OPM case analysis
Operations Planning and Scheduling
Chapter 10
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
1
What is Operations Planning and Scheduling?
Operations planning and scheduling
The process of balancing supply with demand, from the aggregate level down to the short-term scheduling level
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
Operations Planning and Scheduling
| TYPES OF PLANS WITH OPERATIONS PLANNING AND SCHEDULING | |
| Term | Definition |
| Sales and operations plan (S&OP) | A time-phased plan of future aggregate resource levels so that supply is in balance with demand |
| Aggregate plan | Another term for the sales and operations plan |
| Production plan | A sales and operations plan for a manufacturing firm that centers on production rates and inventory holdings |
| Staffing plan | A sales and operations plan for a service firm, which centers on staffing and on other human resource-related factors |
| Resource plan | An intermediate step in the planning process that lies between S&OP and scheduling |
| Schedule | A detailed plan that allocates resources over shorter time horizons to accomplish specific tasks |
Table 10.1
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
3
Level 1: Sales and Operations Planning
Aggregation
Services or products
Workforce
Time
Information inputs
Relationship to other plans
Business Plan
Annual Plan
Levels in Operations Planning and Scheduling
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
4
Levels in Operations Planning and Scheduling
Business or
annual plan
Job and facility scheduling
Workforce scheduling
Equipment/jobs scheduling
Scheduling
Materials requirements planning
Services resource planning
Resource Planning
Sales
Plan
Operations
Plan
Sales and Operations Plan
Forecasting
Operations
strategy
Constraint
management
Figure 10.2
Level 1
Level 2
Level 3
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
5
Level 2: Resource Planning
A process that takes sales and operations plans; process time standards, routings, and other information on how services or products are produced; and then plans the timing of capacity and material requirements.
Level 3: Scheduling
A process that takes the resource plan and translates it into specific operational tasks on a detailed basis.
Levels in Operations Planning and Scheduling
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
6
S&OP Supply Options
Anticipation Inventory
Workforce Adjustment
Workforce Utilization
Part-Time Workers
Subcontractors
Vacation Schedules
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
S&OP Strategies
Chase Strategy
A strategy that involves hiring and laying off employees to match the demand forecast
Level Strategy
A strategy that keeps the workforce constant, but varies its utilization via overtime, undertime, and vacation planning to match the demand forecast
Mixed Strategy
A strategy that considers the full range of supply options
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
S&OP Strategies
| TYPES OF COSTS WITH SALES AND OPERATIONS PLANNING | |
| Cost | Definition |
| Regular time | Regular-time wages plus benefits and pay for vacations |
| Overtime | Wages paid for work beyond the normal workweek exclusive of fringe benefits |
| Hiring and layoff | Cost of advertising jobs, interviews, training programs, scrap caused by inexperienced employees, exit interviews, severance pay, and retraining |
| Inventory holding | Capital, storage and warehousing, pilferage and obsolescence, insurance, and taxes |
| Backorder and stockout | Costs to expedite past-due orders, potential cost of losing a customer |
Table 10.2
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
9
S&OP Strategies
Figure 10.3
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
10
S&OP Strategies
Finalize
and communicate
6
Executive S&OP meeting
5
Consensus meeting
4
Update
S&OP spreadsheets
3
Demand planning
2
Gather data
1
Steps in Sales and Operations Planning Process
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
11
Spreadsheet for a Manufacturer
Figure 10.4
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
12
Example 10.1
A large distribution center must develop a staffing plan that minimizes total costs using part-time stockpickers (using chase and level plans)
For the level strategy, need to meet demand with the minimum use of undertime and not consider vacation scheduling
Each part-time employee can work a maximum of 20 hours per week on regular time
Instead of paying undertime, each worker’s day is shortened during slack periods and overtime can be used during peak periods
| 1 | 2 | 3 | 4 | 5 | 6 | Total | |
| Forecasted demand | 6 | 12 | 18 | 15 | 13 | 14 | 78 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
13
Example 10.1
Currently, 10 part-time clerks are employed. They have not been subtracted from the forecasted demand shown. Constraints and cost information are as follows:
a. The size of training facilities limits the number of new hires in any period to no more than 10.
b. No backorders are permitted; demand must be met each period.
c. Overtime cannot exceed 20 percent of the regular-time capacity in any period. The most that any part-time employee can work is 1.20(20) = 24 hours per week.
d. The following costs can be assigned:
Regular-time wage rate $2,000/time period at 20 hrs/week
Overtime wages 150% of the regular-time rate
Hires $1,000 per person
Layoffs $500 per person
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
14
Example 10.1
a. Chase Strategy
This strategy simply involves adjusting the workforce as needed to meet demand.
Rows in the spreadsheet that do not apply (such as inventory and vacations) are hidden.
The workforce level row is identical to the forecasted demand row.
A large number of hirings and layoffs begin with laying off 4 part-time employees immediately because the current staff is 10 and the staff level required in period 1 is only 6.
The total cost is $173,500.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
15
Example 10.1
Figure 10.5
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
16
Example 10.1
b. Level Strategy
In order to minimize undertime, the maximum use of overtime possible must occur in the peak period.
The most overtime that the manager can use is 20 percent of the regular-time capacity, w, so
A 15-employee staff size minimizes the amount of undertime for this level strategy.
Because the staff already includes 10 part-time employees, the manager should immediately hire 5 more.
The total cost is $164,000.
1.20w = 18 employees required in peak period (period 3)
w =
= 15 employees
18
1.20
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
17
Example 10.1
Figure 10.6
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
18
Application 10.1
The Barberton Municipal Division of Road Maintenance is charged with road repair in the city of Barberton and surrounding area.
Cindy Kramer, road maintenance director, must submit a staffing plan for the next year based on a set schedule for repairs and on the city budget.
Kramer estimates that the labor hours required for the next four quarters are 6,000, 12,000, 19,000, and 9,000, respectively.
Each of the 11 workers on the workforce can contribute 520 hours per quarter. Overtime is limited to 20 percent of the regular-time capacity in any quarter. Subcontracting is not permitted.
Payroll costs are $6,240 in wages per worker for regular time worked up to 520 hours, with an overtime pay rate of $18 for each overtime hour. Although unused overtime capacity has no cost, unused regular time is paid at $12 per hour.
The cost of hiring a worker is $3,000, and the cost of laying off a worker is $2,000.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
19
Application 10.1
Use a chase strategy for the Barberton Municipal Division that varies the workforce level without using overtime.
Undertime should be minimized, except for the minimal amount mandated because the quarterly requirements are not integer multiples of 520 hours.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
20
| Quarter | |||||
| 1 | 2 | 3 | 4 | Total | |
| Forecasted demand (hrs) | 6,000 | 12,000 | 19,000 | 9,000 | 46,000 |
| Workforce level (workers) | 12 | 91 | |||
| Undertime (hours) | 240 | 1,320 | |||
| Overtime (hours) | 0 | 0 | |||
| Utilized time (hours) | 6,000 | 46,000 | |||
| Hires (workers) | 1 | 26 | |||
| Layoffs (workers) | 0 | 19 |
| 37 |
| 240 |
| 0 |
| 19,000 |
| 13 |
| 0 |
| 18 |
| 360 |
| 0 |
| 9,000 |
| 0 |
| 19 |
Application 10.1
| 24 |
| 480 |
| 0 |
| 12,000 |
| 12 |
| 0 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
21
Application 10.1
What is the total cost of this plan?
| Costs per Quarter | |||||
| 1 | 2 | 3 | 4 | Total | |
| Utilized time | $72,000 | $552,000 | |||
| Undertime | 2,880 | 15,840 | |||
| Overtime | 0 | 0 | |||
| Hires | 3,000 | 78,000 | |||
| Layoffs | 0 | 38,000 | |||
| Total Cost | $683,840 |
| $144,000 |
| 5,760 |
| 0 |
| 36,000 |
| 0 |
| $228,000 |
| 2,880 |
| 0 |
| 39,000 |
| 0 |
| $108,000 |
| 4,320 |
| 0 |
| 0 |
| 38,000 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
22
Application 10.2
Find a level plan for the Barberton Municipal Division that allows no delay in road repair and minimizes undertime.
Overtime can be used to its limits in any quarter.
Given that the demand peaks in quarter 3:
1.20w =
w = 30.45 or 31 employees
36.54 employee-period equivalents
19,000
520
=
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
23
| Quarter | |||||
| 1 | 2 | 3 | 4 | Total | |
| Forecasted demand (hrs) | 6,000 | 12,000 | 19,000 | 9,000 | 46,000 |
| Workforce level (workers) | 31 | ||||
| Undertime (hours) | 10,120 | ||||
| Overtime (hours) | 0 | ||||
| Utilized time (hours) | 6,000 | ||||
| Hires (workers) | 20 | ||||
| Layoffs (workers) | 0 |
Application 10.2
| 31 |
| 4,120 |
| 0 |
| 12,000 |
| 0 |
| 0 |
| 31 |
| 0 |
| 2,880 |
| 16,120 |
| 0 |
| 0 |
| 31 |
| 7,120 |
| 0 |
| 9,000 |
| 0 |
| 0 |
| 124 |
| 21,360 |
| 2,880 |
| 43,120 |
| 20 |
| 0 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
24
| Costs per Quarter | |||||
| 1 | 2 | 3 | 4 | Total | |
| Utilized time | $72,000 | $517,440 | |||
| Undertime | 121,440 | 256,320 | |||
| Overtime | 0 | 51,840 | |||
| Hires | 60,000 | 60,000 | |||
| Layoffs | 0 | 0 | |||
| Total Cost | $885,600 |
Application 10.2
What is the total cost of this level workforce plan?
| $108,000 |
| 85,440 |
| 0 |
| 0 |
| 0 |
| $193,440 |
| 0 |
| 51,840 |
| 0 |
| 0 |
| $144,000 |
| 49,440 |
| 0 |
| 0 |
| 0 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
25
Application 10.3
A mixed strategy considers and implements a fuller range of reactive alternatives than any one “pure” strategy.
Now propose a plan of your own for the Barberton Municipal Division.
Use the chase strategy as a base, but find a way to decrease the cost of hiring and layoffs by selectively using some overtime.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
26
| Quarter | |||||
| 1 | 2 | 3 | 4 | Total | |
| Forecasted demand | 6,000 | 12,000 | 19,000 | 9,000 | 46,000 |
| Workforce level | |||||
| Undertime (hours) | |||||
| Overtime (hours) | |||||
| Utilized time (hours) | |||||
| Hires (workers) | |||||
| Layoffs (workers) |
Application 10.3
| 12 |
| 240 |
| 0 |
| 6,000 |
| 1 |
| 0 |
| 85 |
| 1,080 |
| 2,880 |
| 43,120 |
| 20 |
| 13 |
| 24 |
| 480 |
| 0 |
| 12,000 |
| 12 |
| 0 |
| 31 |
| 0 |
| 2,880 |
| 16,120 |
| 7 |
| 0 |
| 18 |
| 360 |
| 0 |
| 9,000 |
| 0 |
| 13 |
The key idea in this plan is hiring only 7 employees in quarter 3, while using overtime to its maximum limit and eliminating undertime for that quarter.
Hiring fewer in quarter 3 allows the number of layoffs in quarter 4 to drop to only 13, down from 19.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
27
| Costs per Quarter | |||||
| 1 | 2 | 3 | 4 | Total | |
| Utilized time | $72,000 | $144,000 | $193,440 | $108,000 | $517,440 |
| Undertime | |||||
| Overtime | |||||
| Hires | |||||
| Layoffs | |||||
| Total Cost |
Application 10.3
What is the cost of your mixed strategy plan?
| 12,960 |
| 51,840 |
| 60,000 |
| 26,000 |
| $668,240 |
| 2,880 |
| 0 |
| 3,000 |
| 0 |
| 5,760 |
| 0 |
| 36,000 |
| 0 |
| 0 |
| 51,840 |
| 21,000 |
| 0 |
| 4,320 |
| 0 |
| 0 |
| 26,000 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
28
Scheduling
Scheduling
The function that takes the operations and scheduling process from planning to execution.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
29
Scheduling
Job and Facility Scheduling
Gantt progress chart
Gantt workstation chart
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
Scheduling
Gantt Progress Chart
Nissan
Ford
Pontiac
Job
4/20
4/22
4/23
4/24
4/25
4/26
4/21
4/17
4/18
4/19
Current date
Start activity
Finish activity
Scheduled activity time
Actual progress
Nonproductive time
Figure 10.7
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
31
Scheduling
Operating Room A
Workstation
7am
Operating Room B
Operating Room C
12 pm
8am
9am
10am
11am
1pm
2pm
3pm
4pm
5pm
6pm
Time
Dr. Gary Case
Dr. Jeff Dow
Dr. Madeline Easton
Dr. Dan Gillespie
Dr. Jordanne Flowers
Dr. Jon Adams
Dr. Aubrey Brothers
Dr. Alaina Bright
Gantt Workstation Chart
Figure 10.8
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
32
Scheduling
Steps in developing a workforce schedule
Step 1: Find all the pairs of consecutive days
Step 2: If a tie occurs, choose one of the tied pairs, consistent with the provisions written into the labor agreement
Step 3: Assign the employee the selected pair of days off
Step 4: Repeat steps 1 – 3 until all of the requirements have been satisfied
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
33
Example 10.2
The Amalgamated Parcel Service is open seven days a week. The schedule of requirements is:
| Day | M | T | W | Th | F | S | Su |
| Required number of employees | 6 | 4 | 8 | 9 | 10 | 3 | 2 |
The manager needs a workforce schedule that provides two consecutive days off and minimizes the amount of total slack capacity.
To break ties in the selection of off days, the scheduler gives preference to Saturday and Sunday if it is one of the tied pairs.
If not, she selects one of the tied pairs arbitrarily.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
34
Example 10.2
Friday contains the maximum requirements, and the pair S – Su has the lowest total requirements. Therefore, Employee 1 is scheduled to work Monday through Friday.
Note that Friday still has the maximum requirements and that the requirements for the S – Su pair are carried forward because these are Employee 1’s days off.
These updated requirements are the ones the scheduler uses for the next employee.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
35
| Scheduling Days Off | ||||||||
| M | T | W | Th | F | S | Su | Employee | Comments |
| 6 | 4 | 8 | 9 | 10 | 3 | 2 | 1 | The S–Su pair has the lowest total requirements. Assign Employee 1 to a M-F schedule. |
| 5 | 3 | 7 | 8 | 9 | 3 | 2 | 2 | The S–Su pair has the lowest total requirements. Assign Employee 2 to a M-F schedule. |
| 4 | 2 | 6 | 7 | 8 | 3 | 2 | 3 | The S–Su pair has the lowest total requirements. Assign Employee 3 to a M-F schedule. |
| 3 | 1 | 5 | 6 | 7 | 3 | 2 | 4 | The M–T pair has the lowest total requirements. Assign Employee 4 to a W-Su schedule. |
| 3 | 1 | 4 | 5 | 6 | 2 | 1 | 5 | The S–Su pair has the lowest total requirements. Assign Employee 5 to a M-F schedule. |
| 2 | 0 | 3 | 4 | 5 | 2 | 1 | 6 | The M–T pair has the lowest total requirements. Assign Employee 6 to a W-Su schedule. |
| 2 | 0 | 2 | 3 | 4 | 1 | 0 | 7 | The S–Su pair has the lowest total requirements. Assign Employee 7 to a M-F schedule. |
| 1 | 0 | 1 | 2 | 3 | 1 | 0 | 8 | Four pairs have the minimum requirement and the lowest total. Choose the S–Su pair according to the tie-breaking rule. Assign Employee 8 to a M-F schedule. |
| 0 | 0 | 0 | 1 | 2 | 1 | 0 | 9 | Arbitrarily choose the Su–M pair to break ties because the S–Su pair does not have the lowest total requirements. Assign Employee 9 to a T-S schedule. |
| 0 | 0 | 0 | 0 | 1 | 0 | 0 | 10 | Choose the S–Su pair according to the tie-breaking rule. Assign Employee 10 to a M-F schedule. |
Example 10.2
| The S–Su pair has the lowest total requirements. Assign Employee 1 to a M-F schedule. |
| The S–Su pair has the lowest total requirements. Assign Employee 2 to a M-F schedule. |
| The S–Su pair has the lowest total requirements. Assign Employee 3 to a M-F schedule. |
| 6 | 4 | 8 | 9 | 10 | 3 | 2 | 1 |
| 5 | 3 | 7 | 8 | 9 | 3 | 2 | 2 |
| 4 | 2 | 6 | 7 | 8 | 3 | 2 | 3 |
| 3 | 1 | 5 | 6 | 7 | 3 | 2 | 4 | The M–T pair has the lowest total requirements. Assign Employee 4 to a W-Su schedule. |
| 3 | 1 | 4 | 5 | 6 | 2 | 1 | 5 | The S–Su pair has the lowest total requirements. Assign Employee 5 to a M-F schedule. |
| 2 | 0 | 3 | 4 | 5 | 2 | 1 | 6 | The M–T pair has the lowest total requirements. Assign Employee 6 to a W-Su schedule. |
| 2 | 0 | 2 | 3 | 4 | 1 | 0 | 7 | The S–Su pair has the lowest total requirements. Assign Employee 7 to a M-F schedule. |
| 1 | 0 | 1 | 2 | 3 | 1 | 0 | 8 | Four pairs have the minimum requirement and the lowest total. Choose the S–Su pair according to the tie-breaking rule. Assign Employee 8 to a M-F schedule. |
| 0 | 0 | 0 | 1 | 2 | 1 | 0 | 9 | Arbitrarily choose the Su–M pair to break ties because the S–Su pair does not have the lowest total requirements. Assign Employee 9 to a T-S schedule. |
| 0 | 0 | 0 | 0 | 1 | 0 | 0 | 10 | Choose the S–Su pair according to the tie-breaking rule. Assign Employee 10 to a M-F schedule. |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
36
Example 10.2
| Final Schedule | ||||||||
| Employee | M | T | W | Th | F | S | Su | Total |
| 1 | X | X | X | X | X | off | off | |
| 2 | X | X | X | X | X | off | off | |
| 3 | X | X | X | X | X | off | off | |
| 4 | off | off | X | X | X | X | X | |
| 5 | X | X | X | X | X | off | off | |
| 6 | off | off | X | X | X | X | X | |
| 7 | X | X | X | X | X | off | off | |
| 8 | X | X | X | X | X | off | off | |
| 9 | off | X | X | X | X | X | off | |
| 10 | X | X | X | X | X | off | off | |
| Capacity, C | 7 | 8 | 10 | 10 | 10 | 3 | 2 | 50 |
| Requirements, R | 6 | 4 | 8 | 9 | 10 | 3 | 2 | 42 |
| Slack, C – R | 1 | 4 | 2 | 1 | 0 | 0 | 0 | 8 |
In this example, Friday always has the maximum requirements and should be avoided as a day off.
The final schedule for the employees is shown in the following table.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
37
Sequencing Jobs at a Workstation
Priority Sequencing Rules
First-come, first-served (FCFS)
Earliest due date (EDD)
Performance Measures
Flow Time
Flow time = Finish time + Time since job arrived at workstation
Past Due (Tardiness)
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
Example 10.3
Currently a consulting company has five jobs in its backlog.
Determine the schedule by using the FCFS rule, and calculate the average days past due and flow time.
How can the schedule be improved, if average flow time is the most critical?
| Customer | Time Since Order Arrived (days ago) | Processing Time (days) | Due Date (days from now) |
| A | 15 | 25 | 29 |
| B | 12 | 16 | 27 |
| C | 5 | 14 | 68 |
| D | 10 | 10 | 48 |
| E | 0 | 12 | 80 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
39
Example 10.3
| 27 | 14 |
| 12 | 53 |
| 41 | + | 10 | = | 51 | 48 | 3 | 10 | 61 |
| 51 | + | 14 | = | 65 | 68 | 0 | 5 | 70 |
| 65 | + | 12 | = | 77 | 80 | 0 | 0 | 77 |
| 15 | 40 |
| + | 25 | = | 25 |
| 29 | 0 |
| 0 |
| 25 |
| + | 16 | = | 41 |
| Customer Sequence | Start Time (days) | Processing Time (days) | Finish Time (days) | Due Date | Days Past Due | Days Ago Since Order Arrived | Flow Time (days) | ||
| A | |||||||||
| B | |||||||||
| C | |||||||||
| D | |||||||||
| E |
The FCFS rule states that Customer A should be the first one in the sequence, because that order arrived earliest—15 days ago.
Customer E’s order arrived today, so it is processed last.
The sequence is shown in the following table, along with the days past due and flow times.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
40
Example 10.3
The finish time for a job is its start time plus the processing time. Its finish time becomes the start time for the next job in the sequence, assuming that the next job is available for immediate processing. The days past due for a job is zero (0) if its due date is equal to or exceeds the finish time. Otherwise it equals the shortfall. The flow time for each job equals its finish time plus the number of days ago since the order first arrived at the workstation. The days past due and average flow time performance measures for the FCFS schedule are
Average days past due =
Average flow time =
= 3.4 days
= 60.2 days
0 + 14 + 3 + 0 + 0
5
40 + 53 + 61 + 70 + 77
5
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
41
Example 10.3
b. Using the STP rule, the average flow time can be reduced with this new sequence.
| 0 | + | 10 | = | 10 |
| Customer Sequence | Start Time (days) | Processing Time (days) | Finish Time (days) | Due Date | Days Past Due | Days Ago Since Order Arrived | Flow Time (days) | ||
| D | |||||||||
| E | |||||||||
| C | |||||||||
| B | |||||||||
| A |
Average days past due =
Average flow time =
= 14.6 days
= 47.8 days
0 + 0 + 0 + 25 + 48
5
20 + 22 + 41 + 64 + 92
5
| 22 | + | 14 | = | 36 | 68 | 0 | 5 | 41 |
| 36 | + | 16 | = | 52 | 27 | 25 | 12 | 64 |
| 52 | + | 25 | = | 77 | 29 | 48 | 15 | 92 |
| 48 | 0 |
| 10 | 20 |
| 10 | + | 12 | = | 22 |
| 80 | 0 |
| 0 | 22 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
42
A consulting company has five jobs in its backlog. A schedule was created using the FCFS rule and the average days past due was 3.4 days and the average flow time was 60.2 days. Create a new schedule using the EDD rule, calculating the average days past due and flow time. In this case, does EDD outperform the FCFS rule?
Application 10.4
| Customer | Time Since Order Arrived (days ago) | Processing Time (days) | Due Date (days from now) |
| A | 15 | 25 | 29 |
| B | 12 | 16 | 27 |
| C | 5 | 14 | 68 |
| D | 10 | 10 | 48 |
| E | 0 | 12 | 80 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
43
| Customer Sequence | Start Time (days) | Processing Time (days) | Finish Time (days) | Due Date | Days Past Due | Days Ago Since Order Arrived | Flow Time (days) | ||
| B | |||||||||
| A | |||||||||
| D | |||||||||
| C | |||||||||
| E |
Application 10.4
| 0 | + | 16 | = | 16 |
| 41 | + | 10 | = | 51 | 48 | 3 | 10 | 61 |
| 51 | + | 14 | = | 65 | 68 | 0 | 5 | 70 |
| 65 | + | 12 | = | 77 | 80 | 0 | 0 | 77 |
| 27 | 0 |
| 12 | 28 |
| 16 | + | 25 | = | 41 |
| 29 | 12 |
| 15 | 56 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
44
Application 10.4
The days past due and average flow time performance measures for the EDD schedule are:
By both measures, EDD outperforms the FCFS.
However, the solution found in Example 15.3 still has the best average flow time of only 47.8 days
Average days past due =
Average flow time =
= 3.0 days
= 58.4 days
0 + 12 + 3 + 0 + 0
5
28 + 56 + 61 + 70 + 77
5
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
45
Software Support
Computerized scheduling systems are available to cope with the complexity of workforce scheduling.
Software is also available for sequencing jobs at workstations.
Advance planning and scheduling (APS) systems seek to optimize resources across the supply chain and align daily operations with strategic goals.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
46
Solved Problem 1
The Cranston Telephone Company employs workers who lay telephone cables and perform various other construction tasks.
The company prides itself on good service and strives to complete all service orders within the planning period in which they are received.
Each worker puts in 600 hours of regular time per planning period and can work as many as an additional 100 hours of overtime.
The operations department has estimated the following workforce requirements for such services over the next four planning periods:
| Planning Period | 1 | 2 | 3 | 4 |
| Demand (hours) | 21,000 | 18,000 | 30,000 | 12,000 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
47
Solved Problem 1
Cranston pays regular-time wages of $6,000 per employee per period for any time worked up to 600 hours (including undertime). The overtime pay rate is $15 per hour over 600 hours. Hiring, training, and outfitting a new employee costs $8,000. Layoff costs are $2,000 per employee. Currently, 40 employees work for Cranston in this capacity. No delays in service, or backorders, are allowed.
a. Prepare a chase strategy using only hiring and layoffs. What are the total numbers of employees hired and laid off?
b. Develop a workforce plan that uses the level strategy, relaying only on overtime and undertime. Maximize the use of overtime during the peak period so as to minimize the workforce level and amount of undertime.
c. Propose an effective mixed-strategy plan.
d. Compare the total costs of the three plans.
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
48
Solved Problem 1
a. Chase Strategy
Figure 10.9
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
49
Solved Problem 1
b. Level Strategy
Figure 10.10
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
50
Solved Problem 1
Figure 10.11
c. Mixed Strategy
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
51
Solved Problem 1
d. Total Cost of Plans
CHASE = $1,050,000
LEVEL = $1,119,000
MIXED = $1,021,000
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
52
Solved Problem 2
The Food Bin grocery store operates 24 hours per day, 7 days per week.
Fred Bulger, the store manager, has been analyzing the efficiency and productivity of store operations recently. Bulger decided to observe the need for checkout clerks on the first shift for a one-month period.
At the end of the month, he calculated the average number of checkout registers that should be open during the first shift each day.
His results showed peak needs on Saturdays and Sundays.
| Day | M | T | W | Th | F | S | Su |
| Number of Clerks Required | 3 | 4 | 5 | 5 | 4 | 7 | 8 |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
53
Solved Problem 2
Bulger now has to come up with a workforce schedule that guarantees each checkout clerk two consecutive days off but still covers all requirements.
a. Develop a workforce schedule that covers all requirements while giving two consecutive days off to each clerk. How many clerks are needed? Assume that the clerks have no preference regarding which days they have off.
b. Plans can be made to use the clerks for other duties if slack or idle time resulting from this schedule can be determined. How much idle time will result from this schedule, and on what days?
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
54
Solved Problem 2
We use the method demonstrated in Example 15.2 to determine the number of clerks needed.
The minimum number of clerks is eight.
| 3 | 4 | 5 | 5 | 4 | 7 | 8 |
| off | off | X | X | X | X | X |
| 3 | 4 | 4 | 4 | 3 | 6 | 7 |
| off | off | X | X | X | X | X |
| Day | |||||||
| M | T | W | Th | F | S | Su | |
| Requirements | |||||||
| Clerk 1 | |||||||
| Requirements | |||||||
| Clerk 2 | |||||||
| Requirements | |||||||
| Clerk 3 | |||||||
| Requirements | |||||||
| Clerk 4 |
| 3 | 4 | 3 | 3 | 2 | 5 | 6 |
| X | X | X | off | off | X | X |
| 2 | 3 | 2 | 3 | 2 | 4 | 5 |
| X | X | X | off | off | X | X |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
55
Solved Problem 2
| 1 | 2 | 1 | 3 | 2 | 3 | 4 |
| X | off | off | X | X | X | X |
| 0 | 2 | 1 | 2 | 1 | 2 | 3 |
| off | off | X | X | X | X | X |
| 0 | 2 | 0 | 1 | 0 | 1 | 2 |
| X | X | off | off | X | X | X |
| 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| X | X | X | X | off | off | X |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Day | |||||||
| M | T | W | Th | F | S | Su | |
| Requirements | |||||||
| Clerk 5 | |||||||
| Requirements | |||||||
| Clerk 6 | |||||||
| Requirements | |||||||
| Clerk 7 | |||||||
| Requirements | |||||||
| Clerk 8 | |||||||
| Requirements |
Copyright ©2016 Pearson Education, Inc. All rights reserved.
10-‹#›
56
Solved Problem 2
b. Based on the results in part (a), the number of clerks on duty minus the requirements is the number of idle clerks available for other duties:
The slack in this schedule would indicate to Bulger the number of employees he might ask to work part time (fewer than 5 days per week).
For example, Clerk 7 might work Tuesday, Saturday, and Sunday and Clerk 8 might work Tuesday, Thursday, and Sunday.
That would eliminate slack from the schedule.
| M | T | W | Th | F | S | Su | |
| Number on duty | 5 | 4 | 6 | 5 | 5 | 7 | 8 |
| Requirements | 3 | 4 | 5 | 5 | 4 | 7 | 8 |
| Idle clerks | 2 | 0 | 1 | 0 | 1 | 0 | 0 |