, the capabilities in measuring and optimizing concrete public values
and benefits from IT investments by government are still limited, unlike in the private sector.
While the private sector provides significant experience and know-how on value creation from IT for
strategic purposes, transferring such experiences is generally not straightforward or at least direct.
Reasons for this challenge include the differences in the nature of public and private organizations,
their IT needs and mechanisms for effecting and managing the necessary organizational changes
associated with effective IT exploitation [1]. For instance, public-sector organizations largely remain
bureaucratic – vertically organized, with very high need for complex collaborations between its
employees across departments and organizational units [2]. However, private organizations largely
operate more flexible, horizontal, network-oriented structures empowering employees as decision-
makers.
The IT needs of public organizations differ from those of private sector organizations in many
aspects, including planning approach, environmental consideration, cross-organizational
requirements, political consideration, role of competition, target users and constraints of legislation
and supervision. Some of these differences are highlighted below [1]:
1) Planning approach – incremental rather than holistic or rational IT planning processes is required
for developing Public Management Information Systems (PMIS).
2) Cross-organizational requirements – PMIS managers need to consider more cross-organizational
issues due to the intrinsic and complex interdependence of government organizations, than their
counterparts in private sector.
3) ICT resources acquisition – criteria for evaluating and acquiring IT resources for PMIS are
different from those used in traditional Information Systems in private organizations.
4) Political considerations – extra organizational and technical factors such as political factors are
considered in IT-based solutions in public organizations.
5) Competition – IT capabilities are not typically channeled towards competitiveness in the public
sector unlike in the private sector where competition is a primary strategic target.
6) Target Users – IT-enabled services in public organizations are used by a large number of users –
possibly the general public. Unlike private organizations, government seldom limits its field of
action.
7) Supervision – public agencies are usually supervised by external bodies (oversight agencies),
private citizens and peer agencies. This raises specific organizational and functional requirements
such as production of specific reports in some fixed formats. These obligations are not typical of
private organizations.
In addition, administrative and business processes in public organizations strongly depend on
legislations. IT-enabled services implementing these rules in government are affected by changes in
regulations. Information systems in private organization are typically not closely tied to government
regulations operationally and do not have to evolve their behaviors frequently [6].
Strategic IT Planning Toolkit – Section 1: Introduction
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
3
The IT environment for public organizations typically includes [3] [4]:
o ICT infrastructure – hardware and networking infrastructure and system software at the agency
o Supporting systems – consists of productivity tools and applications supporting core support services (or processes) such as human resource management, knowledge management,
planning, project management, help desk management, etc.
o Back office applications – PMIS supporting business processes and operational activities
o Electronic service delivery technologies – technologies deployed for the delivery of electronic services to the public through channels such as web, kiosk, phone and mobile devices
1.2 What is Strategic IT Planning?
For any organization to derive strategic values in the short-term, mid-term and long-term from its IT
investment, a sound IT strategy is required. Such IT strategies are outputs of strategic IT planning.
Unlike tactical or project plans which focus on detailed operational, day-to-day actions; strategic
planning in an organization involves making decisions about desired future outcomes, how the
outcomes will be achieved and how success will be measured and evaluated [16]. Strategic planning
is an overall planning process which essentially provides answers to questions related to: the identity
of the organization, the existing capacity, the current situation and the problems to be addressed, the
critical issues requiring response and how resources should be prioritized and allocated [13]. Strategic
planning horizons are typically between 3 to 5 years, with the possibility of periodic (usually annual)
reviews.
Strategic IT planning establishes a clear vision and measurable objectives for the use of IT in an
organization, prescribes strategies to achieve this vision with the knowledge of the available IT
capabilities and opportunities, provide measures for success and possibly suggests concrete initiatives
for implementing the developed strategies. It improves key stakeholders’ understanding of IT
opportunities and limitations, assesses current performance, identifies human resource requirements,
and clarifies the level of investment required. Strategic IT planning generally serves as a mechanism
for managing and directing all IT resources in line with organizational strategies and priorities [22].
The need for strategic IT planning in a public organization could be triggered by an anticipation of, or
reaction to major strategic initiatives - such as reforms or reorganization programs. It may also be a
response to doubts about the return on IT investments, perception of poor IT organization or unclear
direction for IT by users and core business units of the public organization.
1.3 IT and Organizational Strategy
Implicit in qualities of an effective strategic IT plan is the direct support it provides for organization’s
mission, strategies and activities [12]. In general, IT strategies must be aligned with organizational
strategies. Strategic IT alignment enables IT to support business strategies, and business strategies to
leverage opportunities generated by IT strategies [9]. Strategic IT alignment is an organizational
learning process that combines business and IT knowledge to support business objectives [10].
Senior management in private organizations generally considers investment in IT as potentially
strategic to business success [21]. This position is supported by research results in Information
Systems which suggest that achieving strategic alignment between business and IT is essential to
improving organizational performance [15].
Strategic IT Planning Toolkit – Section 1: Introduction
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
4
Specific results from a strategic IT alignment activity include [18]: direct IT support for the
achievement of business objectives; proportional increase in IT expenditure; delivery of IT services at
competitive cost; improved business productivity and customer experience with increased IT
investment; availability of proper processes; practices and controls; managed business and technology
risks; development of professional competence for service delivery and continuous performance
improvement by exploiting organizational knowledge.
A sound strategic IT planning process is expected to guarantee strategic IT alignment.
1.4 Using this Toolkit
This toolkit is designed and written for IT practitioners in government or public organizations, as a
detailed guide (or reference for experienced IT managers) for planning and implementing strategic IT
planning. Secondly, the toolkit provides a framework for developing specific standards for Strategic
IT planning in government or public agencies. Thirdly, the toolkit could serve as a courseware for
strategic IT planning.
Figure 2: Toolkit Map
As a manual, the toolkit provides detailed information on each step of the strategy processes with
clear instructions on implementation of these steps (practice guidelines) and how to use available
supporting tools. As a framework for developing specific standards, the toolkit specifies core set as
well as optional activities for the IT strategy process. As a courseware, it provides an overall process
model for strategic IT planning, and sub-processes for all major process steps with reference to
Strategic IT Planning Toolkit – Section 1: Introduction
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
5
relevant tools. The discussions on the conceptual framework and specific techniques for process steps
also make the toolkit a useful courseware. The overall organization of the toolkit is shown in Figure 2
below.
To support the use of this toolkit, a set of templates have been developed to be used in implementing
major steps of the IT strategy process. The templates “Strategic IT Planning for Public Organizations:
Templates” is available from the Outputs page at http://egov.iist.unu.edu. A Strategy Management
System has also been developed to support the development, management and strategic alignment of
IT strategies based on the framework presented in the toolkit, which is also available through the
Outputs page at http://egov.iist.unu.edu.
The toolkit is made available publicly under the Creative Commons Attribution-Share Alike 2.0
Generic License Please see http://creativecommons.org/licenses/by-sa/2.0/ for more information on
the toolkit license.
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
6
2 Strategic IT Planning Process
This section explains the overall IT strategy process or framework. A conceptual framework is first
provided to guide the development of the process. The conceptual framework considers generic
strategic planning models and identifies the essential steps of a strategic planning activity. Next, a
generic IT strategy process model is presented based on a set of guiding principles and requirements.
Following this, the overall implementation framework for the generic IT strategy process is explained.
Prescriptions for concrete process implementation are guided by – the Control Objectives for
Information and related Technologies (COBIT) IT Governance Framework, Balanced Scorecard
method, and the Logic Model for planning and evaluation. Available tools for supporting the overall
IT strategy process are also identified.
2.1 Conceptual Framework
Planning is a management activity involving the anticipation or specification of some future needs,
deciding or selecting strategies and procedures to meet these needs, informed by the analysis of
internal and external information on an organization. In essence, planning chooses who, what, how,
and where with respect to the attainment of a goal. More formally, planning is a formalized procedure
to produce articulated results in the form of an integrated system of decision [16].
A strategy is a long term plan of action affecting the overall direction of an organization. It is a plan
from which other plans like detailed operational plans can be developed.
Strategic planning is a disciplined effort to produce fundamental decisions and actions shaping the
nature and the direction of an organization. It is a continuous and systematic process in which
decisions are made about intended future outcomes (3 - 5 year horizon) how the outcomes are to be
accomplished (based on the analysis of internal capabilities and external trends) and how success is
measured and evaluated [16].
2.1.1 Strategic Planning Models
Several process models have been proposed and used for strategic planning. Eight of these models
are briefly explained below with emphasis on their distinguishing features:
1) Model A - specifies the following four features for a typical strategy process [14]: providing detailed ac-count of the entities in an organization and their interaction with the environment,
addressing the allocation of resources (capital, labor and capacity), focusing mainly on long-term
issues, but not neglecting short term issues with long-term consequences, involving middle-to-top
level management and executive decision makers. This model does not prescribe a particular
process, but identifies important properties of strategy processes.
2) Model B – identifies six major phases for a strategy process [13]: planning the process; understanding the context; vision, values, and mission discussion; review of strength, weakness,
opportunities and threats, discussion of strategic options and goals; and organizational structure.
This model emphasizes the need to plan the strategic planning process, involve the stakeholders in
establishing and agreeing on the context – existing problems and issues, for the planning exercise.
3) Model C – describes a seven-step process [11]: mission, vision, critical success factors, assessment of the present, strategic objectives, tactics and action plan. This model is differentiated
from most of the other models reviewed here in terms of the inclusion of identification of strategic
imperatives or critical success factors and development of tactics from strategic objectives.
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
7
4) Model D - specifies the following steps [16]: plan to plan; mission, goals and values; strategic objectives; external analysis; internal analysis; strategic options; strategy selection; strategy
implementation and strategy control. This model includes the analysis of external environment
and also indicates the need to plan the strategy process.
5) Model E - includes the following as follows [16]: agreement on planning effort; identification and clarification of political and statutory mandates; development and clarification of mission and
values; external environmental assessment, internal environmental assessment; strategic issue
identification; strategic development; and vision of successes. This model like Models B and D
indicates the need to plan the process. It also highlights the need for identification and
clarification of political and statutory mandates – a point more relevant to public organizations
than private ones.
6) Model F - suggests an eight-step process [16]: plan to plan; mission, goals and values; external needs and trends assessment, strategic objectives; outcome measures; strategic priorities;
strategies; and performance feed-forward. This model is very similar to Model D, but indicates a
clear specification of the expected outcomes. It also includes a step that allows a comparison of
actual organizational performance and planned organizational performance (feed-forward
performance) in previous strategic planning cycles in order to reinforce positive strategies and
abandon negative ones.
7) Model G - presents a seven-step process [16]: mission of the organization; current demand system; current response system; future demand system; desired future state; action planning;
feasibility; cost-effectiveness and consequences of action. This model is a stakeholder-centric
planning model which develops strategies by examining the current demand from stakeholders,
how the organization is responding to these demands and the projected demand system. Like
Model F, it includes a step for clarifying expected outcomes.
8) Model H - consists of the following steps [16]: goal formulation; environmental analysis; strategy formulation; strategy evaluation; strategy implementation, and strategy control. Unlike most
models, this model includes a step for specifying how implemented strategies will be monitored
and controlled.
Table 1 provides a summary of the eight planning models.
2.1.2 Generic Strategy Process
Almost all process models considered agree on the inclusion of the following steps in a strategy
process:
1) Specification of mission, vision, desired future state or outcomes;
2) Assessment of internal and external environment;
3) Development of strategies and
4) Specification of tactics or initiatives to implement strategies.
Establishing a plan for the strategic planning activity to clarify the purpose, constitute the strategy
team, obtain commitment from stakeholders on cooperation, participation and resources is essential
particularly in the context of public organizations. Clarification of political and statutory mandates
would also be a useful task in the preparatory phase of the planning process.
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
8
Table 1: Strategic Planning Models
Model A Model B Model C Model D
1) detailed assessment
2) resource allocation
3) long-term issues
4) top manager involvement
1) planning
2) understanding context
3) vision, values and mission
4) SWOT analysis
5) strategic options
6) organizational structure
1) mission
2) vision
3) critical success factors
4) assessment
5) strategic objectives
6) tactics
7) action plan
1) plan to plan
2) mission, goals and values
3) strategic objectives
4) external analysis
5) internal analysis
6) strategic options
7) strategy selection
8) strategy implementation
9) strategy control
Model E Model F Model G Model H
1) agreement on planning effort
2) clarification of political and statutory mandate
3) clarification of mission and value
4) external environmental assessment
5) internal environmental assessment
6) strategic issue identification
7) strategic development
8) vision of success
1) plan to plan
2) mission, goals and values
3) external needs and trends
4) strategic objectives
5) outcome measures
6) strategic priorities
7) strategies
8) performance feed-forward
1) mission of organization
2) current demand system
3) current response system
4) future demand system
5) desired future state
6) action planning
7) feasibility
1) goal formulation
2) environmental analysis
3) strategy formulation
4) strategy evaluation
5) strategy implementation
6) strategy control
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
9
The inclusion of tasks that enable the management and control of developed strategies in the planning
process should also be useful. In addition, the ability to leverage data generated from previous
planning cycles (performance feed-forward) in the process should result in a more intelligent planning
process.
We include two basic additional steps to the initial four steps identified above:
1) planning the process
2) strategy control
Consequently, the generic strategy process will include the following six steps: planning the process;
specification of mission, vision, desired future state or outcomes; assessment of internal and external
environment; development of strategies; development of tactics or initiatives; and strategy control.
For simplicity all process models have been enumerated sequentially (e.g. in Figure 3). In practice,
these processes seldom proceed in linear or sequential manner due to the need for iterations over some
steps and feedback loops.
Figure 3: Generic Strategy Process
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
10
A simplified but representative process for strategic planning is provided in Figure 3. A
comprehensive plan for the whole process and the necessary commitment is first secured by the
strategy team. In the strategic framework task, the mission of the organization or project is established
or clarified, and the vision, desired future outcomes and goals are specified. Major stakeholders are
also identified in the strategic framework phase which drives the whole planning process. While
developing the strategic framework, a detailed assessment of the internal and external environment of
the organization (with respect to the purpose of the planning exercise and goals) could commence.
The outcome of the assessment and strategic framework phase provide input for the strategy
development phase. The strategy development phase involves carrying out SWOT analysis,
identifying critical success factors, and developing relevant set of concrete strategies to achieve set
goals in view of constraints and opportunities.
Concrete initiatives are defined from the developed strategies as an implementation plan. A
framework for measuring performance of initiatives and projects (resulting from initiatives) is
developed in the strategy control phase to provide necessary feedback information for strategy
evolution and management. The output of the strategy control task is one of the inputs to the strategy
development process.
We specialize this process for strategic IT planning in the next section.
2.1.3 Strategic IT Planning Process
A strategic IT planning process aims to produce IT strategies, concrete IT initiatives and projects to
support organizational needs in order to deliver concrete values to stakeholders. It involves the
development of a strategic IT plan that satisfies (or properly aligns with) the business requirements.
The strategic IT plan is also required to sustain and extend organizational strategy and governance
requirements while being transparent about benefits, costs and risks [22]. Specifically, a strategic IT
plan in a public organization is expected to provide answers to following questions:
o How will IT deliver value to citizens and business and the public at large?
o How will IT support the internal business and administrative processes towards operation excellence?
o How will IT enable the collaboration of the public organization with others?
o How will IT support compliance with regulations governing the public organization?
o How should IT financial be used?
o How will the required IT skill and competences be acquired?
o How will the IT infrastructure be further developed and more optimally utilized?
o How will IT manage operational risk and ensure business continuity?
o How will IT maintain the security of information?
o How will the contributions of IT to the business be measured?
o What structural changes (or organizational changes) are required in the IT organization and the larger organization for value creation and preservation?
In line with the generic process presented in Section 2.1.2, the important features (or underlying
principles) for an effective strategic IT planning process is described below:
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
11
P1. Strategic alignment – strategies developed through the process should explicitly support
organizational strategies. For instance, IT strategies are expected to support any ongoing reform
and restructuring activities in government organizations. Therefore, resulting IT strategies should
be closely aligned with public sector modernization and reform programs. Alignment necessitates
the involvement of stakeholders that are outside the IT organization in the overall planning
process, particularly participants from the core business and support units within the organizations
as well as other central entities involved in modernization and continuous process improvement.
A strategic alignment process would include Business-IT alignment, IT-Business alignment and
stakeholder analysis.
P2. Avoiding strategy gaps – process should minimize or eliminate the gaps in the resulting strategy.
Strategy gaps created through the absence of supporting or complementary strategies necessary to
realize a strategy. For instance, the absence of strategies to ensure the availability of human and
financial resources in an IT strategy creates a strategy gap. The inclusion of strategic alignment
steps in the overall strategy process significantly reduces strategy gaps. Strategy gaps can also be
reduced by ensuring that dependency relationships between the strategies are explicitly specified
through mappings.
P3. Clear measurement framework – the IT strategy process should produce measurable strategic
objectives with clear specification of measures and targets. The metric allows for the management
and control of strategies during implementation. The various targets associated with the objectives
provide concrete benchmark for the IT organization and a basis for revision of the strategies.
P4. Support for core areas – process must ensure that developed strategies support all the major
aspects of the IT organization, for instance, at least one strategy is expected to be specified for
optimizing financial resources keeping up with technology changes and enabling internal business
units leverage appropriately, supporting the delivery of public services to customers, satisfying
regulatory requirements, improving internal IT processes and developing the structures and
processes for IT governance. In addition to these broad categories, a number of specific issues
considered critical by Chief Information Officers (CIO) have been identified as follows
[24][25][26]:
o Security and risk management – making provision to determine the current level of security, creating scenarios to deal with uncertainties and mitigating risks. It also includes defining
appropriate security standards for the organization and ensuring business continuity planning.
o Identity management – establishing correct identity of users to enable improved service delivery, public safety, and interoperability.
o Information management – enable improved management of information and knowledge sharing within the organization to support knowledge-intensive decision processes and
activities.
o Procurement – establishing an efficient process for acquisition of IT assets, products and services.
o Integration and interoperability – support the seamless exchange of information between the agencies in the delivery of one-stop or integrated services.
o Shared services – developing generic services in collaboration with other agencies in implementing core business patterns.
P5. Foundations for Enterprise Architecture – the process must provide the necessary input and
foundations required to build a comprehensive IT architecture, consisting of specifications of
processes; people; technology – network, hardware and software; and strategic objectives and
values for the organization.
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
12
P6. Support for IT Governance - process should directly support the continuous development of
structures and processes towards the development, use, management and control of IT resources
in the agency.
P7. Addressing the budgeting constraints – traditional budgeting is a periodic process whereby
organizations define their forward operational expenditures and forecasted incomes – a top down
process. Several limitations have been identified: budgets constraint responsiveness and flexibility
often constitute a barrier to change. Budgets are rarely strategically focused. Most budgeting
practices strengthen vertical (command and control) structures and do not support emerging
network structures, consequently reinforcing departmental barriers rather than knowledge sharing.
P8. Support for Electronic Governance – we finally constrain an IT strategy process in a public
organization to ensure that resulting strategies and IT initiatives directly support the development
of e-governance.
The development and implementation of the IT strategy process is expected to satisfy the
requirements for the IT Governance Institute’s (ITGI) Level 3 (Defined) maturity level for strategic
IT planning. The ITGI’s five stage maturity model for Strategic IT Planning Process is briefly
described below [22]:
0 - Non-existent: Strategic IT planning is not performed. There is poor management awareness that IT
strategic planning is needed to support agency goals.
1 – Initial or Ad-hoc: The need for strategic IT planning is known by IT organization and agency
management. IT planning is performed on an as-needed basis in response to specific business
requirements. Strategic IT planning is occasionally discussed at IT management meetings. The
alignment of organizational requirements, applications and technology takes place reactively rather
than by an organization-wide strategy. The strategic risk position is identified informally on a project-
by-project basis.
2 – Repeatable but intuitive: Strategic IT planning is shared with agency management on an as-needed
basis. Updating of the IT plans occurs in response to requests by management. Strategic decisions are
driven on a project-by-project basis without consistency with an overall organization strategy. The
risks and user benefits of major strategic decisions are recognized in an intuitive way.
3 – Defined: A policy defines when and how to perform IT strategic planning. IT strategic planning
follows a structured approach that is documented and known to all staff. The IT planning process is
reasonably sound and ensures that appropriate planning is likely to be performed. However, discretion
is given to individual managers with respect to implementation of the process, and there are no
procedures to examine the process. The overall IT strategy includes a consistent definition of risks
that the organization is willing to take as an innovator or follower. The IT financial, technical and
human resources strategies increasingly influence the acquisition of new products and technologies.
Strategic IT planning is discussed at management meetings.
4 – Managed and Measurable: Strategic IT planning is standard practice and exceptions would be
noticed by management. The practice is covered by a defined management function with senior-level
responsibilities. Management is able to monitor the IT strategic planning process, make informed
decisions based on it and measure its effectiveness. Both short-range and long-range IT planning
occurs and is cascaded down into the organization, with updates done as needed. The IT strategy and
organization-wide strategy are increasingly becoming more coordinated by addressing business
processes and value-added capabilities and leveraging the use of applications and technologies
through business process re-engineering. There is a well-defined process for determining the usage of
internal and external resources required in system development and operations.
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
13
5 – Optimized: Strategic IT planning is a documented, living process; is continuously considered in
organizational goal setting; and results in discernible public and organizational value through
investments in IT. Risk and value-added considerations are continuously updated in the IT strategic
planning process. Realistic long-range IT plans are developed and constantly updated to reflect
changing technology and business-related developments. Benchmarking against well-understood and
reliable industry norms takes place and is integrated with the strategy formulation process. The
strategic plan includes how new technology developments can drive the creation of new
organizational capabilities and improve the competitiveness of the agency.
2.1.4 Satisfying Relevant COBIT Control Objectives
COBIT is a best practice IT governance framework – a set of leadership, organizational structures and
processes that ensure that the enterprise’s IT sustains and extends the organization’s strategies and
objectives [22]. It prescribes a set of 34 IT processes and 214 control objectives in four domains –
Planning and Organization, Acquisition and Implementation, Delivery and Support, and Monitoring
and Evaluation. The control objectives for strategic IT planning is specified under the Plan and
Organize domain or high-level process - the first activity area. The following six concrete control
objectives are specified for the “Define a Strategic IT Plan” (P01.1) sub-process [22]:
O1) IT Value Management – process should involve management and senior executives to ensure
that all projects in Agency IT portfolio have sound business cases.
O2) Business-IT Alignment – process should align and integrate business strategies and objectives
with IT goals including mediating between business and IT imperatives so that priorities can be
agreed.
O3) Assessment of Current Capability and Performance – process must assess the current capability
and performance of solutions and service delivery to establish a baseline against which future
requirements can be compared.
O4) Strategic IT Plan – process must create IT strategies that define, in cooperation with relevant
stakeholders, how IT goals will contribute to the agency objectives particularly in areas related
to public service delivery. The IT Strategic plan should cover investment/operational budget,
funding sources, sourcing strategy, acquisition strategy, and legal and regulatory requirements.
It should be sufficiently detailed to allow for the definition of tactical IT plans.
O5) Tactical IT Plan – process should support the creation of a portfolio of Tactical IT Plans from
the developed IT Strategic Plan. The tactical plan would describe the IT initiatives, their
resource requirements, and how the use of resources and accomplishments of benefits will be
managed. Tactical plans should be detailed enough to allow for the definition of projects.
O6) IT Portfolio Management – process could manage with the business the portfolio of IT-enabled
investments programs required to achieve strategic business objectives by identifying,
evaluating, prioritizing, selecting, initiating, managing and controlling programmes.
The above control objectives are adopted to constrain the strategic IT planning process. As a
minimum, the IT strategy process is expected to satisfy objectives O1 through O5. Control objective
O6 may be realized outside the IT strategy process.
2.2 Process Specification
The process for developing a strategic IT plan deriving from the generic process model and
supporting the features discussed in section 2.1.3 is specified here. While describing the process
features, cross-references to the principles presented in Section 2.1.3 are indicated.
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
14
A1. Planning the process
The activity is aimed at obtaining the required commitment from establishing a business case for the
planning project (if it is not already institutionalized), obtaining the necessary commitment from
management and stakeholder, putting together the IT Strategy Team, mobilizing the necessary
resources, and providing a schedule for the whole exercise.
T1.1. Obtaining Commitment and Approval – The first step of the overall planning process is for the
IT organization to establish a sound business case for strategic IT planning to the management of the
agency. This is particularly important in public organizations in which the practice of strategic
planning in general is seldom carried out. A successful completion of this task entails obtaining
management approval and commitment to providing the necessary support to the IT organization; in
particular championing the exercise and seen as the owner and sponsor of the project.
T1.2. Stakeholder’s Analysis – Once the approval and commitment is obtained, the IT organization
needs to determine the important stakeholders and their roles in the overall process. Stakeholders are
generally required to participate in some of the planning tasks or supply critical information as input
for these tasks. Required information includes organizational strategy, specific business requirements
and drivers for IT in the agency and expectations regarding IT services. The output of this task is the
identification of the major stakeholders, their specific roles, communication plans for each
stakeholder category and notification to these stakeholders explaining the purpose of the exercise and
their sought contributions.
T1.3. Strategy Team Formation – The strategy team consists of IT organization head, a senior
management officer (preferably the deputy head of the agency), and other persons representing
different stakeholders categories such as employees, heads of core business units, representatives of
different customer categories (e.g. citizens and businesses). The stakeholder’s analysis in Task T1.2
provides a valuable input into the team formation task. Once the composition of the team is
determined and team members agree to their participation, the terms of reference (TOR) for the team
is established in their inaugural meeting. The output from this task is a team list and the TOR for the
strategy team.
T1.4. Scheduling and Resource Mobilization – After team composition with clear TOR, the team
needs to draw the schedule for the planning exercise and secure the necessary resources (materials,
human and financial) for completing the exercise. This task ends with a clear schedule, specification
of the resource requirement and approval by management on providing the resources.
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
15
Figure 4: IT Strategy Process
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
16
A2. IT Strategic Framework
The IT strategic framework clarifies the mission of the IT organization, establishes an IT vision and
sets some concrete IT goals in line with vision. The strategy team establishes the strategic framework
through workshops and brainstorming sessions involving representatives of stakeholders. This activity
guides the rest of the planning process by specifying the desirable strategic outcomes for IT
organization.
T2.1. Reviewing Organization Goals – The first task in defining the strategic IT framework is gaining
an understanding of organizational vision and goals of the agency. These organizational goals
provide concrete business constraints to satisfy or requirements for the IT organization to fulfill. The
mission, vision and goals of the IT organization therefore derive from the organizational goals.
T2.2. Reviewing IT Organization Mission – The clarification of the mission for the IT organization is
necessary for stakeholders to determine the adequacy or relevance in view of present needs and
realities. In most government agencies and departments, IT unit are seldom provided the same level of
strategic position in the overall organizational structure as the core business units. In addition, unlike
in the core business units (say the Taxation Department in a Ministry of Finance), where the functions
are tied to some regulations, IT units as a traditional support unit assume less formal structures with
less stringent regulatory constraints. This somehow provides great deal of flexibility in shaping the
vision of IT organization, without the fear of official approval for such changes. Even with the
increasing emphasis on IT governance which imposes specific responsibilities with the IT
organization (e.g. the Sarbanes Oxley Act) in both public and private organizations, the bureaucracy
in adjusting the mission of the IT units is far less complex than those of core units. The outcome of
this task is an operational mission for the IT organization understood by all stakeholders.
T2.3. Establishing IT Vision – Following the review of the mission, the strategy team articulates an IT
vision specifying the expected outcomes of the use of IT in the agency by stakeholders. Through a
workshop session, the shared vision is negotiated to reflect the collective views of stakeholders in line
with existing organizational strategy and business requirements. The output from this task is an agreed
IT vision for the IT organization.
T2.4. Setting Strategic IT Goals – To concretize (or operationalize) the IT vision, the strategy team
expounds the vision statement to obtain a coherent set of goals addressing different strategic aspects
of the IT organization (Principle 4). For instance, the vision statement is expanded to show the
desirable outcomes in the area of internal capabilities and growth of the IT organization, support for
core continuous improvement of core administrative and business processes, continuous optimization
of IT processes and governance in general (Principle 6), support for the delivery of services to agency
customers (e-government – Principle 8), use of IT budget etc. The outcome of this task is a set of
goals from which specific IT strategies will be developed.
A3. IT Capability Assessment
In view of the vision and goals to be achieved by the IT organization, this activity establishes the
existing IT capabilities of the agency including the specific requirements and drivers for IT within the
agency. The assessment activity also includes benchmarking the IT organization with similar
organizations outside the agency and noting the prevailing technological trends vis-à-vis their
potential uses in the agency. The outcome for this activity provides a sound foundation for the
development of the Enterprise IT Architecture (Principle 5).
T3.1. Business Requirements and Organizational Strategy – This task aims to determine specific and
more operational requirements for IT within the agency (more concrete compared to IT goals set in
Task T2.2). These requirements are aligned with the stated goals and are part of the checklist for the
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
17
assessment activity. These requirements are supplied by the core business and support units. To
properly align technology strategy with organizational strategy, the organizational strategy for the
agency must be reviewed and crafted as part of the business requirements (Principle 1). The strategy
team employs various kinds of instruments (interview, observation, questionnaires etc.) to produce a
clear list of business requirements for IT.
T3.2. Internal capabilities – To satisfy the goals and business requirements, the IT organization must
possess some level of capabilities in terms of human, processes, services, and technology base.
Therefore, the strategy team is expected to assess the available IT skills and competences, the
adequacy of IT processes (particularly considering specific IT governance requirements), quality of IT
services to internal users and agency customers (while delivering services), available technology
infrastructure in terms of networks, hardware equipments and software (applications, system software,
data and knowledge bases etc.). The output of this task is a comprehensive record of each element of
the IT capability.
T3.3. External opportunities and Benchmarks – For the competitiveness of the agency and to allow
the IT organization leverage emerging technologies opportunities and best practices in similar
organizations, it is highly recommended that strategy team carries out an external assessment to
complement the internal one. The strategy team is expected to produce as output of this task
benchmark reports on IT organizations in similar agencies within the same public administration (PA)
or in other PAs. A brief survey of trends in technology relevant to some of the goals and business
requirements of the agency could also be produced.
A4. Strategy development
This activity is the heart of the whole strategy process since it involves the development of required
strategies to satisfy the goals, organizational strategy and business requirements and at the same time
considering best practices and external opportunities. It starts with an analysis of the IT Capability
Assessment results in view of the strategic framework to determine the strength, weaknesses,
opportunities and threats (SWOT) of the IT organization. Strategies are determined based on the
results from SWOT analysis and later refined into more concrete objectives. Finally the objectives are
related through dependencies between them.
T4.1. SWOT Analysis – This task analyses the results from IT capability assessment activity (outputs
of Tasks T3.1, T3.2 and T3.3) to establish the adequacy of available capability with respect to the IT
goals, organizational strategies, business requirements and major strategic areas. The analysis
determines for the major IT goals and business requirements, the strengths, weaknesses, opportunities
and threats of the IT organization. Strength relates to internal factors which enable the IT organization
in achieving desired outcomes while weaknesses are internal factors that reduces the chances of the IT
organization in achieving its goals. Opportunities are external factors (corresponding to strengths)
which the IT organizations could leverage towards achieving its goal, while threats are external
opportunities that the IT organization must mitigate to achieve its goals. The strategy team in
collaboration with relevant stakeholders will produce a SWOT analysis table spanning all IT goals
and core requirements as the major output for this task.
T4.2. Strategies elicitation – Based on the SWOT analysis results, IT strategies are developed to
leverage strengths and weaknesses and address weaknesses and threats, towards the attainment of
specific goals. As much as possible, developed strategies are to be associated with one or more goals.
The strategy team produces as output of this task a table of strategies to support each strategic goal
based on SWOT analysis results.
T4.3. Strategy Refinement into objectives – To make IT strategies more concrete, the team produces
specific objectives from the IT strategies in terms of specificity, extent, target, and timeline for action.
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
18
Specifically, specific measures and corresponding targets (Principle 3) are defined for each objective.
The team is expected to produce a table of strategic IT objectives, with each objective associated with
one or more strategies. The task is also expected to produce an IT Scorecard for the agency.
T4.4. Mapping objectives – Finally, to complete the strategy development activity, a set of annotated
dependencies must be established between the developed strategic IT objectives. These relationships
are provided to reduce strategy gaps (Principle 2) in the developed IT strategy and objectives. IT
Strategy maps can be derived automatically from the IT objectives. The strategy team is expected to
produce an IT Strategy Map at the end of this task.
A5. Strategy Implementation
Once IT strategies and objectives are developed, concrete IT initiatives required to implement the
strategies and objectives are to be determined. Through this activity, the strategy team develops these
initiatives, establishes a rational priority for their implementation considering available resources and
specifies the requirements for each of the initiatives.
T5.1. Determining Initiatives – For each of the strategic IT objectives defined in Task 4.3, the strategy
team determines the set of initiatives or projects to implement or achieve each objective. Each
identified initiative includes a description, the proposed period (immediate or short, medium or long
term), the major stakeholders involved (possibly external agencies or stakeholders) and their
responsibilities, expected outputs from the initiative, and the resource requirements. The team is
expected to produce a table of initiatives from this task.
T5.2. Prioritization of initiatives – Given the dependencies between initiatives (for instance, an
initiative may be required to enable or make feasible other initiatives) as well as resource limitations,
initiatives need to be prioritized based on their urgency (e.g. infrastructure provisioning and training
initiatives), value potentials (e.g. in the area of strategic outcomes, organizational outcomes and
service delivery to citizens), technical feasibility and organizational feasibility. A priority table
showing quantitative and qualitative measures is to be produced by strategy team as an output of this
task.
T5.3. Determining requirements for initiatives implementation – This task provides detailed resource
requirements for priority initiatives for planning implementation. Specification of the human and
materials resources as well as a high level schedule for the initiatives is developed in this task by the
strategy team. The output from this task is a detailed specification of the resources required for
implementing each of the priority initiatives. Since this task involves detailed operational planning, it
could be deferred and implemented outside the IT strategy process. However, when possible, this
information increases the chances for successful implementation of the developed strategies.
A6. Strategy control
Due to implementation issues, a good and sound IT strategy may fail to produce expected outcomes.
A framework to detect such divergence as early as possible is needed to avoid complete failure and
waste. This activity develops a monitoring mechanism for the IT initiatives and uses monitoring
results for the evaluation of the effectiveness and impact of the strategies in the agency.
T6.1. Strategy monitoring – This task entails specifying input and output parameters for each
initiative. These parameters are to be used during implementation in linking the investments on
individual initiatives and the results produced from them. The team is required to produce as the
output of this task a table describing the major input and output parameters for each initiative and the
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
19
expected relationships between these variables. This table should also specify the sources of data for
each parameter and if possible the unit or entity responsible for providing the data.
T6.2. Strategic evaluation – The accumulation and effective exploitation of deliverables or outputs
from initiatives and projects is expected produce the sought outcomes. This task relates the concrete
measures provided for each IT initiatives with the concrete outputs from IT initiatives to establish if
the targets are being met. The output from this task is a framework relating the measures specified for
each objective to variables associated with all initiatives implementing these objectives.
A7. Dissemination
The dissemination activity puts together the outputs of the 6 activities above as strategic IT plan,
circulates and presents the plan to all stakeholders for comments. After obtaining effecting review
comments on the draft, the final draft is published as an official IT Strategy for the agency.
T7.1. Documentation – This task produces the “Strategic IT Plan” document from the outputs of the
Activity A1 through A6 including supplemental reports, for instance by detailing the outputs from the
IT capability and the implementation planning activities. Once the draft report is completed, the
strategy team is expected to present the document to all the major stakeholders of the agency.
T7.2. Comments and Revision on draft – After presenting the draft IT strategy, revision comments are
sought from stakeholders. The team through this task obtains and discusses comments from the
stakeholders and effects the necessary amendments.
T7.3. Dissemination of final version – Following the revision, the final version of the strategy
document is circulated and published publicly a reference to other units. The IT organization is
expected to derive annual and short term plans from the IT strategy document.
2.3 Implementing the Process
We describe in this section, some techniques and frameworks prescribed for implementing the IT
strategy process discussed in Section 2.2. The Balanced Scorecard technique [27] is prescribed for
implementing the strategy development activity, while the Logic Model [19, 20], the World Bank’s
Monitoring and Evaluation Framework for e-Strategies [28] and the US General Accounting Office,
Accounting and Information Division’s Guide on IT Performance Measurement [29] are
recommended for the implementation of the strategy control activity. These implementation
frameworks are briefly explained below and presented in details in latter sections of the toolkit. These
performance frameworks provide a rich set of indicators for starters.
2.3.1 Balanced Scorecard System
A Balanced Scorecard (BSC) is a carefully selected set of quantifiable measures derived from an
organization’s strategy. The scorecard (or the measures) represents a tool for communicating with
employees and external stakeholders the outcomes and performance drivers through which the
organization will achieve its mission and strategic objectives. A Balanced Scorecard also serves as a
strategic management framework which enables the balanced specification of strategies in the
Customer, Internal Processes, Learning and Growth and Financial perspectives. In addition, it allows
for the specification of relationships among strategies in the different perspectives (strategy mapping)
and enables the alignment of short-term actions with developed strategies for effective strategy
implementation.
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
20
As an implementation framework for the strategy development activity, the BSC system assures a
balanced approach to strategy development. For instance, strategies developed is expected to cover
the different complimentary perspectives; including stakeholders, customer, internal processes and
financial perspectives. The BSC system also guides the refinement of strategies into strategic
objectives, minimizes strategy gaps through strategy mapping and provides a sound basis for
performance measurements at strategic and operational levels of the organization.
Specifically, the IT Balanced Scorecard system provides goals, strategies, objectives and measures in
terms of (i) how IT meets enterprise needs, including at program and project levels, (ii) how IT
satisfies the needs of customers, (iii) fulfilling internal IT processes and (iv) accomplishing IT
innovation and learning [29].
Comprehensive information on Balanced Scorecard for the Public Sector is provided in [28].
2.3.2 Logic Model Technique
The Logic model is a general framework for both program planning and evaluation which describes
the logical linkages among program resources, activities, outputs, audiences, short-, medium- and
long term outcomes related to a specific problem or situation [19]. The models illustrate the sequence
of cause-and-effect relationships. The logic model consists of the following major components:
situation description, input specification (what is invested), activities (what is done), output
specification (what is produced), outcome specification (what is achieved) and external factors
specification (what are the external influences and related programs).
In the context of the IT strategy control, the Logic model allows us to: (i) clearly specify desirable
outcomes in the short, middle and long terms, (ii) specify IT-related measures at the input, output and
outcome levels, and (iii) link these measures. Input covers time, money, partners, equipment and
facilities. Output covers
Though, the logic model is largely applied to program level assessment, there are clear
correspondences between the Balanced Scorecard System and logic model framework. For instance,
the Financial and Organizational learning and growth perspectives of the BSC are classified as inputs
in the logic model, while the internal processes in the BSC are activities and outputs. The customer,
stakeholder of the BSC can be mapped to the outcomes component of the logic model (long term).
Detailed information on the logic model is provided in [19] and [30].
2.3.3 Monitoring and Evaluation Tool for E-Strategy
The Monitoring and Evaluation Framework for e-Strategy presents a simple framework to identity,
track, monitor and evaluate various policy goals, strategic priorities, key initiatives and actions
constituting an e-strategy or IT strategies in general. The framework tracks and measures deliverables,
outputs, outcomes and impacts for actions, initiatives, strategic priorities and policy goals
respectively. The framework also suggests exemplar indicators and probable data sources for specific
policy goals (in areas including ICT infrastructure, ICT Sector and Electronic Government) and
corresponding strategies, initiatives and actions.
Detailed information on the monitoring and evaluation framework is presented in [27].
Strategic IT Planning Toolkit – Section 2: Strategic IT Planning Process
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
21
2.3.4 IT Investment Performance Measurement Guide
The executive guide for Measuring Performance and Demonstrating Results of Information
Technology Investments was developed by the Accounts and Information Management Division of
the General Accounting office, United States. The Guide explains how to carry out IT Performance
Management in public organizations. It prescribes the following five major steps in developing an IT
performance system – following an IT “Results Chain”; following a balanced scorecard approach,
targeting measures at decision-making levels, building data collection/analysis capability and
improving IT processes.
The guide provides example measures for each generic strategic IT goals such as achieving the
strategic needs of the enterprise, satisfying the need of individual customers, addressing internal IT
business performance and addressing innovation and learning.
More information on the guide is provided in [30].
2.4 Summary
This section provides an over-arching framework and context for the remaining sections of the toolkit.
It discusses the generic strategy processes and explains some principles underpinning the strategic IT
planning process prescribed in the toolkit. The chapter also explains some major implementation
frameworks such as Balanced Scorecard for strategy development [28], Logic Model [19], e-Strategy
Performance Monitoring and evaluation framework [27] and the GAO’s AIMD Performance
Management Framework for IT investments [29].
Strategic IT Planning Toolkit – Section 3: Planning
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
22
3 Planning the Strategy Process
This section explains how to plan for the overall IT strategy process. It describes the four steps
involved in this activity - from getting management commitment and approval through stakeholders’
analysis to formation of the strategy team and provision of schedule for the exercise as well as
obtaining the requisite resources to complete the process.
3.1 Getting Commitment and Approval
Description: The task commences the overall planning process. It is usually undertaken by the
management of the IT organization as a response to some needs, pressures, inadequacies or emerging
opportunities. The objectives for this step include: providing a business case and justification for
engaging in the exercise; explaining the scope of exercise and expected benefits to management;
clarifying the required support from management and obtaining the approval to proceed with the
exercise. A short proposal or concept note explaining the objectives and expected benefits of the
exercise are required as input for this task. Two major outputs are expected from the process: (i)
explicit written approval by management to proceed with the IT strategy process and (ii) directives to
all units of the agency for cooperation.
Process: The following steps are involved in obtaining the sought approval:
T1) submission of proposal to agency management team
T2) presentation and clarification of proposal (say during management meeting)
T3) evaluation of proposal by top management
T4) issuing approval (or declining support) for exercise
T5) communicating decision to IT organization and heads of core organizational units within the
agency
Figure 5: Commitment and Approval Process
Strategic IT Planning Toolkit – Section 3: Planning
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
23
Figure 5 shows that on approval of the project, explicit directive is issued to all other units of the
agency for cooperation with the IT organization and the strategy team in the execution of the project.
Tools: A template for the preparing a Strategic IT Planning proposal or initiation document is
provided in Section 1 of [33]. The template combines the key components of PRINCE 2 Project
Initiation Document and Business Case Document. Also see the PRINCE 2 Templates and Manual for
more information.
Related Tasks: The output from task will serve as a basis for developing a detailed time and resource
schedule for the exercise (Scheduling and Getting Resources Task).
Comments: For various reasons, management may decline to support or approve the exercise, for
instance due to lack of resources or time. In this case, the exercise is discontinued (at least
momentarily) pending representation or re-evaluation. In the case where strategic IT planning is a
core component of the overall performance management framework for the agency, providing
justification and business case may not be required. However, the resource availability could still
constrain the scope of the exercise.
3.2 Analyzing Stakeholders
Description: Stakeholders for the IT Strategy exercise are actors (persons and organizations) that will
be affected by the Strategic IT Planning exercise or affect (positively or negatively) the attainment of
the goals for the planning exercise. They include the management of the agency, core business units,
major support units, representatives of customers (citizens, businesses and other agencies),
intermediaries, suppliers, employees of the agency, etc. The purpose of this task is at least three fold:
(i) to establish the scope of the strategic planning exercise, (ii) gather and analyze information on
stakeholders to determine whose interest should be prioritized in the IT strategy to be developed, (iii)
to ensure that the planning exercise covers the interest of all major stakeholders - both internal and
external stakeholders. The input to the process is a complete list of stakeholders for the IT
organization. The output consists of (i) a profile of each stakeholder, (ii) specification of roles for the
stakeholders in the exercise and (iii) an initial communication plan for the stakeholder.
Process: the following steps are involved in the stakeholder analysis process:
T1) reviewing stakeholders list
T2) determining required information for profiling stakeholders
T3) designing instruments for data collection
T4) planning data collection on stakeholders
T5) collecting data on stakeholders
T6) analysis collected data
T7) determining roles and priorities for stakeholders interest
T8) drafting an initial communication plan
Figure 6 provides the sequence of the tasks for caring out stakeholders’ analysis. Implicit between
“collect data from stakeholders” and “analyze collected data” is the consolidation of the data gathered
through different information gathering instrument.
Tools: A template for carrying out the above the stakeholder analysis process is provided in Section 2
of [33]. The template provides checklist for stakeholders, information on possible elements of the
Strategic IT Planning Toolkit – Section 3: Planning
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
24
stakeholder’s profile and indicates important criteria to consider when prioritizing stakeholders
interests for the IT strategy process. It also specifies important aspects of a communication plan
suitable for IT strategy process.
Related Tasks: The output from task will guide the composition of the IT strategy team and determine
the sources of information for the rest of the IT Strategy exercise from IT Strategic Framework
activity through IT Capability Assessment to Strategy Development, Strategy Implementation,
Strategy Control activities and Strategy Dissemination activities.
Figure 6: Stakeholder Analysis Process
Comments: The complexity and scope of the IT Strategy exercise plays an important role on the depth
and formality of the implementation process. For instance, in a case where business units are large
and distributed, online questionnaires could be provided for capturing required profile information.
However, in a small agency, direct interaction with stakeholders would definitely be preferred to
obtain such information. Also in communication will be more fluid and easy in small agencies thus
requiring less formal communication plans than in big distributed agencies. Nevertheless, the
stakeholder analysis process is very important in mitigating possible risks arising from conflicts of
interest with respect to stakeholders.
3.3 Forming the Strategy Team
Description: This task constitutes the strategy management team for carrying out the IT strategy
exercise. The team is typically composed of: senior management representative, individuals that
represent the core business units and management of the IT organization. The team’s main
responsibility is to carry out strategy development tasks – collecting and organizing all necessary
information from stakeholders and business units, engaging agency management in strategy sessions,
carrying the necessary environmental assessment tasks, developing concrete strategies and presenting
developed strategies to agency management. The main inputs for forming the strategy team are the
stakeholders’ profile and role produced by the Stakeholder Analysis task. The major output from the
task is a list of IT strategy team members and their respective roles.
Process: This task could be executed with the following sequence of tasks:
T1) short listing team members using stakeholders’ profile and role information
T2) assigning roles to stakeholders within team
Strategic IT Planning Toolkit – Section 3: Planning
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
25
T3) discussing assigned roles with shortlisted stakeholders
T4) dropping unwilling stakeholders and identifying replacements
T5) re-assigning roles as necessary
T6) compiling a list of team members with responsibilities
T7) Review Terms of Reference (TOR) for team with members
T8) Revise and freeze TOR for team
Related Tasks: Once the strategy team is formed and the term of reference agreed, the team can scope
the planning exercise, develop the detailed schedule and secure the required resources for project
execution.
Comments: It is recommended that the size of the team be compact - say between 3 and 10, depending
on the size and scope of the agency. The team leader (possibly with the support of another member) is
expected to facilitate the working of the team. Team members are expected to have deep
understanding of the business of the agency with knowledge and working relationship with major
external stakeholders. In some cases the core team may be expanded (extended team) for data
gathering and processing.
Figure 7: Strategy Team Formation Process
Strategic IT Planning Toolkit – Section 3: Planning
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
26
Figure 7 shows that each stakeholder is consulted in turn to agree on role, while unwilling
stakeholders are substituted using the information provided in the stakeholders table.
3.4 Scheduling and Mobilizing Resources
Description: A detailed schedule for the strategy exercise has to be established before its
commencement. The constituted strategy team is required to secure the required resources for the
activity from various stakeholders and management. The major inputs for this task are (i) the project
initiation document developed by the IT organization which already provides a high level plan and (ii)
information from stakeholder analysis produced during the stakeholder analysis task. The output is a
detailed project schedule (with resource schedule).
Process: The task could be executed through the following steps:
T1) determine degree of involvement of business units
T2) review approach to planning exercise
T3) determine timing for major project activities
T4) draft and communicate plan to concerned units
T5) obtain feedback from units on suitability of plan
T6) review and conclude plan
T7) circulate final project schedule to all stakeholders
Related Tasks: The task provides a schedule that governs the rest of the planning activities. It also
relies heavily on others tasks of the planning exercise, e.g. the commitment and approval and
stakeholder analysis tasks.
Comments: In line with general good project management practices, project risks should be identified,
tracked and managed (for instance poor cooperation or participation from core business units), project
dependencies and tolerances should be determined. In fact, the whole planning exercise is expected to
be carried out within.
Strategic IT Planning Toolkit – Section 3: Planning
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
27
Figure 8: Strategy Team Formation Process
3.5 Summary
This section describes the various steps involved in planning activity of the overall strategic IT
planning exercise from getting the necessary approval and commitment for commencement through
determination of major stakeholders to formation of the strategy team and establishment of concrete
project and resource schedule. This step significantly reduces the risk involved in the whole process.
It also identifies the major aspects of the agency to focus when developing the IT strategy. Two
templates are provided in Sections 1 and 2 of the Templates document [33] for supporting project
initiation and stakeholder analysis tasks.
Strategic IT Planning Toolkit – Section 4: Strategic Framework
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
28
4 IT Strategic Framework
This section explains how the strategic framework for the IT strategy exercise is developed through -
revision of the organizational goals and the mission of the IT organization, obtaining agreement on
the IT vision for the agency and elaboration of the IT vision into concrete goals. This activity is
usually held as a workshop or series of brainstorming sessions involving the strategy team and the
other stakeholders possibly outside the agency.
4.1 Reviewing Organization Goals
Description: The organizational goals for the agency provide a context for the overall IT strategic
framework, since a primary function for the IT organization is to support the major agency objectives.
However, it is not unusual that internal stakeholders, including the IT organization lack a clear
understanding of the organizational goals. Through this task, the strategy team aims to explain the
organizational goals of the agency to all stakeholders as a basis for examining the mission of the IT
organization. The input to this task is the organization strategy for the agency while the output is a list
of priority goals to consider in the IT strategy task.
Process: The following steps could be executed to review the organizational goals:
T1) Identifying and explaining the core aspects of mission statement
T2) reviewing organization vision
T3) reviewing the major goals of the agency in different perspectives (stakeholder, customers, and
public; internal processes and operations; organizational learning; and finance and budget)
T4) Identifying goal elements amenable to IT support
Figure 9: Organizational Goals Review Process
Strategic IT Planning Toolkit – Section 4: Strategic Framework
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
29
Tools: Section 3.2 of Templates [33] provides tables for capturing information related to the review of
the organizational mission, vision and goals of the agency. Goals are classified under the classical
four balanced scorecard perspectives (Customers or stakeholders, internal processes, learning and
growth and financial).
Related Tasks: This task is closely tied to the IT vision and Goal setting activities, which immediately
follows. Identified priority goals are considered are input into the IT visioning and goal setting
exercise.
Comments: The prescribed process assumes that organizational goals exist for the agency. However, it
is not uncommon that public agencies do not have explicit organizational goals or strategies in place
except their mission and vision. In such cases, the management team with the IT strategy team must
articulate some operational goals to guide the development of the IT strategic framework.
4.2 Reviewing IT Mission
Description: In addition to the traditional support role of IT organizations in agency, and the
increasing strategic role of IT in modern government agencies (enabling the realization of strategic
outcomes), there are cases in which the mission of the IT organization extends beyond the boundary
of the agency. Through this task the strategy team clarifies and reviews the mission or purpose of the
IT organization. The input to this task is the mission statement (if it exists) or functions of the IT
organization. The output from the task is an operational mission statement for the IT organization.
Process: The following simple steps are involved in the review of the IT mission:
T1) discussing clarity and adequacy of IT mission statement and functions
T2) modifying statement or functions as required
T3) agreeing on revised IT mission statement and functions
Figure 10: IT Mission Review Process
Strategic IT Planning Toolkit – Section 4: Strategic Framework
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
30
Tools: Section 3.3 of the Template document [33] provides a table for capturing the IT mission
elements and specific functions for validating the IT vision.
Related Tasks: The IT vision is constrained by the mission of the IT organization. For instance, the IT
vision must be achievable within the agreed mission for the IT organization.
Comments: Revision of mission and functions of internal units of agencies may be subject to approval
by higher authorities such as Secretaries and could be time consuming. To avoid this constraint, it is
important that any revision made must not exceed the granted competences of the unit. Thus, a
pragmatic approach to revision of the mission or functions of units is to take such revisions as
“operational” or “administrative” and not formal. Thus, the official or approved mission or functions
still holds while the modified or revised version is used for the exercise.
4.3 Establishing IT Vision
Description: The IT Vision sets the desirable outcomes for the use of IT in the agency to support
organizational vision and goals. Guided by the IT mission, the strategy team and stakeholders
brainstorm in a workshop-style session to articulate a vision for IT. The input to this task is the IT
mission, organizational goals and major business information requirements from business units. The
output from the task is a set of agreed IT vision statements. It is important that the resultant vision is
shared amongst stakeholders.
Process: The following steps are involved in this process:
T1) organizing workshop participants into brainstorming groups
T2) getting individual contributions within teams
T3) consolidating individual contributions within teams
T4) presenting vision statements from teams
T5) agreeing on major IT vision elements across teams
T6) drafting final IT vision statement
Process described in Figure 11 shows that a team leader is selected to facilitate the workings of each
discussion or brainstorming group.
Tools: Section 3.4 of Template document [33] contains a table to document the major elements of the
IT vision under five areas: Organizational mission and programs, Core business processes, IT
processes, IT enabled innovation and learning, IT resources.
Related Tasks: The vision statement produced in task is the major input for the IT Goal Setting Task.
Comments: The IT visioning process must be designed to be participatory and should ensure that
resultant vision is agreed or shared among all participating stakeholders. Team composition should
include members from different backgrounds within the agency to have a near complete perspective
of the entire agency within each of the teams. A few common principles could also be adopted to
guide the overall visioning exercise. For instance, the IT vision should consider issues relating to:
strong partnerships and alliances with other agencies and vendors; leveraging resources and
information; customer-oriented and continuing service process improvements; cost-effectiveness;
return on investment, and business process improvements and consistent policies and standards, using
commonly accepted professional tools and practices to improve quality and efficiency; and attracting
and retaining the most qualified professional staff.
Strategic IT Planning Toolkit – Section 4: Strategic Framework
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
31
Figure 11: IT Vision Process
4.4 Setting IT Goals
Description: This task is one of the most important tasks in the development of the strategic IT
framework since it is the first step in the elaboration of the IT vision. The development of concrete IT
goals from the vision follows a balanced approach in which the IT organization or the strategy team
specifies how IT capabilities will be developed within the agency in different perspectives. These
perspectives include (i) support for organizational mission (corporate contributions), (ii) stakeholder
or customer orientation, particularly in the area of service delivery, (iii) learning and growth (or
innovation), (iv) internal processes (operational excellence) and (v) IT resources (finance and budget).
The major input for the task is the IT vision statement and the major IT needs from core business
units. The output from the task is a list of IT goals in the different perspectives.
Process: The tasks could be carried out as a sequence of the following major steps:
T1) organizing workshop participants into brainstorming groups
T2) getting individuals within groups to identify goals
T3) consolidating individual contributions within teams
T4) presenting IT goals statements for different teams
T5) consolidating and agreeing on IT goals for each perspective
T6) drafting final list of IT goal statement for each perspective
Strategic IT Planning Toolkit – Section 4: Strategic Framework
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
32
Figure 12 shows that the goals for each of the perspectives must be elaborated and agreed by the team.
Tools: Section 3.4 of the Template documents [33] provides a table for specifying the outcome of the
process.
Related Tasks: The major output from this task is the most concrete information to guide the
development of IT strategies.
Comments: In addition to the IT vision elements, information generated from the capability
assessment exercise (next Section) is also useful in developing or elaborating on each of the strategic
areas. Although five strategic perspectives have been proposed and used in this toolkit, agencies could
suitably select other perspective as suitable for their IT needs. What is important is to ensure that the
selected perspectives are complimentary (and possibly balanced).
Figure 12: IT Goals Development Process
Strategic IT Planning Toolkit – Section 4: Strategic Framework
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
33
4.5 Summary
This section presents how the strategy team and other core stakeholders can collectively establish the
IT strategic framework based on the existing organizational strategy (for strategic IT alignment). This
activity must be inclusive as much as possible to result in shared vision and goals. It is also important
that a good knowledge of the existing capability is available to guide the development of feasible or
relatively realistic goals. This implies that the Strategic IT Framework and the IT Capability
Assessment activity could be executed in parallel. Concrete IT goals also enable the assessment
exercise to focus more on areas of interest. The feedback loops from these two activities could be
exploited for more effective results.
Strategic IT Planning Toolkit – Section 5: Capability Assessment
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
34
5 IT Capability Assessment
The section shows how to assess the available IT capability within the agency. It covers three broad
classes of assessment (i) business and organizational requirements, (ii) internal IT capabilities, and
(iii) external factors affecting IT development in the agency. The details of the information to be
obtained under each category are discussed below. Figure 13 presents a generic process for the
exercise.
Figure 13: Generic IT Capability Assessment Process
The three categories of assessment information are to be obtained through a single instrument
(preferably a questionnaire) organized into sections. In addition, as shown in Figure 13, the
assessment proceeds in two major phases, (i) assessment of individual units, and (ii) consolidation of
information about organizational units to obtain agency information. The output from this activity is a
major input for the development of the agency IT Architecture.
5.1 Business and Organizational Requirements
Description: This assessment task examines the business and organizational requirements that the
major units of the agency present for the IT organization. At the unit level, the task documents the
functions, reporting requirements, organizational and services of the unit. Information on services
spans those provided by the unit to third party entities (citizens, business and other government
agencies) and services received from these parties. At the agency level, information on the mission
Strategic IT Planning Toolkit – Section 5: Capability Assessment
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
35
and organizational strategy of the agency are included. The IT strategic Framework activity provides
significant input into obtaining this category of information. The assessment components below
indicate the specific outputs from this assessment task.
Assessment Components: The outputs from this task include detailed information on the following
items:
C1) mission of the agency
C2) specific functions of the agency (or unit)
C3) reporting requirements for the agency (or unit)
C4) IT strategy for the agency
C5) services provided to third party entities (citizens, businesses, visitors and the public in general)
C6) core services and underlying business processes for the agency (or unit)
C7) services received from third-party entities for the agency (or unit)
Tools: Sections 4.2 through 4.4 of the template document [33] covers the assessment of the business
and organizational aspects of IT in the agency (or unit).
Related Tasks: The outputs from the IT strategic Framework activity could be useful in responding to
some of the sought information (for instance mission and specific functions of the agency or unit).
Comments: The task fundamentally reveals elements of the IT strategic framework, the existing
organizational framework and the extent to which IT-enabled services are delivered by agency (or
unit). Noting the interdependency between the IT strategic framework activity and the IT capability
assessment, a concurrent execution of these two activities is recommended (at least partial).
5.2 Internal Capabilities
Description: This task assesses the available IT resources to support the business and organizational
requirements of units and the agency at large. The resources include hardware, software, network,
telecommunication, human and financial resources. The online presence of agency is also reviewed
as part of this task. For infrastructure related elements, the number (e.g. number of PCs or servers)
and specification of the elements are requested, while the various kinds of software (system,
databases, servers, directory, web, user application, etc.) are assessed. In the area of human resource
assessment, the number of IT personnel and their technical competences are determined. In terms of
financial resources, the distribution of the IT budget among recurrent and fixed expenditure and the
major IT resources (human development, infrastructure development) are recorded. The IT officers
and the members of the units provide the required information.
Assessment Components: The outputs from this task include detailed information on the
following items:
C1) hardware resources, including PCs and servers
C2) communication resources, including broadband Internet access, leased lines, VSAT, video
conferencing
C3) software resources, including operating systems, in-house, bespoke and server applications
C4) human resources, including IT personnel/staff ratio, staff/PC ratio, ICT skill inventory
Strategic IT Planning Toolkit – Section 5: Capability Assessment
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
36
C5) financial resources, including recurrent and fixed expenditures, budget
C6) websites, including agency websites, program websites, online information and services
C7) IT Management capabilities, including IT processes, policies and standards, business continuity
and risk
Tools: Sections 4.5 through 4.7 of the template document [33] provides forms for capturing the seven
categories of information listed above.
Related Tasks: The output from this task will be used in developing strategies. These information are
also useful for developing the IT architecture for the agency.
Comments: Strategic IT framework would generally guide the depth of information required in each
of the components of the assessment. For instance, if there are strategic IT goals in the area of training
and capacity building, then the assessment could be required to provide in-depth knowledge of the
ICT skill inventory, existing IT human resources, current spending on IT related training etc.
5.3 External Factors
Description: This task aims to capture information about IT resources and programs outside the
agency which presents both opportunities and challenges to the agency. These include existing
government-wide infrastructure, opinion on public administration reform initiatives and e-government
development projects. In addition, the task could also consider the needs and perception of users or
customers in the delivery of IT-enabled services. The information for assessment may be obtained by
reviewing the technical or IT related services received from external agencies. Additional information
can be obtained by reviewing appropriate IT policy documents.
Assessment Components: The following information items are produced from this assessment task:
C1) IT services received from other agencies
C2) existing government-wide IT infrastructure (e.g. PKI and Identity management services)
C3) IT-enabled public administration reform initiatives
C4) e-government initiatives
C5) perceptions on IT-enabled public services
C6) IT needs of users or agency customers
Tools: Part of Section 4.4 of the template document [33] captures information on C1. Document
review and interview sessions could be used to gather information related to C2 through C6. It is also
possible to have a dedicated questionnaire for capturing user opinions or perceptions on IT services
provided by the agency.
Related tasks: The outcome of this task is essential for the SWOT analysis to be performed as part of
the Strategy development activity.
Comments: This category of assessment could easily be considered less important than other two
categories since it is external to the agency. However, alignment of the IT strategy of the agency with
related government-wide programs could be missing if this task is skipped. In addition, information
on opportunities would also be unavailable without carrying out this assessment.
Strategic IT Planning Toolkit – Section 5: Capability Assessment
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
37
5.4 Summary
Comprehensive assessment of IT capability requires a thorough study of the IT drivers and
requirements within the agency, available IT resources and external factors related to IT development
in the agency. While IT assessment activities in general tend to focus mainly on internal capabilities,
IT requirements and external factors provide the context for analyzing the adequacy of existing
resources. The availability of information on the IT strategic framework for the agency could help in
scoping or determining the areas of emphasis in the assessment. This implies that bi-directional
feedback loop is required between the strategic IT framework and the IT capability assessment
activities.
Strategic IT Planning Toolkit – Section 6: Strategy Development
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
38
6 Strategy Development
This section shows how IT strategies and more concrete objectives can be developed for the various
elaborated goals during the Strategic IT Framework activity. This activity starts with an analysis of
the strength, weaknesses, opportunities and strength of the agency with respect to each of the goals
characterizing the strategic perspectives. Next it develops strategies to implement these goals,
leverage opportunities and strength while addressing weaknesses and threats. IT strategies are refined
into more specific objectives with measurable outcomes and with the relationship between the
objectives specified.
6.1 SWOT Analysis
Description: Based on the information gathered from the Strategic IT Framework and IT capability
assessment exercises, this task aims to analyze the IT situation at the agency. It identifies the
strengths, weaknesses, opportunities and threats related to the attainment of the IT goals for the
agency. Strengths are factors (positive) that can support the agency in achieving its goals, for instance
experienced and motivated staff, possession of advanced skill, availability of resources. Weaknesses
are factors that could prevent the agency in achieving its goal, for instance, poor leadership, shortage
of funds, ill motivated staff. Strength and weaknesses correspond to opportunities and threats when
extraneous factors are considered. For instance, an opportunity for achieving an IT goal could result
from the availability of a government-wide PKI infrastructure. An example of a possible threat to IT
goal such as provision of e-services could be poor e-literacy level of the society. In addition to
eliciting SWOT factors for each of the goals (across all perspectives), possible interaction among
these factors are analyzed (say strength and opportunities or weaknesses and threats) is also carried
out. The main inputs for this task are the IT assessment results and the IT strategic framework. Output
is a clear specification of the SWOT items for goals and (ii) result of the analysis of the SWOT
factors.
Process: The following steps could be carried out to elicit and analyze the SWOT factors:
T1) organizing participants into groups
T2) enumerating SWOT factors for goals over all strategic perspectives
T3) consolidating SWOT factors for each perspective
T4) analyzing SWOT factors
Figure 14 shows the process model for this task. Tasks T2 and T3 are repeated over the strategic IT
perspectives identified earlier.
Tools: Section 5.6 through 5.8 of the Template document [33] provides forms to support the
enumeration of general SWOT factors for the strategic perspectives and specific SWOT factors for
selected IT goals.
Related Tasks: This task relies on the outcomes of the IT assessment and strategic IT framework
activities. Its output provides the basis for the strategy development task.
Comments: The depth of the analysis of the SWOT factors determines the effectiveness of the
emerging strategy. A commonly neglected aspect of analysis is the study of the interaction between
counterpart positive and negative factors (i.e. strength and opportunities versus weaknesses and
threats).
Strategic IT Planning Toolkit – Section 6: Strategy Development
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
39
Figure 14: Balanced SWOT Analysis Process
6.2 Eliciting Strategy
Description: Strategy development follows immediately the SWOT analysis task. Strategies generally
specify what should be done to achieve the major IT goals in view of the available IT capability and
result of the SWOT factors (challenges and opportunities). Each strategy must be associated with a
specific goal or generally with at least one strategic perspective. The major inputs required for
carrying out this task include (i) outcome of the SWOT analysis and (ii) IT capability assessment
exercise. The major output is a set of IT strategies to implement the strategic IT goals.
Process: The following steps are prescribed for developing strategies based on the required
available inputs:
T1) develop strategies to achieve each IT goal
T2) develop strategies to leverage the positive SWOT factors (strength and opportunities)
T3) develop strategies to mitigate the negative SWOT factors (weaknesses and threats)
T4) consolidate strategies for each strategic perspective
Tools: Section 5.9 of the Template document [33] provides tables for recording the IT strategies
associated with specific goals and those generally aligned with strategic perspective.
Related Tasks: This task depends significantly on the IT strategic framework and IT assessment
activities. Its output is refined through the next task in producing concrete IT objectives.
Strategic IT Planning Toolkit – Section 6: Strategy Development
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
40
Figure 15: Strategy Development Process
Comments: The task is the kernel of the strategy development exercise. However, as the process
specifies, the visioning and goal setting sessions as well as the capability assessment exercise provide
foundation for this task. The strategy development process is iterative and incremental as the
introduction of a strategy may necessitate the inclusion of other required or supporting strategies.
Thus, for completeness, the consequences of the strategies should be checked. Strategy development
in general is a complex process which requires sophisticated and subtle human thinking [28]. As
discussed in Section 2, there are other approaches to strategy development than SWOT analysis.
However SWOT analysis remains one of the most popular techniques.
6.3 Specifying Objectives
Description: This tasks aims to operationalize the developed strategies. To operationalize the
strategies effectively, there is the need to refine or further break down the high level strategies and
specify performance measures and possibly the target to attain. Specifically, objectives translate
strategic priorities (which are often vague) into directional and action-oriented statements of what
must be done to execute strategy. Objectives are translated into performance measures. The major
input for this is the developed IT strategy while the output consists of (i) concrete objectives for major
strategies under the different strategic perspectives, and (ii) performance measures for each objective.
Process: the following steps are prescribed for refining strategies into concrete objectives:
T1) prioritize the IT strategies
T2) determine specific actions for each priority strategy across perspectives
T3) specify performance measures for each objective
T4) compile objectives with corresponding performance measures under each perspective
Strategic IT Planning Toolkit – Section 6: Strategy Development
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
41
Figure 16: Strategy Refinement Process
Tools: Section 6 of the template document provides forms for documenting objectives statements with
corresponding measures and target.
Related Tasks: The task is completely dependent on the strategy elicitation task. The output of the task
also is the only required input for the Mapping task described in the next section. This task also
provides the major input (performance measures) for the Monitoring and Evaluation activity.
Comments: Objectives are crafted using action verbs such as: create, initiate, maintain, develop,
devise, excel, build, improve, achieve and identify [28], while strategies are broad statements – with
many possible realizations or implementations. Performance measures provide the mechanism for
tracking the objectives. The target for each performance measure could also be specified, if possible,
to aid the development of initiatives in later stages of the process.
6.4 Mapping Objectives
Description: This task aims to establish cause-and-effect relationships or more generally, dependences
among the strategic objectives developed from the priority strategies. Since the number of objectives
could be large, a set of priority objectives is usually selected as a basis for mapping. Relating the
objectives involve specifying the set of required and supported objectives for a particular reference
objective. The exact nature of dependency between the objectives can be specified on the link. The
major input to this process is the set of objectives while the main output from the task is a set of
priority objectives with labeled cause-and-effect references among the objectives (so-called Strategy
Map).
Strategic IT Planning Toolkit – Section 6: Strategy Development
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
42
Process: The steps involved in mapping the strategic objectives are listed below while Figure 17
provides a more formal description of the process:
T1) prioritize strategic IT objectives across the perspectives
T2) specify for each objective the set of required and supported strategies
T3) produce a strategy map based on information produced in step T2
Figure 17: Objective Mapping Process
Tools: Section 6.2 of the Template document [33] provides tables for prioritizing objectives across the
strategic perspectives. In the same table, columns are provided for specifying the set of supported and
required objectives (i.e. dependencies between the reference objectives and others).
Related Tasks: This task supports the Strategy Control activity by showing how the effectiveness of
objectives can be evaluated through the cause-and-effect relationships.
Comments: The output of this task is one of the most important outputs from the overall strategy
process. The strategy map provides a snapshot of the major IT objectives and how each supports the
other. Generally, the relationships between objectives are specialized form of the relationships
between the perspectives. For instance, the IT resource perspective supports almost all the other
perspectives and the innovation and learning perspective will directly support the organizational
mission and program perspective. However, these relationships are may be too general for diagnostic
or non-trivial analysis of the IT strategy.
Strategic IT Planning Toolkit – Section 6: Strategy Development
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
43
6.5 Summary
This section describes the heart of the whole IT strategy process. It demonstrates how IT strategies
can be developed through the analysis of SWOT factors, guided by the IT strategic framework and the
IT capability readiness results. It also shows how the IT strategies can be refined into actionable
statements called IT objectives. Through the specification of performance measures for objectives,
general strategy control is achievable through the measures. Finally, by mapping objectives,
evaluation of the effectiveness of strategies or objectives can be tracked. Analysis of the strategy map
is also feasible by exploring the cause-and-effect links between the objectives.
Strategic IT Planning Toolkit – Section 7: Strategy Implementation
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
44
7 Strategic Implementation
This section explains how concrete IT initiatives can be identified and prioritized using the
information produced in the Strategy development activity. The initiatives are specific program,
activities and projects or actions that will be carried out to ensure that the targets associated with
performance measures for strategic objectives are realized.
7.1 Developing Initiatives
Description: This task aims to identify IT initiatives to implement the strategic IT objectives to meet
performance targets. Generating initiatives requires the specification of performance targets (if not
already specified) associated with the performance measures for each priority objective. Since a single
initiative may support more than one objective, opportunities for streamlining initiatives could be
sought to reduce duplication or avoid unnecessary excessively large IT portfolio. The main input to
this task is the strategic objectives list produced in the Strategy Development activity. The output
from the task is a list of initiatives.
Process: The major steps involved in the development of initiatives from priority IT
objectives include:
T1) specifying performance target (if not specified) for measures
T2) defining initiative for objectives to satisfy performance target
T3) compiling initiatives for each perspective
T4) streamlining initiative list across all perspectives
Figure 18: Initiative Definition Process
Strategic IT Planning Toolkit – Section 7: Strategy Implementation
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
45
Tools: The current version of the template document does not support the definition of initiative. In
[28], a table format is provided for mapping organizational initiatives to strategic perspectives.
Related Tasks: The task is one of the terminal tasks for the overall IT strategy process. It relies largely
on the Strategy development activity and produces a major input for the Strategy Control activity.
Comments: This task is optional for the IT strategy process as it deals with implementation issues.
However, by assigning this task to the strategy team, alignment between initiatives is guaranteed.
Parsimony is also important to consider when generating initiatives in view of resource requirements.
7.2 Prioritizing Initiatives
Description: The final task in the implementation of strategic IT objectives is the prioritization of
developed initiatives. Initiatives are prioritized based on available resources, value potentials –
support for high priority organizational goals or programs, and sustainability. The most important step
in this task is the development of a prioritization framework which must be agreed by the strategy
team and advisably by internal stakeholders. The framework would typically consist of a set of
features (both quantitative and qualitative) to be uniformly applied to each initiative. With the major
input into this task as the initiative list, the task produces an agreed priority list of initiatives.
Process: The following steps are involved in the prioritization of initiatives (see Figure 19):
T1) developing prioritization framework
T2) validating prioritization framework
T3) applying framework on initiatives
T4) validating initiative priority list with stakeholders
Figure 19: Initiative Prioritization Process
Strategic IT Planning Toolkit – Section 7: Strategy Implementation
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
46
Tools: The template document does not provide any guide for this task. See resources in Appendix A
for tools to support the implementation of this task.
Related Tasks: This requires an initial list of requirements, produced from the Initiative
development task.
Comments: Varying degree of formality can be employed in the definition of the prioritization
framework. For projects involving high level of cost and risks, there must be a rational basis for
deciding on the priorities. It must also be noted for the eventual implementation of the initiatives
sound business cases must be established for them. The involvement of stakeholders in the validation
steps is essential to obtain support for the initiatives during execution. A very important consideration
in the prioritization of initiatives is the availability of resources and specifically budgets for initiatives.
It would be more pragmatic to focus on initiatives with ready budget and other resources than those
requiring substantial proposal for securing requisite resources.
7.3 Summary
This section shows how the initiatives are developed from first priority objectives and later prioritized
based on agreed prioritization framework. These two tasks are often considered outside the scope of a
strategic planning process. There are arguments that a comprehensive implementation plan should be
developed as a separate project outside the planning activity. However, even in cases where the
development of the initiatives list has been done by the strategy team, the implementation team could
use the outcomes as input for their own processes. There are growing pressures in linking resource
allocation to performance in the public administration. Without an alignment of the budgetary and
performance system, good innovations could be denied required resources due to the prevalent budget
arrangement. Therefore, there is a need for an organizational intervention to ensure that initiatives are
fairly considered largely on merit or performance history.
Strategic IT Planning Toolkit – Section 8: Strategy Control
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
47
8 Strategy Control
This section describes how effectiveness or performance of the developed IT strategy can be
monitored and evaluated. The ability to measure and evaluate performance of IT initiatives and
consequently strategic IT objectives (or IT strategies) determine the degree to which IT strategy can
be effectively managed. Defining monitoring and evaluation framework provides an early warning
indicator to correct problems related to IT enabled programs or initiatives, and to examine if
corrective action is having any effect. It also provides input to resource allocation and planning. The
use of measures can give the IT organization and in fact the organization at large) some lead time for
adjustment if these conditions are known in advance. A monitoring and evaluation framework
generally provides mechanism for data collection on measures defined for initiatives and how to
process these measures to determine IT performance - degree to which the measures or more
appropriately indicators associated with strategic IT objectives are met, including monitoring and
evaluation framework as part of the strategy process improves the chances for attaining the desired
results from plans.
8.1 Strategy Monitoring
Description: The task aims to determine the necessary measures for tracking the progress of IT
initiatives - programs and project towards the attainment of higher level performance objectives.
These measures may relate to the inputs committed to the initiatives, outputs produced from them and
the relationship between the input and output measures. The selected measures are expected to be
linked to higher level performance objectives or measures defined in the strategy development
activity. The input into the process is the set of IT priority initiatives and the output is a table defining
measures and their associated performance objectives.
Process: The steps involved in the execution of this task follow (see also Figure 20):
T1) selecting initiatives to be tracked
T2) defining measures for each initiative
T3) associating defined measures with higher level performance measures
T4) specifying details of measures, e.g. responsible entity, data source, frequency
T5) consolidating measures
T6) collecting data on measures during implementation of initiatives
Related Tasks: The input from this task is supplied by the Strategy Implementation activity. Its
execution is included as part of the program and project management functions during the
implementation of initiatives.
Tools: Several tools are available for developing, monitoring and evaluating systems, with examples
of measures and indicators for different levels of strategies. Please refer to [27], [29] and [31] for such
tools.
Comments: Measures are defined at the different hierarchy of strategies - from individual project,
program or initiatives to IT objectives, strategies and possibly goal. Typical areas of measurements
include customer commitments and satisfaction, cycle and delivery time, quality, cost, financial,
management, IT infrastructure availability, internal IT operations, IT skill availability, and customer
business process support (typical elements of the different perspectives of the IT scorecard). At the
monitoring stage, there is a need for some alignment or association of this hierarchy of measures.
Strategic IT Planning Toolkit – Section 8: Strategy Control
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
48
This link is elaborated at the evaluation phase. The Logic Model [30] provides a concrete framework
for relating measures for initiatives. Since the cost of tracking or monitoring could be high, a minimal
or core set measures should be selected for tracking initially. IT organizations with advanced
Performance Management capability could, however, embark on a more extensive and involving
monitoring exercise.
Figure 20: Strategy Monitoring Process
8.2 Strategy Evaluation
Description: The strategy evaluation activity involves elaborating on the associations defined between
input, process and output (operational) measures of initiatives and measures associated with strategic
objectives or those at higher level of the pyramid. In general, evaluation examines the measures
produced from monitoring and verifies whether expected results, outcomes and impacts are obtained.
While the monitoring measures inputs and outputs of initiatives or IT-enabled services, evaluation
measures the benefits or outcomes resulting from several related initiatives for the organization as a
whole and its stakeholders. Outcome measures are expressed at higher levels of the strategy pyramid
(strategic objectives, strategic priorities or IT Goals). The major input to evaluation task is the set of
measures and their corresponding values for initiatives while the output is the degree to which
selected outcome measures are met.
Strategic IT Planning Toolkit – Section 8: Strategy Control
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
49
Process: The steps involved in the process are listed below (also see Figure 21):
T1) selecting strategic outcomes measures to evaluate
T2) elaborating relationships between the selected outcome measures and related operational
measures
T3) computing outcome measures from operational measures
T4) comparing actual outcome with expected or target outcome
T5) diagnosing cause if actual outcome does not meet expected outcome
T6) prescribing necessary strategic adjustments
T7) effecting the required adjustments to strategy hierarchy (from strategy through objectives to
initiatives)
Related Tasks: This evaluation of outcome measures is closely related to Strategy Development and
Strategy Implementation activities. It connects these two activities by explaining how operational
measures determine outcome or strategic measures.
Tools: See [27], [29] and [31] for examples of useful tools for designing evaluation frameworks.
Comments: A number of different approaches can be taken in evaluation. The approach explained in
this section is the goal-based, in which achievement of performance goals and objectives are
evaluated. It is also possible to conduct evaluation for (i) reaching decision on the continuity of
specific initiatives, (ii) examining the full effects of initiatives (goal-free) or (iii) obtaining judgment
from experts on the initiatives. A combination of these approaches could in principle be used
depending on the evaluation goal.
Strategic IT Planning Toolkit – Section 8: Strategy Control
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
50
Figure 21: Strategy Evaluation Process
8.3 Summary
This section discusses how monitoring and evaluation can be carried out as part of the strategic
planning process. Plans developed with monitoring and evaluation components are likely to meet their
goal than those developed without these components. The selection of measures across the strategy
hierarchy is one of the most important steps in the strategy control activity. The next important step is
the ability to relate these measures (i.e. relating operational to strategic measures). Once the
relationship is established available data can be used to compute values for the dependent outcome
measures. Diagnostic steps (if necessary) can be initiated once measures are computed for deeper
insight into issues. Due to the cost of obtaining required data for measures, a minimal set of
evaluation measures is recommended.
Strategic IT Planning Toolkit – Section 9: Documentation
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
51
9 Strategy Documentation
This final activity of the IT strategy process is the documentation of the developed strategy for the
purpose of dissemination. Three basic steps are proposed under this activity. First, the Strategic IT
Plan document must be drafted. Next, the plan is circulated among stakeholders for comments and
feedback. In the third task, the strategy team attends to the comments and feedback to produce the
final version of the plan.
9.1 Drafting IT Strategy Document
The IT strategy document is a logical compilation of the various outputs from the major activities of
the IT strategy process. In line with the process, the following sections are prescribed for IT strategy
document.
Table 2: Outline for Strategic IT Plan Document
NO SECTIONS DESCRIPION
1
Executive Summary a summary or synopsis of the whole IT Plan document,
highlighting the major planning elements (or sections of the
document)
2 Contents table of contents, figures, definitions etc.
3 Background context for the strategic IT planning exercise (see Section 3)
4 IT Strategic Framework documentation of the mission, vision and goals of the IT
organization (see Section 4)
5
IT Capability Assessment outcome of the extensive assessment of the business
requirements of the agency and the governance, technical and
managerial aspects of the IT organization (see Section 5)
Benchmarking comparative assessment of IT organizations in similar agencies
within the same or other public administration systems
6 IT Strategies documentation of the developed IT strategy (see Sections 6.1.
and 6.2)
7 IT Objectives and
Measures
documentation of the strategic IT objectives (see sections 6.3 and
6.4)
8 IT Initiatives documentation of IT initiatives
9 IT Performance
Framework description of the monitoring and evaluation framework
10 Bibliography list of publications used during the development of the plan
11 Appendices Includes assessment details, and other major inputs into the
strategy development process
Strategic IT Planning Toolkit – Section 9: Documentation
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
52
9.2 Obtaining Feedback on Strategy
Once the IT plan is drafted by the strategy team, it should be circulated among the major stakeholders
for feedback. The information specified in the communication plan (Section 3.2) is useful in
determining a dissemination strategy. Members of the core business units and the IT organization are
expected to be deeply involved in the revision. It is important for the strategy team to obtain
feedbacks from particularly influential stakeholders that were less involved in the whole planning
process. All feedbacks are to be collected and analyzed before effecting changes to the plan.
Process: This task consists of the following three steps:
T1) determining stakeholders to review plan
T2) circulating draft plan among stakeholders
T3) collecting comments and feedback for plan revision
9.3 Revision and Dissemination
The final task of the documentation activity involves analyzing the received comments, determining
required changes and effecting the changes. After effecting the comments, the final version of the plan
is to be submitted to top management for final approval followed by adoption. The IT plan could be
disseminated as required. It is important that all levels of management staff (operation, tactical, and
strategic) have access to the major elements of the plan. It is also important for specific business unit
to plan for the implementation of initiatives related to them. Seminars and workshops could be
organized to explain the details of the plan to the agency staff with discussions on issues related to the
implementation of major initiatives.
Process: The task consists of the following steps:
T1) analyzing received comments
T2) revising plan based on comments
T3) obtaining official approval for plan
T4) dissemination of IT strategy (through agency Intranet, seminars or workshops)
T5) follow-up of business units on implementation of initiatives
9.4 Summary
The documentation activity of the IT strategy process consolidates the major outputs from the other
activities of the IT strategy process from the strategic context and assessment through strategy
development and implementation to strategy monitoring and evaluation. The documentation allows
the strategy team to obtain feedback on the developed strategy as a basis for revision before official
adoption and dissemination. The approved IT plan provides a sound basis for the development of
tactical or annual IT plans and implementation of IT initiatives by core business units of the agency.
Strategic IT Planning Toolkit – Section 10: Conclusions
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
53
10 Conclusions
This toolkit was developed to assist public or government organizations in building their IT strategies
through a rigorous but practical process. A major goal of the toolkit is to facilitate the development of
a balanced IT strategy well aligned to agency organizational goals. The toolkit does not presume any
specific technical capability and therefore subsumes technicalities of the underlying methodology
elements – for instance the use of balanced scorecard. It presented the processes for implementing the
major planning activities: Planning, Strategic Framework, Assessment, Strategy Development,
Strategy Implementation, Strategy Control and Documentation. Cross references are provided in the
toolkit to the appropriate sections of a companion Template Document [33] that could be used by the
strategy team to execute specific planning tasks.
While the government as a whole could adopt the prescribed processes as standards for Strategic IT
Planning, individual agencies could customize the processes based on size and need. As a government
standard, agencies could submit their IT strategies developed based on the standard in some fixed
format for consolidation by government. A government-wide view on IT development enables
effective coordination, identification of cross-agency initiatives, opportunities for economies of scale
and standardization of the IT environment across government. For instance, if 50% of government
agencies indicate document management as priority initiative, a cross-agency project team could be
setup to facilitate the implementation of the initiatives at the different agencies with additional
benefits of experience and expertise sharing, as well as economies of scale.
By standardizing the strategic IT planning process, government is better able to track the alignment of
initiatives to its critical programs such as those related to public service reform and electronic
government development. By design, the prescribed process models guarantee the development of e-
government through explicit IT support for the delivery of public services.
The toolkit does not provide exhaustive information on strategic IT planning for public organizations.
However, it provides detailed enough information to guarantee the development of a balanced IT
strategy for government agencies. Information on other IT strategy development tools is provided in
Appendix A.
Strategic IT Planning Toolkit – Bibliography
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
54
Bibliography
[1] Maddalena Sorrentino, The Implementation of ICT in Public Sector Organizations - Analysing
Selection Criteria for e-Government Projects, 17th Bled e-Commerce, Bled, Slovania, June 21-
23, 2004
[2] Francisco J. Proenza, ICT-Enabled Networks, Public Sector Performance and the Development
of Information and Communication Technologies, Connected for Development: Information
Kiosks and Sustainability, UNICT Task Force and Digital Partners, October 2003, available at
http://www.e-forall.org/pdf/ ICTEnabledNetworks.pdf
[3] Prime Minister’s Department, The Malaysian Public Sector ICT Strategic Plan, August 2003,
available at
http://unpan1.un.org/intradoc/groups/public/documents/APCITY/UNPAN016394.pdf
[4] New South Wales Government, People First – A new direction for ICT in NSW – NSW
Government ICT Strategic Plan, July 2006, available at
http://www.gcio.nsw.gov.au/library/strategies/nsw-government-ict-strategic-plan-people-first/
[5] Nordic Council of Ministers, ICT Usage in the Public Sector –a Nordic model questionnaire,
January 2003, available at http://www.dst.dk/upload/ictusagepublic.pdf
[6] Jim Davies, Tomasz Janowski, Adegboyega Ojo and Aadya Shukla, Technological Foundations
of Electronic Governance, International Conference on the Theory and Practice of Electronic
Governance – ICEGOV2007, Macao, December 2007, pp 5 – 11.
[7] Anthony Cresswell, G. Brian Burke, Theresa A. Pardo, Advancing Return on Investment for
Government IT – A Public Value Framework, Center for Technology in Government,
University at Albany, SUNY, Sept. 2006, available at
http://www.ctg.albany.edu/publications/reports/advancing_roi/advancing_roi.pdf
[8] Office of Management and Budget’s (OMB), FEA Consolidated Reference Model Document
Version 2.3, Available at http://www.egov.gov, October 2007
[9] Paul P. Tallon and Kenneth L. Kraemer, Investigating the Relationship between Strategic
Alignment and IT Business Value: The Discovery of a Paradox, Creating business value with
information technology: challenges and solutions, IGI Publishing Hershey, PA, USA, 2003, pp
1-22
[10] Grover S. Kearns and Albert L. Lederer, Strategic IT Alignment: A Model for Competitive
Advantage, 22nd Internal Conference on Information Systems, 2001, pp. 1-12
[11] Berwyne E. Jones, Strategic Planning in Government – The Key to reinventing ourselves, PM:
January – February 1996, available at http://www.dau.mil/pubs/pm/pmpdf96/jones.pdf
[12] Ungana-Afrika, Strategic Technology Planning Guide – A toolkit for development practitioner,
October 2005, available at http://www.ungana-
afrika.org/resources/techplanning/tech_planning_guide.pdf
[13] Janet Shapiro, Strategic Planning Toolkit, available at
http://www.civicus.org/new/media/Strategic% 20Planning.pdf
[14] National Human services IT Resource Center, Strategic IT Planning and Management Guide,
Administration for Children and Families, September 2004, available at
http://www.acf.hhs.gov/nhsitrc/it_ planning/full_pdf.html
[15] Grover S. Kearns and Rajiv Sabherwal, Strategic Alignment Between Business and Information
Technology: A Knowledge-based View of Behaviors, Outcome and Consequences, Journal of
Management Information Systems, Winter 2006-7, 2007, Vol. 23, No. 3, pp. 129-162
[16] Rocky J. Dowyer, Strategic Planning – The Concept, available at http://www.iqpc.co.uk/binary-
data/IQPC_CONFEVENT/pdf_file/2825.pdf
[17] Marc Osten, Strategic Technology Planning and Outcome Measurement – The Use of Logic
Models to Enhance Strategic Technology Planning, Summit Consulting Collaborative, available
at http://www.summitcollaborative.com/outcomeppr.PDF
[18] IT Today, Aligning IT to Organizational Strategy, available at http://www.ism-
journal.com/ITToday/ AU2621_CH04.pdf
Strategic IT Planning Toolkit – Bibliography
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
55
[19] Paul F. MacCawley, The Logic Model for Program Planning and Evaluation, University of
Idaho Extension, available at http://www.uidaho.edu/extension/LogicModel.pdf
[20] Community Anti-drug Coalition of America, CADCA, Planning Primer: Developing a Theory
of Change, Logic Models, and Strategic and Action Plans, available at http://www.uidaho.edu/
extension/LogicModel.pdf
[21] Joseph W. Weiss and Don Anderson, Aligning Technology and Business Strategy: Issues &
Frameworks, A Field Study of 15 Companies, Proceedings of the 37th Hawaii International
Conference on System Sciences, 2004, pp. 1-9
[22] IT Governance Institute, COBIT – Framework, Control Objectives, Management Guidelines
and Maturity Models, 2007
[23] IT Governance Institute, IT Governance Implementation Guide – using COBIT and VAL IT,
2007
[24] Deliotte, CIO 2.0 – The Changing role of the Chief Information Officer (CIO) in government –
and why it matters to leaders in the public sector, Deloitte Development LLC., 2004
[25] Jose Manuel Ortegta, Delivering IT’s contribution: the 2005 CIO agenda public sector
perspective, Gartner, 2007, available at
http://ciapem.chihuahua.gob.mx/atach2/ciapemweb/uploads/Jose%20 Manuel%20Ortega.pdf
[26] Ken Cochrane, Role of the Chief Information Officer, Presentation to the Public Sector
Business Committee Information Technology Association of Canada, Treasury Board of
Canada Secretariat, available at http://www.tbs-sct.gc.ca/cio-dpi/2007/cio-dpi/rcio-rdpi/rcio-
rdpi_e.pdf
[27] World Bank, Monitoring and Evaluation Toolkit for E-Strategies Results, Global Information
and Communication Technologies Department (GITC), The World Bank, January 2005,
available at
http://siteresources.worldbank.org/INTEDEVELOPMENT/Resources/estrategiesToolkit_Jan20
05.pdf
[28] Paul R. Niven, Balanced Scorecard for Government and Non-profits Agencies, John Wiley and
Sons, Unit-ed States, January 2003
[29] GAO-Accounting and Information Management Division, Measuring Performance and
Demonstrating Results of Information Technology Investments, United States General
Accounting Office, Report # GAO/AIMD-97-163, 1997, available at
http://www.gao.gov/archive/1997/ai97163.pdf
[30] W.K. Kellogg Foundation, Logic Model Development Guide – Using Logic Models to bring
together Planning, Evaluation and Action, January 2004, available at
http://www.wkkf.org/Pubs/Tools/Evaluation/ Pub3669.pdf
[31] Janet Shapiro, Monitoring and Evaluation, Civicus, available at
http://www.civicus.org/new/media/ Monitoring%20and%20Evaluation.pdf
[32] Khoi Nguyen, Adegboyega Ojo, Tomasz Janowski, Strategic IT Planning for Public
Organization – Strategy Management Software, Deliverable D5, e-Macao Program, UNU-IIST
Center for Electronic Governance, April 2008.
[33] Adegboyega Ojo, Bimal Pratap Shah, Tomasz Janowski, Strategic IT Planning for Public
Organizations – Templates, Deliverable D2, e-Macao Program, UNU-IIST Center for
Electronic Governance, April 2008.
Strategic IT Planning Toolkit – Appendix: Tools
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
56
Appendix A: Tools for Strategic IT Planning
There are a number of tools available to support strategic planning in general and Strategic IT
planning in particular. These tools include toolkits, templates and software. Some of the tools are
listed in the table below.
TITLE DESCRIPTION URL AUTHOR
1 Strategic
Planning Tool
Provides guidelines for carrying
out some strategic planning
tasks including readiness
assessment, creation of shared
vision, setting goals and
objectives and development of
communication plans.
http://www.nsba.o
rg/sbot/toolkit/spt.
html
Education for
Leadership Toolkit,
National School Boards
Foundation implemented
by NSBA's Institute for
the Transfer of
Technology to Education
(NSF Grant).
2 Technology
Planning Tools
A guideline for carrying out
technology planning in the area
of visioning, stock taking,
development of actions or
initiatives and periodic
evaluation.
http://www.nsba.o
rg/sbot/toolkit/tpt.
html
Education for
Leadership Toolkit,
National School Boards
Foundation implemented
by NSBA's Institute for
the Transfer of
Technology to Education
(NSF Grant).
3 Strategic
Planning
Resources
Provides an annotated list of
resources for strategic planning.
http://www.ptv-
agc.org/AGC%20
Planning%20Repo
rt%20Tools%20S
ummary_11_06.p
df
Affinity Group
Coalition, Public
Television Planning
Project
4 Online
Resources for
Strategic
Planning
An annotated bibliography of
online resource to support
strategic planning
http://www.actew.
org/projects/curre
nt/ACTEW_Strate
gic_Planning_Bibl
iography.pdf
ACTEW
5 Free Online
Strategic
Planner
A free online strategic planning
system. System allows for the
generation of simple reports.
http://www.planw
are.org/strategicpl
anner.htm
Planware
6 IT Strategy and
Alignment
System
A comprehensive strategy
development and alignment
System allows for generation of
core strategic planning reports
like IT scorecard and strategy
card for public organizations.
http://www.egov.i
ist.unu.edu/cegov/
projects/planning
Center for Electronic
Governance at United
Nations University -
IIST
7 Strategy A free (non-professional
version) strategy map Balanced
Scorecard software
http://www.strateg
ymap.com.au/
Applied PC Systems Pty
Ltd
8 Strategic IT
Planning and
Management
Resources
Set of resources for strategic IT
planning and management
activities.
http://www.acf.hh
s.gov/nhsitrc/it_pl
anning/strategic_p
lanning/resour.ht
ml
US Department for
Health and Human
Services
Strategic IT Planning Toolkit – Appendix: Definitions
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
57
Appendix B: Definitions
DESCRIPTION
Back Office
Application
Software that does not interact directly with the customer. It provides functionality
for internal operations such as enterprise resource planning (ERP), inventory
control, manufacturing and all of the supply chain activities associated with
procuring goods, services and raw materials. If an ERP system includes order
entry and customer service capabilities, it would bridge both back office and front
office
http://www.techweb.com/encyclopedia/defineterm.jhtml?term=back+office+appli
cation
Balance
Scorecard
A management instrument that translates an organization's mission and strategy
into a comprehensive set of performance measures to provide a framework for
strategic measures and management. The scorecard measures organizational
performance across several perspectives: financial, customers, internal business
processes, and learning and growth.
http://rru.worldbank.org/Documents/Toolkits/Labor/Toolkit/glossary.html
Benchmark A standard or point of reference used in measuring and/or judging quality or value.
http://rru.worldbank.org/Documents/Toolkits/Labor/Toolkit/glossary.html
Business
Objectives
The measurable targets designed to help an organization achieve its overall
business strategy.
http://www.etpconsulting.co.uk/Business%20Continuity/business-continuity-
glossary.htm
Business Process
Re-engineering
Fundamental analysis and radical redesign of business processes and management
systems to achieve dramatic change or performance improvement. BPR uses
objective, quantitative methods and tools to analyze, redesign and transform
business processes including their supporting organization structures, information
systems, job responsibilities and performance standards.
http://www.ic.gc.ca/sc_mangb/ecomevnt/engdoc/glossary.html
Business
Processes
On the one hand, business processes refer to the workflows within a company and,
on the other hand, to the processes involved in inter-company transactions – in
other words: offers, price negotiations, purchasing agreements, and orders.
Software that reproduces these business processes, therefore, can be both ERP
system as well as e-commerce software.
http://www.x-solutions.poet.com/eu/newsevents/glossar/#BusinessProcesses
Change
Management
The concept of change management encompasses three basic definitions: (1) the
task of managing change, referring to (a) making changes in an organization in a
planned and systematic way, or (b) “responding to changes over which the
organization exercises little or no control”, such as legislation, social and political
upheaval, changing economic situations, etc; (2) “an area of professional practice,”
referring to experts or firms engaged in planning and managing change for their
clients; (3) a body of knowledge, consisting of “ models, methods and techniques,
tools, skills and other forms of knowledge that go into making up any practice.”
(Nickols,2002)
http://home.att.net/~nickols/change.htm
COBIT Control Objectives for Information and related Technology, Technology, first
released by the Information Systems Audit and Control Foundation (ISACF) in
Strategic IT Planning Toolkit – Appendix: Definitions
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
58
1996 and now published by the IT Governance Institute. (COBIT definition)
http://www.datagovernance.com/glossary_c.html
COBIT Level – 3 The maturity models (MMs) in COBIT were first created in 2000 and at that time
were designed based on the original CMM scale with the addition of an extra level
(0) as shown below:
Level 0: Non-existent
Level 1: Initial/ad hoc
Level 2: Repeatable but Intuitive
Level 3: Defined Process
Level 4: Managed and Measurable
Level 5: Optimized
Source:
http://www.isaca.org/Content/NavigationMenu/Members_and_Leaders1/COBIT6/
FAQ6/COBIT_FAQ.htm#24
Conceptual
Framework
This is a consistent and comprehensive theoretical framework emerging from an
inductive integration of previous literature, theories, and other pertinent
information. Conceptual framework is usually the basis for reframing the research
questions and for formulating hypotheses or making informal tentative predictions
about the possible outcome of the study.
http://www.fiu.edu/~bridges/glossary.htm#Conceptual_Framework
Courseware Software designed specifically for use in a classroom or other educational setting,
containing instructional material, educational software, or audiovisual materials.
"Courseware" is a term used to describe software resources which are used for
Computer-Assisted Learning (CAL). to mediate or support a course or module.
http://www.e-learningguru.com/gloss.htm
Desired Future
State
Declaring how you want the process to work once it is redesigned leads to
describing the desired future state, which may address the customer requirements
and how the process will meet those requirements.
http://web.mit.edu/hr/oed/bpi/glossary.html
Electronic
Governance
E-governance is the use of ICT by different actors of the society with the aim to
improve their access to information and to build their capacities.
http://portal.unesco.org/ci/en/ev.php-
URL_ID=3038&URL_DO=DO_TOPIC&URL_SECTION=201.html
Enterprise
Architecture
The holistic expression of an organization's key business, information, application
and technology strategies. Integral components of enterprise architecture are
standards and guidelines that direct how technology will be used.
http://cpr.ca.gov/report/refapp/glos.htm
e-Strategy Business strategy applied to develop an online presence.
http://www-agecon.ag.ohio-state.edu/programs/e-agbiz/pageglossary/main.html
Evaluation Analysis of various measures to determine of specific performance objectives are
met. It is also an analysis undertaken at a fixed point in time to determine the
degree to which stated objectives have been reached. This is generally used as a
basis for decision making, including updating plans.
http://www.unisa.edu.au/pas/qap/planning/glossary.asp
External Factors A factor that may enhance or nullify underlying program assumptions and thus the
likelihood of goal achievement. Goal achievement may also be predicated on
Strategic IT Planning Toolkit – Appendix: Definitions
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
59
certain conditions (events) not happening. They are introduced by external forces
or parties, and are not of the agency's own making. The factors may be economic,
demographic, social, or environmental, and they may remain stable, change within
predicted rates, or vary to an unexpected degree.
http://www1.eere.energy.gov/ba/pba/program_evaluation/glossary.html
Framework A framework is a set of guidelines for use in a larger (less specific) context than
would be considered for a method or process. A framework provides flexibility in
the form of general characteristics and guidelines which allow the engineer or
analyst to choose whatever method or technique is best suited for a particular
situation; whereas, in general, a methodology, method, or technique prescribes a
specific set of actions, rules, or processes; therefore, a methodology tends to be
less.
http://www.mikehalblander.com/RE_Glossary.html
ICT
Infrastructure
Refers to physical telecommunications systems and networks (cellar, broadcast,
cable, satellite, postal) and the services that utilize them (Internet, voice, mail,
radio, and television).
http://web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTINFORMATION
ANDCOMMUNICATIONANDTECHNOLOGIES/0,,contentMDK:21035032~pa
gePK:210058~piPK:210062~theSitePK:282823,00.html
ICT Sector In New Zealand, the ICT sector is an agglomeration of the communications sector,
including telecommunications providers, and the information technology sector,
which ranges from small software development firms to multi-national hardware
and software producers.
http://www.digitalstrategy.govt.nz/Media-Centre/Glossary-of-Key-Terms/
IT Governance IT Governance is a subset discipline of Corporate Governance focused on
information technology (IT) systems and their performance and risk management.
Some disciplines that make up IT governance are change management, problem
management, release management, availability management, and service-level
management.
http://en.wikipedia.org/wiki/IT_governance
Measure A value quantified against a standard, such as time and cost.
Mission The part of a goal or endeavor assigned as a specific responsibility of a particular
organizational unit. It includes the task, together with the purpose, which clearly
indicates the action to be taken and the reasons.
www.ojp.usdoj.gov/BJA/evaluation/glossary/glossary_m.htm
Monitoring The ability to track the defined measures through data collection. It can also be
defined as a continuous process of collecting and analyzing data to compare how
well a project, programme or policy is being implemented against expected results.
www.undg.org/archive_docs/2485-Results-Based_Management_Terminology_-
_Final_version.doc
New Public
Management
This is a slippery label. Generally, it is used to describe a management culture that
emphasizes the centrality of the citizen or customer, as well as accountability for
results. It also suggests structural or organizational choices that promote
decentralized control through a wide variety of alternative service delivery
mechanisms, including quasi-markets with public and private service providers
competing for resources from policymakers and donors. NPM tends to include a
greater reliance on contracts and contracting out, and places more emphasis on
managerialism than formal rules and procedural standards, while de-emphasizing a
Strategic IT Planning Toolkit – Appendix: Definitions
Report No. 417, May 2009 UNU-IIST, P. O. Box 3058, Macao
60
career civil service. NPM does not claim that government should stop performing
certain tasks -- although the New Public Management often is associated with this
policy perspective. NPM is not about whether tasks should be undertaken or not. It
is about getting things done better.
http://web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTPUBLICSECTOR
ANDGOVERNANCE/0,,contentMDK:20201644~pagePK:210058~piPK:210062
~theSitePK:286305,00.html
Organizational
Strategy
An organization's strategy deals with how to make management's strategic vision
for the company a reality-it represents the game plan for moving the company into
an attractive business position and building a sustainable competitive advantage.
http://highered.mcgraw-hill.com/sites/0072443715/student_view0/glossary.html
PKI
Infrastructure
Also known as an asymmetrical key encryption. With this type of encryption, a
pair of encryption keys are used—a public key and a private key. The public key is
made available to anyone who wants to send an encrypted message to the holder
of the private key. The only way to decrypt the message is with the private key.
http://www.e-future.ca/alberta/pdf/efc_e-business_glossary.pdf
MIS Short for management information system or management information services,
and pronounced as separate letters, MIS refers broadly to a computer-based system
that provides managers with the tools for organizing, evaluating and efficiently
running their departments. In order to provide past, present and prediction
information, an MIS can include software that helps in decision making, data
resources such as databases, the hardware resources of a system, decision support
systems, people management and project management applications, and any
computerized processes that enable the department to run efficiently
http://www.webopedia.com/TERM/M/MIS.html
Public Policies Public policy refers to actions taken by a government body
http://www.worldbank.org/html/aftsr/sfi23.htm
Strategic
Objectives
Strategic objectives relate to outcomes that strengthen an organization's overall
business position and competitive vitality; Financial objectives relate to the
financial performance targets management has established for the organization to
achieve.
http://highered.mcgraw-hill.com/sites/0072443715/student_view0/glossary.html
SWOT SWOT is a method of reviewing the current situation of your business or service.
The idea is that you identify the strengths and weaknesses of your service,
pinpoint opportunities and note threats.
www.plymouth.gov.uk/text/homepage/transportandstreets/transportplanning/ltp20
01-2006/ltpglossary.htm
Terms of
Reference
Detailed description of the tasks that consultants will be required to undertake, the
range of deliverables, and the timetable.
http://rru.worldbank.org/Documents/Toolkits/Labor/Toolkit/glossary.html
Vision An overarching statement of the way an organization wants to be; an ideal state of
being at a future point.
www.asq.org/glossary/v.html