Reading Assignment Report -II
Supply chain focus dependent safety stock placement
Gangaraju Vanteddu Æ Ratna Babu Chinnam Æ Kai Yang Æ Oleg Gushikin
Published online: 18 April 2008
� Springer Science+Business Media, LLC 2008
Abstract Increasing globalization, growing product range diversity, and rising consumer awareness are making markets highly competitive, forcing supply chains
to adapt constantly to different stimuli. Growing competition between supply chains
(as well as players within them) is also warranting a priority for overall supply chain
performance over the goals of individual players. It is now well established in the
literature that, among the many order winners, both overall supply chain cost and
responsiveness (i.e., supply chain lead time) are the most significant determinants of
supply chain competitiveness. The literature, however, mostly focuses on supply
chain cost minimization with rather simplistic treatment of responsiveness. By
introducing the concept of a coefficient of inverse responsiveness (CIR), we facil-
itate efficient introduction of responsiveness related costs into the scheme of supply
chain (SC) performance evaluation and/or optimization. Thus, our model aids
supply chain managers in achieving better strategic fit between individual business
unit strategies and overall supply chain requirements in terms of cost efficiency and
responsiveness. In particular, it aids in strategic placement of safety stocks at dif-
ferent stages in the supply chain. Our model also offers managerial insights that help
improve our intuitions into supply chain dynamics. The model is more suited for
G. Vanteddu � R. B. Chinnam (&) � K. Yang Department of Industrial & Manufacturing Engineering, Wayne State University,
4815 Fourth Street, Detroit, MI 48202, USA
e-mail: [email protected]
G. Vanteddu
e-mail: [email protected]
K. Yang
e-mail: [email protected]
O. Gushikin
Ford Research and Advanced Engineering, 2101 Village Road, Dearborn, MI 48121, USA
e-mail: [email protected]
123
Int J Flex Manuf Syst (2007) 19:463–485
DOI 10.1007/s10696-008-9050-z
strategic SC alignment, for example, when dealing with product changeovers or
introduction of new product, rather than for operational control.
Keywords Supply chain strategy � Business strategy � Safety stock costs � Cost of responsiveness � Supply chain cycle time � Coefficient of inverse responsiveness
1 Introduction
In today’s dynamic global market environment, it has become necessary for
organizations to focus upon all the relevant performance metrics. Hill (1993)
advocates close attention to functional perspectives, customers’ views, and actual
orders while determining order winners and qualifiers. Among the possible order
winners, supply chain (SC) cost and responsiveness turn out to be more crucial than
others. Responsiveness here is the ability of the supply chain to respond quickly to
changing customer needs, preferences, and options through improved supply chain
cycle time (i.e., velocity), and not the higher service levels achievable through
increased distribution of channel inventory. The optimal supply chain strikes the
right balance between supply chain cost efficiency and responsiveness, depending
on the nature of product(s) supplied by it.
Figure 1 divides the cost-responsiveness spectrum of the SC into four basic
quadrants, and provides some indications of their appropriateness. In reality, the
treatment will not be that distinct, and depending on the type of products and
markets targeted by the SC, the focus could be anywhere on the spectrum. In this
context, Fisher (1997) emphasizes the importance of considering the nature of
product demand before devising the respective supply chains. More precisely, one
needs to account for both the nature of the product as well as uncertainty from both
demand and supply in designing the SC (Chopra and Meindl 2004). Similar
comments have been echoed in industry literature. Nazzal et al. (2006) present a
case study for Agere Systems, focusing upon the increase of market share and
profits by reducing lead times in the highly competitive semiconductor manufac-
turing industry. So is the example of Revlon whose supply chain includes more than
5,000 active finished good stock keeping units (SKUs) with product lifecycles
spanning less than 3 years. To meet aggressive inventory reduction targets and
achieving high customer service levels, Revlon is emphasizing reduction of
manufacturing and supplier lead times and the associated variability (Davis et al.
2005). Yang and Geunes (2007) emphasize that longer lead times, in addition to
reducing customer responsiveness, increase demand forecast error, since forecast
error generally increases as the forecast horizon increases. In addition, longer lead
times expose the supply chain to more in-process inventories, design changes,
degradation, accidents, changes in demand patterns, etc. (Felgate et al. 2007), which
in turn increase the supply chain costs. In summary, striking the right balance
between supply chain cost efficiency and responsiveness is critical, which can be
neglected at one’s own peril. On the contrary, existing literature overly focuses on
just one order winner: cost efficiency.
464 G. Vanteddu et al.
123
There are primarily four drivers influencing the performance of the SC, namely,
infrastructure, inventories, transportation, and information (Chopra and Meindl
2004). Given our assumption that the necessary network topology is already in
place, we do not need to include infrastructure related cost elements and
transportation related aspects explicitly in our model. These issues, however, are
addressed in an indirect fashion in our model. For example, cost added at a stage can
be considered to be a function of fixed costs associated with infrastructure such as
location, buildings, machinery, etc. and transportation to the immediate downstream
(D/S) stage. Even though we are developing the model assuming that all the stages
are involved in manufacturing, a stage purely dealing with transportation could be
easily accommodated. We are also assuming information symmetry at all the stages
and leave information asymmetry related issues for future research. Thus, we are
primarily considering the inventory cost driver in our model.
Among inventory cost elements, safety stock, maintained to account for the
internal and external variability in the supply chain, is vital in the sense that it
directly affects customer satisfaction and constitutes a significant portion of the cost
of goods sold (COGS).
In summary, in terms of supply chain strategy, one can choose to compete purely
on price (for a commodity product) or product velocity (fashion industry, for
example) or choose a third path, a niche strategy, a hybrid of the other two
(Cherukuri et al. 1995). Our research primarily focuses upon the third strategy,
where there are opportunities to be exploited with respect to both order winners.
The rest of this manuscript is organized as follows: Sect. 2 discusses relevant
literature; Sect. 3 deals with development of the overall cost expression for the
supply chain, which accounts for supply chain (SC) responsiveness; Sect. 4 offers
managerial insights into strategic safety stock placement in a serial supply chain;
Sect. 5 describes how one can use the model for achieving the strategic fit; finally,
H ig
h L
ow
C os
t
Low High
Responsiveness
Poor Strategy
Short Lifecycle Products
Mass Production
Ideal Strategy
Fig. 1 Supply chain responsiveness versus cost (source: Vanteddu et al. 2006)
Supply chain focus dependent safety stock placement 465
123
Sect. 6 offers conclusions and limitations that should be addressed in future
research.
2 Literature review
Gallego and Zipkin (1999) develop and analyze several heuristic methods to study
the problem of stock positioning in serial production-transportation systems and
offer a number of interesting insights into the nature of the optimal solution. A
stochastic service model as advocated by Graves and Willems (2003) addresses the
issue of strategic placement of safety stocks across a multi-echelon SC in the
presence of demand uncertainty. As with Graves and Willems (2003), the primary
emphasis of our research is to provide decision support for SC design, rather than
SC operation, and the intent is not to find inventory control policies as is the case
with much of the multi-echelon inventory literature. Another common feature is that
the local decisions (decentralized control as opposed to central control) are made at
each stage based on local information. It is worth noting at this point, as supported
by Graves and Willems (2003), that a SC subjected to decentralized control is not
equivalent to a SC being locally optimized. In an optimization context, the model
attempts to find the optimal parameter values, under the assumption of decentralized
control, that minimize the total SC cost. The primary purpose of their model is to
develop a multi-echelon model, and the relevant optimization algorithm is
specifically designed for optimizing the placement of safety stocks in a real-world
SC. Unlike Graves and Willems (2003), where inventory is the only lever to counter
demand and supply variability, our model has two levers, namely, echelon inventory
and responsiveness (cycle time).
The supply chain configuration problem, a special case of the supply chain design
problem, consists of the set of decisions that are made after the network design that
act to configure each stage in the network by taking into account certain relevant
parameters; see Graves and Willems (2003), who argue that the central question is
to determine what suppliers, parts, processes, transportation modes (called options)
to select at each stage in the supply chain. Our model is similar in spirit to their
optimization model (Graves and Willems 2003). The primary similarity is that both
models balance the increase in cost of goods sold (COGS) against the decrease in
inventory related cost, though the two models differ significantly with regard to the
methodology adopted and serve different end purposes.
For a stochastic service model (Graves and Willems 2003; Simchi-Levi and Zhao
2005; Lee and Billington 1993; Ettl et al. 2000), which we have adopted in our model,
we assume that the increase in cost at a stage depends on the opportunities that exist for
resource flexibility and model it as a continuous function of a novel dimensionless
parameter called the coefficient of inverse responsiveness (CIR), with a focus on: (a)
developing managerial insights with regard to strategic safety stock placement in a
serial supply chain and (b) achieving strategic fit between the supply chain strategy and
the individual business strategies for a given set of parameter values.
Assuming an installation, continuous time base stock policy for supply chains
with tree network structures, another interesting paper that is based on the stochastic
466 G. Vanteddu et al.
123
service model concept is that by Simchi-Levi and Zhao (2005) in which they derive
recursive equations for the back order delay (because of stock out) at all stages in
the supply chain, and, based on those recursive equations, dependencies of the back
order delays across different stages of the network are characterized and useful
insights with respect to the safety stock positioning are developed in various supply
chain topologies. The two other papers that use a stochastic service approach that
are relevant to our research are those by Lee and Billington (1993) and Ettl et al.
(2000). We share the ample production capacity assumption with Simchi-Levi and
Zhao (2005) and Graves and Willems (2003). For capacitated models using a
modified base stock policy, the reader can refer to Glasserman and Tayur (1995,
1996) and Kapuscinski and Tayur (1999). Simchi-Levi and Zhao (2005) enhance the
work of Gallego and Zipkin (1999) and provide stronger results. They also point out
through their computational study of the Bulldozer supply chain problem (Graves
and Willems 2003) the perils of ignoring lead time uncertainties, which is accounted
for in our model. In addition, Simchi-Levi and Zhao (2005) present a nice summary
of the literature for installation policies that are used in various network topologies:
multistage serial systems (Simpson 1958; Hanssmann 1959; Lee and Zipkin
1992) and distribution systems (Axsäter 1993; Graves 1985; Lee and Moinzadeh
1987a, b).
Given the size and complexity of supply chains such as those found in the
computer, electronics, and auto industries, a common problem for asset managers is
not knowing how to quantify the trade-off between service levels and the investment
in inventory required to support those service levels (Ettl et al. 2000). This problem
is compounded by the response related performance measures. Similar to Ettl et al.
(2000) model, our model is also intended to be a strategic model not caring much
about the operational details.
Eppen and Martin (1988) present a very nice critique of the standard procedure
using a (Q,r) model for setting safety stocks in the presence of stochastic lead time and demand. Chopra et al. (2004) build on the work of Eppen and Martin (1988) but
their focus is on the flaws in the managerial prescriptions implied by the normal
approximation. In particular they infer the following by using the exact demand
during the lead time instead of the normal approximation: For cycle service levels
above 50% but below a threshold, reducing lead time variability increases the
reorder point and safety stock, whereas reducing the lead time decreases the reorder
point and safety stock. Our research addresses the issue of reducing lead time
variability indirectly as a result of reducing the lead time because of the flexibility
options available at a stage.
For a thorough comparison of installation and echelon stock policies for
multilevel inventory control, the reader is referred to Axsäter and Rosling (1993),
who primarily consider serial and assembly systems and prove that for (Q,r) rules echelon stock policies are, in general, superior to installation stock policies.
Advocating the necessity of models that include both cost and responsiveness,
Moon and Choi (1998) suggest extending the lead time reduction concept to
different inventory models to justify the investment to reduce the lead times. Choi
(1994) used an expediting cost function to reduce the variance of suppliers’ lead
times.
Supply chain focus dependent safety stock placement 467
123
As opposed to network design models that focus on the trade-off between the
fixed costs of locating facilities and variable transportation costs between facilities
and customers, Sourirajan et al. (2007) present a model for single-product
distribution network design problem with lead times and service level requirements,
which enables them to capture the trade-off between lead times and inventory risk
pooling benefits. The objective is to locate distribution centers (DCs) in the network
such that the sum of the location and inventory (pipeline and safety stocks) is
minimized. Our CIR concept is similar in spirit to the replenishment lead time
calculation at a DC (Sourirajan et al. 2007), which depends upon the volume of flow
through the DC.
One very interesting (Q,r) model with stochastic lead times that could serve as a building block in supply chain management was proposed by Bookbinder and
Cakanyildirim (1999) as opposed to the constant lead time assumption in many
other studies. This paper introduces a term called an expediting factor for the lead
time, which is similar in spirit to the dimensionless quantity proposed in our model,
CIR. Ryu and Lee (2003) consider dual sourcing models with stochastic lead times
in which lead times are reduced at a cost that can be viewed as an investment. They
make use of the concept of expediting factors proposed by Bookbinder and
Cakanyildirim (1999) in their model. They analyze (Q,r) models with and without lead time reduction and compare the expected total cost per unit time for the two
models.
Even though we did not consider product mix flexibility related issues in our
model, the reader can refer to Upton (1997) to explore the relationship between
process range flexibility and structure, infrastructure and managerial policy at the
plant level. We assume information symmetry at all the stages in our model. The
effect of information sharing for the time series structure of the demand on safety
stocks is addressed in Gaur et al. (2005).
3 Model development
This section mostly develops the total cost expression, made up of safety stock costs
and responsiveness related costs, for a serial supply chain.
3.1 Expression for safety stock costs
We follow the building block model (Graves and Willems 2003) with installation
base stock policies and a common underlying review period for all stages. A
typical base stock policy works as follows. When the inventory position (i.e., on-
hand plus on-order minus back orders) at stage i falls below some specified base stock level Bi, the stage places a replenishment order, thereby keeping the inventory position constant. Simchi-Levi and Zhao (2005) attribute the popularity
of the base stock policy to the fact that it is simple, easily implementable, and has
been proven to be optimal or close to optimal in many cases. For example, in
serial supply chains with zero setup costs and without capacity constraints,
because the installation base stock policy is equivalent to an echelon base stock
468 G. Vanteddu et al.
123
policy under certain initial conditions (Axsäter and Rosling 1993), it is indeed
optimal in these cases (Clark and Scarf 1960). In serial systems, even a modified
base stock policy with capacity constraints is still close to optimal (Speck and van
der Wall 1991; van Houtum et al. 1996).
In an installation policy, each facility only needs the inputs from the immediate
upstream (U/S) and downstream (D/S) facilities and makes ordering decisions based
on its local order and inventory status (Simchi-Levi and Zhao 2005) as opposed to
an echelon base stock policy, which is a centralized control scheme that allows for a
central decision maker to coordinate and control the actions at all stages in the SC
(Graves and Willems 2003).
Even though our model assumes all stages to be manufacturing stages, without
loss of generality, a stage could be modeled as a DC as well. A pure transportation
function can also be modeled with the building block concept, wherein the transport
time is the lead time with pipeline inventories.
Orders are placed at discrete time intervals and each stage is considered as a
building block (Graves 1988) that generates a stochastic lead time. A building block
is typically a processor plus a stock keeping facility. Depending on the scope and
granularity of the analysis being performed, the stage could represent anything from
a single step in manufacturing or distribution process to a collection of such steps to
an entire assembly and test operation (Graves and Willems 2003). Demand is
assumed to be stationary and uncorrelated across nonoverlapping intervals and there
are no capacity constraints.
Our model is designed as a decentralized supply chain (Graves and Willems
2003; Lee and Billington 1993) to mimic reality more closely, with each stage
following a local base stock policy. Supporting the same view, Lee and Billington
(1993) state that organizational barriers and restricted information flows between
stages may result in complete centralized control of material flow in a supply chain
not being feasible or desirable.
The primary distinction between centralized and decentralized supply chain is
put in the following succinct form by Lee and Billington (1993) ‘‘Centralized
control means that decisions on how much and when to produce are made centrally,
based on material and demand status of the entire system. Decentralized control, on
the other hand, refers to cases where each individual unit in the supply chain makes
decisions based on local information’’.
Assuming that each building block operates independently using a simple
installation policy, one can first characterize various building blocks such as serial,
assembly, distribution, etc. and then identify the links among these building blocks
(Simchi-Levi and Zhao 2005). We have chosen series system for simplicity of
analysis and primarily to develop certain insights that are insensitive to the specific
supply chain topology. Also, other networks such as assembly system can be
reduced to an equivalent series system (Rosling 1989). Most of the features are
similar to the features of a serial system presented in Gallego and Zipkin (1999)
with some modifications.
There are several stages or stocking points arranged in series. The first stage
receives supplies from an external source. Demand occurs only at the last stage.
Demands that cannot be fulfilled are immediately backlogged. There is one product,
Supply chain focus dependent safety stock placement 469
123
or more precisely, one per stage. To move units to one stage from its predecessor,
the goods must pass through a supply system representing production or
warehousing activities. There is an inventory holding cost at each stage and our
model does not consider back-order penalty cost, which could easily be included.
The horizon is finite, all data are stationary, and the objective is to evaluate the
performance and optimize depending upon the supply chain focus on the cost–
responsiveness spectrum. Information is centralized but control is decentralized.
As in Gallego and Zipkin (1999), the numbering of the stages follows the flow of
goods; stage 1 is the first, and demand occurs at the last stage. The external source,
which supplies stage 1, has ample stock and it responds immediately to orders
(Fig. 2).
We have assumed that the service level targets required at each of the players
are exogenous, i.e., they are dictated by the immediate D/S player or the final
customer. Following Graves and Willems’ (2003) treatment of stochastic service
model in supply chains, let U(k1), …, U(kn) be the service levels for corresponding safety factors k1, …, kn where U(ki) represents the cumulative distribution function for a standard normal variable. kj is the multiplying factor for the variability term for stage j, which along with the average in process inventory would give the expected base stock to achieve a given service level. Let the
processing time at stage j be a random variable sj (measured in time periods) with mean Lj and variance r2j :
The stochastic service model (Graves and Willems 2003; Simchi-Levi and Zhao
2005; Lee and Billington 1993; Ettl et al. 2000) assumes that the delivery or service
time between stages varies based on the material availability at that stage and that
each stage in the supply chain maintains a base stock that is sufficient to meet its
service level target (Graves and Willems 2003). If Di is the random delay at the preceding stage i, then the replenishment cycle time at stage j equals
cj ¼ sj þ Di: ð1Þ
We have adopted the procedure for calculating this delay due to the stock out at the
preceding stage as presented in Graves and Willems (2003) and Ettl et al.(2000)
with a modification that takes into account the fact that there is only one player at
the preceding stage. Thus, we are assuming that the expected value of this delay is
simply equivalent to the probability of stock out at the preceding stage pi times its average processing time.
Therefore, expected replenishment cycle time at stage j is given by
E cj � � ¼ Lj þ piLi; ð2Þ
where
pi ¼ 1� UðkiÞ ð3Þ
Assuming that the demand is N(l,r2 ), where l is the mean demand during one time period and r2 is the demand variance during one time period, to satisfy average demand l, given the average replenishment cycle time from (2), the average cycle stock is given by
470 G. Vanteddu et al.
123
l� Lj þ 1� UðkiÞð ÞLi � �
: ð4Þ
Assuming the independence of processing times at a stage and between the stages,
we realize that
r2Di ¼ r 2 i ð1� UðkiÞÞ ð5Þ
r2cj ¼ r 2 j þ r2i ð1� UðkiÞÞ: ð6Þ
When the demands are uncorrelated between time periods, then the mean and
variance of the demand during replenishment period for stage j denoted by the continuous random variable WJ are obtained as follows by slightly modifying the equations to account for the portion of the lead time variability transferred from the
preceding stage (see, for example, Eppen and Martin 1988 and Feller 1960).
lWj ¼ lE½cj� r2Wj ¼ r
2E½cj� þ r2cjl 2:
ð7Þ
Now, we introduce another parameter cj, termed the coefficient of inverse respon- siveness (CIR), defined as the ratio of the average demand to the rate of production
(throughput) pj:
cj ¼ l=pj: ð8Þ
Assuming that there is enough capacity at all the stages to satisfy a given demand, cj B 1 at all times. When cj = 1, the expected replenishment cycle time is given by (2). We also assume that there is some upper bound above which the rate of production
cannot be increased further. The CIR at a stage is similar to the expediting factor
proposed by Bookbinder and Cakanyildirim (1999). They define the expediting
factor s as the constant of proportionality between the random variables ~T (the expedited lead time) and T(ordinary lead time). For expedited orders (s\ 1), shorter than average lead time can be obtained at a cost. Similarly, longer mean lead
time results in a rebate for the customer when (s[ 1). By considering a model with three decision variables (Q,r,s), they show that the expected cost per unit time is jointly convex in the decision variables and obtain the global best solution.
Keeping the average cycle stock constant (given in (4)), from Little’s law, at
expedited rates of production (cj\ 1), average replenishment cycle time for player j, when operating at a CIR level cj will be equivalent to
E cj � � ¼ ðLj þ ð1� UðkiÞÞLiÞcj; ð9Þ
r2cj ¼ ðr 2 j þ r2i ð1� UðkiÞÞÞcj: ð10Þ
As cj decreases, the average replenishment cycle time for player j decreases, which means that player j is becoming more responsive. Because of this inverse relationship between cj and the responsiveness at stage j, cj is termed the coefficient of inverse responsiveness at stage j.
In light of Eqs. 9 and 10, we assume that demand during replenishment period WJ for stage j is normally distributed as follows:
Supply chain focus dependent safety stock placement 471
123
lWj ¼ lE cj � �
rWj ¼ ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffi r2E cj
� � þ ðr2cjÞl
2 q : ð11Þ
This equation considers both the demand variability and the replenishment cycle
time variability. Replenishment cycle time variability is made up of two
components:
1. The processing time variability at stage j. 2. The portion of the processing time variability at stage i that is transferred to
stage j.
We assume that base stock at stage j is given by Bj ¼ lE cj � � þ kjrWj ; where kj is
the safety factor to achieve the service level target U(kj) for that stage. After accounting for the average demand over the replenishment period, expected
on-hand inventory is given by
E Ij � � ¼ kjrWj : ð12Þ
By augmenting the above expression with the following term, which is the expected
number of back orders (Graves and Willems 2003; Ettl et al. 2000),
E BO½ � ¼ rWj Z1
z¼kj
ðz� kjÞ/ðzÞdz ð13Þ
we realize the following expression for the expected safety stock at stage j:
E SSj � �
¼ rWj kj þ Z1
z¼kj
ðz� kjÞ/ðzÞdz
0
B@
1
CA: ð14Þ
At stage j, let Cj be the nominal cumulative cost of the product realized when cj = 1, and let hj be the holding cost rate per period. The per-unit holding cost of safety stock at stage j per period equals Cj hj. The total safety stock holding cost at stage j per period is given by:
CSSCj ¼ CjhjE SSj � �
: ð15Þ
Total safety stock holding cost for the supply chain per period is given by:
CSSC ¼ Xn
j¼1 CSSCj : ð16Þ
3.2 Expression for responsiveness related costs
When players (1, …, n) operate with their respective CIRs, being (c1 , …, cn), stage j incurs two types of responsiveness related costs, as described below.
472 G. Vanteddu et al.
123
3.2.1 Direct responsiveness related costs
The difference in nominal cumulative costs of the product at two consecutive stages
j and i (i.e., Cj - Ci) will increase by a value that is assumed to be a function of (1 - cj). This is the cost that stage j will pay for operating at a higher processing speed that lowers the average replenishment cycle time at stage j.
The increase in cost is typically due to increase in investment in the so-called 5M
resources (i.e., manpower, machine, methods, material, and measurement). We are
addressing the issue of cycle time reduction due to the opportunities for flexibility
available at a stage which can be harnessed at a cost. This should not be confused
with cycle time reductions due to better operational efficiencies such as efficient
removal of wastes from the processes such as downtime, setup time, etc, which we
will consider in the extension of this framework. Flexibility related costs will
increase/decrease depending on how flexible these 5M resources are at a stage.
Direct response related costs at stage j per period are given by
DRCj ¼ ½f ð1� cjÞ�ðCj � CiÞl: ð17Þ
Even though we do not advocate any specific function type for modeling f(1 - cj), the cost of volume flexibility function (COF), we strongly recommend that it be
derived from the historical data. For example, for a specific average demand, from
the past data one could fit a regression model between (1 - cj) and the incremental cost at a stage. Moon and Choi (1998) advocate the use of a piecewise linear
crashing cost function that is widely used in project management in which the
duration of some activities can be reduced by assigning more resources to the
activities. They used a piecewise linear crashing cost function in their model. Ben-
Daya and Raouf (1994) could be a useful reference when considering using other
types of crashing cost functions.
Bookbinder and Cakanyildirim (1999) assume the expediting cost per unit
(because of technological investments or hiring extra workers etc.) time w(s) to be a decreasing convex function of the expediting factor with w(1) = 0 (additional cost when CIR = 1 is zero in our model as well). As opposed to our model, they allow
w(s) to take negative values for s[ 1, meaning that for longer lead times they assume that the manufacturer gives the buyer some rebate per unit time.
Proceeding from the research of Bookbinder and Cakanyildirim (1999), Ryu and
Lee (2003) chose their expediting cost functions w1 (s1) and w2(s2) to be decreasing convex functions of the expediting factors s1 and s2. They considered w1 (s1) = c1 (-1 + 1/s1) and w2(s2) = c2 (-1 + 1/s2), where c1 and c2 are positive coefficients. Our cost function, for example Eq. 17, looks similar in spirit to these cost functions.
Yang and Geunes (2007) expect the cost of reducing procurement time, because
of supplier’s investment in production processes or technologies, to increase at a
nondecreasing rate with the amount of lead time reduction and therefore employ a
convex function for lead time reduction. They consider a piecewise linear, convex
and decreasing form (as the production lead time increases) for the unit procurement
cost function but note that their analysis of this function applies to general piecewise
linear functions and convexity is therefore not required, although they expect this
function to be convex in practical context. For our numerical analysis, we consider a
Supply chain focus dependent safety stock placement 473
123
simple increasing convex function, although the results would not be different for
any nondecreasing function.
3.2.2 Indirect responsiveness related costs
In addition to the above mentioned direct responsiveness related costs, the stage
will experience an increase in safety stock costs when it operates at cj, for the reasons mentioned in Sect. 3.2.1. As a result, the difference in nominal
cumulative costs of the product at stages j and i will increase by a value, which is a function of (1 - cj). Therefore, indirect responsiveness related cost at stage j is given by:
IRCj ¼ ½f ð1� cjÞ�ðCj � CiÞhjE SSj � �
: ð18Þ
Therefore, the total responsiveness related cost at stage j is given by
TRCj ¼ DRCj þ IRCj: ð19Þ
Hence, total safety stock costs in the presence of increase in costs at stage j that account for increase in the responsiveness per period is given by
CTSCj ¼ CSSCj þ TRCj: ð20Þ
Hence, the total safety stock related cost for the whole supply chain per period is
given by
CTSC ¼ Xn
j¼1 CTSCj : ð21Þ
4 Managerial insights for strategic safety stock placement
In this section, we attempt to study the safety stock placement problem primarily
with respect to the key parameters such as replenishment cycle times, replenishment
cycle time variability, cost of responsiveness etc. as we travel from U/S to D/S and
offer some interesting insights.
4.1 Position of the bottleneck player
We consider a hypothetical serial supply chain with five stages to study the impact
of the position on the bottleneck player on supply chain performance. The different
parameters for this serial supply chain are illustrated in Table 1.
For the purpose of our discussion, we consider the player with no flexibility
whatsoever with respect to its processing time as the bottleneck player. The effect of
changing the position of the bottleneck player on the SC safety inventory costs is
depicted below. We have considered three cases, wherein the processing time
variability progressively increases (IV in Fig. 3), decreases (DV in Fig. 3), and
remains constant (EV in Fig. 3) as we move from the most U/S stage to the most D/
S stage. For the increasing and decreasing cases, we kept the total processing
474 G. Vanteddu et al.
123
variability constant and progressively increased/decreased the process variability as
we move from U/S to D/S in a symmetric fashion. When a particular stage is a
bottleneck, the CIR for that particular stage would be unity and for all other stages
the CIR is considered to be 0.9. Response related costs are not considered in the
analysis as our primary intention is to show the effect of reducing the lead time on
the safety stocks as the bottleneck player moves from U/S to D/S. By considering
the incremental total supply chain safety stock costs with respect to a benchmark
case, wherein all the players are operating at a CIR equivalent to 0.9 and the
processing variability is the same at all the stages (as with the EV case in the chart),
one can clearly see that the incremental total supply chain safety stock costs
progressively increase as the bottleneck player moves from U/S to D/S for all three
cases.
Key managerial insight #1: Safety stock cost depends on the placement of the bottleneck player in a serial supply chain and it is desirable for the bottleneck player to be located towards the U/S rather than the D/S.
4.2 Safety stock costs versus responsiveness costs
We illustrate the impact of CIR on the different cost curves in Fig. 4, using the cost
expressions developed earlier.
We know that, for any stage, safety stock related costs decrease (Eq. 15) and
response related costs increase (Eqs. 17 and 18) with decrease in cycle time, or in
Table 1 Parameters of the five- stage serial SC adopted for
numerical analysis
Stage/player
1 2 3 4 5
Nominal cumulative cost Cj 80 112 175 327 863
Average demand l 100 100 100 100 100
Demand variability r2 400 400 400 400 400
Mean processing time
(periods) Lj
1 1 1 1 1
Processing variability ðl2r2j Þ (in number of units
of product)
50 50 50 50 50
CIR cj 1 1 1 1 1
Safety coefficient kj 1.28 1.28 1.28 1.28 1.28
Average back order coefficient 0.1 0.1 0.1 0.1 0.1
Probability of stockout pj 0.1 0.1 0.1 0.1 0.1
Inventory holding cost hj 0.017 0.017 0.017 0.017 0.017
Service level U(kj) 0.9 0.9 0.9 0.9 0.9
External supplier Customer
Supply
Demand
h i j lk
Fig. 2 Schematic description of a serial supply chain
Supply chain focus dependent safety stock placement 475
123
other words, with decrease in CIR. Hence, without loss of generality, we can say
that the total cost function, which is a combination of safety stock and response
related costs, tends to be convex, the optimum CIR shifting either towards or away
from unity depending on whether responsiveness cost component or safety stock
cost component is dominating. A very interesting result relevant to the nature of the
total costs is due to Bookbinder and Cakanyildirim (1999), who show that the
expected cost per unit time is jointly convex in the decision variables (Q,r,s), s being the expediting factor for a (Q,r) inventory system with expedited orders and random lead times.
4.3 Effect of cycle times and processing time variability on total stage cost
Figure 5 illustrates the effect of increasing processing time variability at a particular
stage on the total cost while keeping the other parameters constant. For the sake of
numerical analysis, we have considered the parameter values for stage 3. PV in the
chart stands for processing time variability and DV stands for demand variability.
Increasing process variability tends to increase both the safety stock related costs
and responsiveness related costs at different rates, primarily depending on the
nominal cumulative cost Cj, the cost of volume flexibility function f(1 - cj), and the cost added at a stage (Cj - Ci). In the presence of increasing processing time variability, therefore, optimum CIR either moves away from or towards unity,
-10
0
10
20
30
40
1 2 3 4 5
Supply Chain Bottleneck StageI nc
re as
e in
T ot
al S
af et
y St
oc k
C os
t ( %
)
IV EV DV
Fig. 3 Incremental SC safety stock costs versus position of the bottleneck player
0
100
200
300
0.55 0.7
CIR
C os
t
SS cost Response Cost Total Cost
10.85
Fig. 4 CIR versus stage costs
476 G. Vanteddu et al.
123
depending on whether safety stock cost component/or the responsiveness cost
component is dominating. With increasing variability, the degree of departure of the
optimum CIR value either way depends on the three factors mentioned above for a
particular stage. To explain, to counter the excessive variability, a typical supply
chain manager tries to reduce the cycle time (by reducing CIR), which would
minimize the SS related costs. However, that action does not necessarily lead to
reduction of the overall costs. For example, if the cost added at a particular stage is
very high then the decrease in safety stock costs by cycle time reduction might not
be able to offset the increase in cycle time reduction (responsiveness) costs. In such
a scenario, moving CIR counterintuitively towards unity (i.e., increasing the cycle
time), which means in the direction that increases safety stock costs, could be a
better measure to reduce overall costs.
Key managerial insight #2: As the processing time variability increases for a stage, the optimum value of CIR moves away from unity if safety stock cost component dominates the responsiveness cost component and towards unity if the responsiveness cost component dominates the safety stock cost component.
In Fig. 5, optimum CIR is progressively moving away from unity as the PV/
DV ratio increases, because we have considered the safety stock costs component
to be larger than the responsiveness cost component for our numerical analysis.
The trend will be reversed if the response related costs dominate the safety stock
related costs. In Fig. 5, for the case of PV/DV = 0.25, the optimum CIR value is
0.919, for which the respective safety stock and responsiveness cost components
are $91.65 and $1.749 per period, respectively. For the case of PV/DV = 2,
wherein the process variability increases eightfold compared to PV/DV = 0.25, the
corresponding safety stock and responsiveness cost components are $138.6 and
$1.75, respectively. In this case, not only is the safety stock component larger but
also the effect of increasing process variability is much greater on safety stock
component compared with responsiveness cost component. Hence, the optimum
CIR value for the PV/DV = 2 case will move in the direction that will mitigate the
effect of increasing safety stock costs and to a point where the cost advantage in
terms of safety stock cost reduction by reducing the CIR is equalized by the
corresponding increase in responsiveness costs. The optimum value for the PV/
DV = 2 case occurs at a CIR value of 0.909 (moving away from unity), with
50
150
250
350
0.55 0.7 0.85
CIR
T ot
al C
os t
PV/DV:0.25 PV/DV:0.5 PV/DV:0.75 PV/DV:1 PV/DV:1.5 PV/DV:2
1
Fig. 5 CIR versus total stage costs
Supply chain focus dependent safety stock placement 477
123
corresponding safety stock and responsiveness cost components of $137.86 and
$2.48, respectively.
We extend the above analysis by performing a simple sensitivity analysis by
considering the changes in mean processing time and nominal cost added at stage 3,
while keeping other parameters constant. Table 2 presents the case with the mean
processing time and nominal cost added both being halved. Table 3 presents the
case with mean processing time and nominal cost added both being doubled.
For the sake of simplicity, we have just considered the cases PV/DV = 0.25 and
PV/DV = 2. For both of these cases, the optimum CIR for PV/DV = 2 occurs at a
slightly lower value than that for PV/DV = 0.25 for the reasons mentioned in the
preceding paragraph. The changes made in the parameter values are not able to
make the responsiveness related costs increase at a faster rate than the decrease in
safety stock related costs (with decreasing CIR), hence, the optimum CIR is still
moving away from unity, primarily due to the parameter values we have assumed
for our numerical analysis. We show in Sect. 4.4 that changes in the cost of
flexibility function (COF), that is f(1 - cj), in our model cause the responsiveness related costs to increase at a faster rate than the decrease in safety stock related costs
(with decreasing CIR), making the optimum CIR move towards unity. In a practical
context, it all depends on the actual values of the parameters, which make either of
the cost components dominating.
The optimum value of the CIR for a stage will primarily depend upon the
cumulative cost of the product, which in turn will depend upon the position of the
stage in the supply chain, the cost added, and the nature of cost of volume flexibility
function. Using the cycle time reduction as a lever may or may not be cost effective
depending on, for example, whether a windscreen wiper is being assembled or an
engine is being assembled at a stage. For the same cost of volume flexibility function,
it might be a good idea to reduce the cycle time if a windscreen wiper is being
assembled as opposed to an engine. Irrespective of the component that is being
assembled, this effect will be more pronounced D/S when compared to U/S because
the cumulative cost of the product will progressively increase as we move D/S.
Key managerial insight #3: To reduce the safety stock costs, reducing the cycle time is a better lever at downstream stages when compared to upstream stages for a given responsiveness cost, all other parameters being held constant.
Key managerial insight #4: All other parameters being constant, for a given cycle time reduction, the cost of flexibility function has to be milder for a stage with high cost addition when compared to a stage with low cost addition, to justify savings in safety stock costs.
Table 2 Sensitivity analysis 1 CIR PV/DV = 0.25 PV/DV = 2
1 69.869 103.747
0.9 68.432 100.405
0.8995 68.441 100.404
0.899 68.450 100.403
0.895 68.533 100.407
478 G. Vanteddu et al.
123
The insight from Ryu and Lee (2003) ‘‘that in order to attain greater savings from
the symmetric cost scheme for the two suppliers, the investment cost for the supplier
with the more unreliable lead time should be smaller’’ looks similar in essence to
our key managerial insight 2, albeit in a different context. One of the key insights
offered, that downstream lead times have a greater impact on system performance
than upstream ones (Gallego and Zipkin 1999), is also similar in spirit to our
research.
4.4 Effect of cost of volume flexibility on total stage cost
Figure 6 illustrates the effect of cost of volume flexibility at a particular stage on the
total cost while keeping the other parameters constant. For the sake of numerical
analysis, we have once again considered the parameter values for stage 3. COF in
the chart stands for cost of volume flexibility function mildness/steepness, when
compared to a randomly chosen increasing convex function (COF: 1).
In Fig. 6, as expected, optimum CIR is progressively moving towards unity as the
COF increases. As opposed to processing time variability, which affects both the
safety stock cost component and the responsiveness cost components, cost of
flexibility affects only the responsiveness cost component. Intuitively speaking,
given that the stage is not operating at optimal CIR, increasing the cost of flexibility
makes a typical supply chain manager operate close to nominal cycle times (CIR
close to unity), but going back to the example given earlier, if a windscreen wiper is
being assembled, particularly at a D/S stage, it is quite likely that there will be
significant savings in safety stock costs by reducing the cycle time (moving the CIR
away from unity), overtaking the extra cost of responsiveness because of a steeper
flexibility function. The opposite will be true, for example, if an engine is being
assembled at a stage.
Table 3 Sensitivity analysis 2 CIR PV/DV = 0.25 PV/DV = 2
1 132.232 202.513
0.95 129.834 198.290
0.93 129.952 197.664
0.92 129.952 197.664
0
500
1000
1500
2000
2500
0.55 0.7 0.85
CIR
T ot
al C
os t
COF:0.01 COF:0.1 COF:0.33 COF:1 COF:2 COF:5 COF:10
1
Fig. 6 CIR versus total stage costs
Supply chain focus dependent safety stock placement 479
123
Key managerial insight #5: Given that a stage is not operating at optimal CIR, as cost of volume flexibility function becomes steeper, the optimum value of CIR moves towards unity if the responsiveness costs segment dominates the safety stock cost segment, and vice versa.
Key managerial insight #6: All other parameters being constant, for the same cost addition at a stage, cost of flexibility function has to be milder at U/S than D/S for a given amount of savings in safety stock costs.
While our model assumes information symmetry, it is still applicable, including
the managerial insights, in supply chains with information asymmetry. For
example, in the presence of bullwhip effect attributable to information asymmetry
or other related issues, demand variability will progressively increase as we move
towards the upstream stages. It is still advisable that mitigating measures are put
in place to reduce the causative factors of the bullwhip effect. In the absence of
any mitigating measures, one could also consider the actual variability at different
stages and still use the model. The effect will be to accentuate both the safety
stock component and the responsiveness cost component as we proceed upstream.
If the increase in the cost of responsiveness at a stage is significantly larger
compared to the reduction in safety stock costs for unit processing time reduction,
the optimum CIR will move towards unity. The opposite trend will be witnessed
in the opposite case. The change in the optimum CIR value at downstream stages
may also be significant because of larger cumulative costs and typically large
amounts of cost addition, in spite of the effect of bullwhip effect being smaller
compared to upstream stages.
5 Model usability for achieving strategic fit
The model can be used primarily as a building block in any kind of supply chain
network both to evaluate the performance of individual stages with respect to the
key order winners, cost, and responsiveness, and to optimize the supply chain
depending upon the focus within the cost-responsiveness spectrum. The results can
be used to evaluate the gap between the individual business strategies of different
stages and the supply chain strategy, so that appropriate actions can be taken to
achieve the strategic fit. Once the supply chain design is completed and the network
is in place, the model will be particularly useful for making strategic decisions with
regard to the safety stock placement while considering a changeover or introducing
a new product.
5.1 Performance evaluation
Total safety stock related cost (safety stock cost and responsiveness cost)
expression for all the stages (using Eq. 20) can be easily evaluated given the
different parameter values and one can obtain the costs separately for safety stock
holding and cycle time reduction (if so desired by a stage) and the expected cycle
times assuming that all the stages operate without any coordination with respect to
the overall supply chain strategy (that is, there is no central decision maker). This
480 G. Vanteddu et al.
123
will allow stages to evaluate their performance with regard to the key order
winners of cost and responsiveness and facilitates their comparison to the internal
performance benchmarks. For example, a particular stage may realize that better
operations management practices that involve the reduction of waste (lean
practices) that had been planned for are ineffectual. Hence, they may want to
know what went wrong and implement appropriate corrective and preventive
actions such that cost and cycle time reductions can be achieved without any
major investments.
5.2 Optimization
Now, assuming that there is a central decision making mechanism, which acts to
coordinate the whole supply chain, the overall safety stock related cost expression
for the supply chain (Eq. 21) can be optimized, say for the optimal CIR values at all
the stages given the constraints on target supply chain cycle time, individual stages’
rates of production, service levels, inventories, cost of inventory holding, etc. The
optimal costs (safety stock inventory and responsiveness) can be compared with the
costs obtained assuming the absence of the central decision maker (as for
performance evaluation explained in Sect. 5.1) to initiate necessary actions.
We also offer a simple optimization example based on the parameter values
presented in Table 1 that lend support to the managerial insights developed in Sects.
4.3 and 4.4.
Figure 7 depicts the optimal CIR values under different scenarios considered in
Sects. 4.3 and 4.4. The only constraint considered was 0 B cj B 1. The total cost function was optimized under different scenarios.
SC: Standard cost of flexibility function for all stages and other parameter values
as per Table 1.
DC: Decreasing cost of flexibility function (i.e., the function becomes milder
compared to the SC case as we move from U/S to D/S); stage 3’s cost of flexibility
function remaining the same as in the SC case. Other parameters for all the other
stages remain as in the SC case.
IV: Progressively increasing process variability as we move from U/S to D/S. For
stage 3, process variability remains the same as in the SC case. Other parameters for
all the other stages remain as in the SC case.
0.86
0.88
0.9
0.92
0.94
0.96
0.98
1
1 2 3 4 5
Player
C IR
SC
DC
IV
DV
Fig. 7 Player versus optimal CIR
Supply chain focus dependent safety stock placement 481
123
DV: Progressively decreasing process variability as we move from U/S to D/S.
For stage 3, process variability remains the same as in the SC case. Other parameters
for all the other stages remain as in the SC case.
The results, as can be seen from Fig. 7, clearly reinforce the insights developed in
the earlier sections. The shift in the optimum CIR value at stage 5 shows strong
variability owing to the fact that cost added constitutes a significant portion of the
cumulative cost at that stage, thereby increasing the cost of responsiveness
significantly for the same cost of flexibility function when compared to other stages.
The same is the case with stage 4, although on a reduced scale. Since stage 3 is the
transition stage under different scenarios retaining the same parameter values as
compared to the SC case, there is no perceptible change in the optimum CIR value.
5.3 Achieving strategic fit
If the overall costs at a stage are increasing as a result of optimization to achieve the
strategic supply chain objectives, when compared to the costs in the absence of a
central decision maker, i.e., by following its independent business strategy, then, by
devising a scheme for the sharing of the additional profits for the whole supply chain
in an equitable fashion, say, through changing the contract structure, discounts or
other incentives, efforts could be made to coordinate the individual business
strategies with the supply chain strategy to achieve the strategic fit.
One way of doing this is by considering the supply chain objectives at different
levels, say, strategic, tactical, and operational levels, and performing a gap analysis
Strategic Objective:Customer Satisfaction Tactical Objective:Total customer Cycle time Performance evaluation for a hypothetical supply chain:
Cost Estimate(Cip) $25,000 $100,000 $50,000 $0 $25,000 $0 Sum(Cip) $200,000 Time Required in months (Tip) 2 12 3 0 3 0 Max (Tip) 12
Tier-3 Supplier
Tier-2 Supplier
Tier-1 Supplier Mfg Unit D.C
Retail Unit
5
4
3
2
1
Cost Estimate(Cjp) $5,000 $15,000 $0 $0 $6,000 $0 Sum(Cjp) $26,000 Time Required in months (Tjp) 1 4 0 0 1 0 Max (Tjp) 4
5
4
3
2
1
Cost Estimate(Ckp) $5,000 $15,000 $2,000 $10,000 $6,000 $0 Sum(Ckp) $38,000 Time Required in months (Tkp) 2 2 1 1 1 0 Max (Tkp) 2
5
4
3
2 Overall cost= 1 Sum(Sum(Cip)+
…+Sum(Ckp)) $264,000
Max(T) : Max(max(Tip),max(Tjp),max(Tkp)) 12
NC product level
Throughput rate
Information symmetry
level
P E
R F
O R
M A
N C
E M
E T
R IC
S
Fig. 8 Performance comparison for different players in a supply chain (adopted from Vanteddu et al. 2006)
482 G. Vanteddu et al.
123
between the individual business strategies and the supply chain strategy in terms of
costs and responsiveness. Vanteddu et al. (2006) offers a simple Excel based model
to achieve strategic fit assuming that quantitative data is available to make use of the
tool, as illustrated in Fig. 8.
By simply modifying the performance metrics by placing emphasis on cost
efficiency and responsiveness, one can use the above model to achieve the strategic
fit. Actual costs related to cost and responsiveness can be obtained by using the
model proposed in this paper.
6 Conclusions
In this paper, in addition to offering several managerial insights with regard to
strategic safety stock placement in a supply chain, an attempt has been made to
address the problem of achieving compatibility between the supply chain strategy
and the individual stage’s business strategy by primarily considering safety stocks
and responsiveness related costs. We introduce a new parameter called the
coefficient of inverse responsiveness (CIR) to model response related costs at a
stage, which also enhances the scalability of the model. The developed cost function
for the building block could be easily extended for any type of supply chain
network. By knowing the values of the parameters of the model, one can know the
safety stock costs and responsiveness related costs at each stage and compare them
to an ideal supply chain strategy in terms of cost and responsiveness to make
informed decisions. The key managerial insights developed are generic in nature
and applicable to any supply chain irrespective of its placement on the cost-
responsiveness spectrum and topology.
To make the model more tractable we had to make certain simplifying
assumptions and following are some of the limitations related to those assumptions.
For example, we did not factor the bullwhip effect into our model. It would be an
interesting extension to our research if the bullwhip effect and other information
asymmetry related issues were factored into the model. We have not incorporated
order sizes into our model because the model is supposed to be largely a strategic
model. Research could be extended by incorporating this aspect into the model to
see how it affects the managerial insights that we offered. Relaxing the assumptions
on the stationary nature of the demand and stage base stock policy with periodic
review will make the model more realistic and robust to real-world situations.
Introducing contracts that affect the flexibility at a stage with financial ramifications
will also be a very fertile area to pursue that will make our model mimic reality
more closely. Another such area is the consideration of other types of network
topologies, particularly assembly and distribution; we are planning to consider
extension of the framework in this direction. It would also make more sense to
consider capacity constraints at certain stages. Product mix related flexibility is also
a crucial factor which is not addressed in our model. Addition of this feature would
truly make the research more in tune with reality, especially in mass customization
settings. Finally, we really would like to see this model used in some real-world
application so that insights presented in our model could be validated.
Supply chain focus dependent safety stock placement 483
123
References
Axsäter S (1993) Continuous review policies for multi-level inventory systems with stochastic demand.
In: Graves S, Rinnooy Kan A, Zipkin P (eds) Logistics of production and inventory. Elsevier
Science, North Holland
Axsäter S, Rosling K (1993) Notes: installation vs. Echelon stock policies for multilevel inventory
control. Manage Sci 39(10):1274–1280
Ben-Daya M, Raouf A (1994) Inventory models involving lead time as decision variables. J Oper Res Soc
45:579–582
Bookbinder JH, Cakanyildirim M (1999) Random lead times and expedited orders in (Q, r) inventory
systems. Eur J Oper Res 115:300–313
Cherukuri SS, Nieman RG, Sirianni NC (1995) Cycle time and the bottom line. Indust Eng 27(3):20–23
Choi JW (1994) Investment in the reduction of uncertainties in just in time purchasing systems. Naval Res
Logistics 41:257–272
Chopra S, Meindl P (2004) Supply chain management: strategy, planning and operation, 2nd edn. Pearson
Education Inc., Upper Saddle River
Chopra S, Reinhardt G, Dada M (2004) The effect of lead time uncertainty on safety stocks. Decis Sci
35(1):1–24
Clark A, Scarf H (1960) Optimal policies for a multi echelon inventory problem. Manage Sci 6:474–490
Davis D, Buckler J, Mussomeli A, Kinzler D (2005) Inventory transformation: Revlon style. Supply
Chain Manage Rev 9(5):53–59
Eppen GD, Martin RK (1988) Determining safety stock in the presence of stochastic lead time and
demand. Manage Sci 34(11):1380–1390
Ettl M, Feigin GE, Lin GY, Yao DD (2000) A supply network model with base—stock control and
service requirements. Oper Res 48:216–232
Felgate R, Bott S, Harris C (2007) Get your timing right. Supply Manage 12(1):17
Feller W (1960) An introduction to probability theory and its applications, vol I. Wiley, New York
Fisher ML (1997) What is the right supply chain for your product? Harv Bus Rev 75(2):105–116
Gallego G, Zipkin P (1999) Stock positioning and performance estimation in serial production-
transportation systems. Manuf Serv Oper Manage 1(1):77–88
Gaur V, Giloni A, Seshadri S (2005) Information sharing in a supply chain Under ARMA demand.
Manage Sci 51(6):961–969
Glasserman P, Tayur S (1995) Sensitivity analysis for base stock levels in multi echelon production-
inventory system. Manage Sci 41:216–232
Glasserman P, Tayur S (1996) A simple approximation for a multi stage capacitated production inventory
systems. Naval Res Logistics 43:41–58
Graves S (1985) Multi echelon inventory model for a repairable item with one for one replenishment.
Manage Sci 31:1247–1256
Graves SC (1988) Safety stocks in manufacturing systems. J Manuf Oper Manage 1:67–101
Graves SC, Willems SP (2003) Supply chain design: safety stock placement and supply chain
configuration. In: de Kok AG, Graves SC (eds) Handbooks in operations research and management
science, supply chain management: design, coordination and operation, Chap 3, vol 11. Elsevier BV,
Amsterdam, The Netherlands
Hanssmann F (1959) Optimal inventory location and control in production and distribution networks.
Oper Res 7:483–498
Hill T (1993) Manufacturing strategy: text and cases, 2nd edn. IRWIN, Illinois
Kapuscinski R, Tayur S (1999) Optimal policies and simulation based optimization for capacitated
production inventory systems. In: Tayur S, Ganeshan R, Magazine MJ (eds) Quantitative models for
supply chain management. Kluwer Academic Publishers, Boston
Lee HL, Billington C (1993) Material management in decentralized supply chains. Oper Res 41(5):835–
847
Lee HL, Moinzadeh K (1987a) Two parameter approximations for multi echelon repairable inventory
models with batch ordering policy. IIE Trans 19:140–149
Lee HL, Moinzadeh K (1987b) Operating characteristics of a two echelon inventory system for repairable
and consumable items under batch ordering and shipment policy. Naval Res Logistics Quart
34:365–380
Lee Y, Zipkin P (1992) Tandem queues with planned inventories. Oper Res 40:936–947
484 G. Vanteddu et al.
123
Moon I, Choi S (1998) Technical note: a note on lead time and distributional assumptions in continuous
review inventory models. Comput Oper Res 25(11):1007–1012
Nazzal D, Mollaghasemi M, Anderson D (2006) A simulation-based evaluation of the cost of cycle time
reduction in Agere systems wafer fabrication facility—a case study. Int J Prod Econ 100:300–313
Rosling K (1989) Optimal inventory policies for assembly systems under random demands. Oper Res
37:565–579
Ryu SW, Lee KK (2003) A stochastic inventory model of dual sourced supply chain with lead-time
reduction. Int J Prod Econ 81–82:513–524
Simchi-Levi D, Zhao Y (2005) Safety stock positioning in supply chain with stochastic lead times. Manuf
Serv Oper Manage 7(4):295–318
Simpson KF (1958) In process inventories. Oper Res 6:863–873
Sourirajan K, Ozsen L, Uzsoy R (2007) A single-product network design model with lead time and safety
stock considerations. IIE Trans 39:411–424
Speck C, vander Wal J (1991) The capacitated multi echelon inventory system with serial structure: 1.
The ‘‘push-ahead’’ effect. Memorandum COSOR 91-39, Eindhoven University of Technology,
Eindhoven, The Netherlands
Upton DM (1997) Process range in manufacturing: an empirical study of flexibility. Manage Sci
43(8):1079–1092
Van Houtum GJ, Inderfurth K, Zijm WHM (1996) Materials coordination in stochastic multi echelon
systems. Eur J Oper Res 95:1–23
Vanteddu G, Chinnam RB, Yang, K (2006) A performance Comparison tool for Supply Chain
management. Int J Logistics Syst Manage 2(4):342–356
Yang B, Geunes J (2007) Inventory lead time planning with lead-time sensitive demand. IIE Trans
39(5):439
Supply chain focus dependent safety stock placement 485
123
- Supply chain focus dependent safety stock placement
- Abstract
- Introduction
- Literature review
- Model development
- Expression for safety stock costs
- Expression for responsiveness related costs
- Direct responsiveness related costs
- Indirect responsiveness related costs
- Managerial insights for strategic safety stock placement
- Position of the bottleneck player
- Safety stock costs versus responsiveness costs
- Effect of cycle times and processing time variability on total stage cost
- Effect of cost of volume flexibility on total stage cost
- Model usability for achieving strategic fit
- Performance evaluation
- Optimization
- Achieving strategic fit
- Conclusions
- References
<< /ASCII85EncodePages false /AllowTransparency false /AutoPositionEPSFiles true /AutoRotatePages /None /Binding /Left /CalGrayProfile (None) /CalRGBProfile (sRGB IEC61966-2.1) /CalCMYKProfile (ISO Coated v2 300% \050ECI\051) /sRGBProfile (sRGB IEC61966-2.1) /CannotEmbedFontPolicy /Error /CompatibilityLevel 1.3 /CompressObjects /Off /CompressPages true /ConvertImagesToIndexed true /PassThroughJPEGImages true /CreateJDFFile false /CreateJobTicket false /DefaultRenderingIntent /Perceptual /DetectBlends true /ColorConversionStrategy /sRGB /DoThumbnails true /EmbedAllFonts true /EmbedJobOptions true /DSCReportingLevel 0 /SyntheticBoldness 1.00 /EmitDSCWarnings false /EndPage -1 /ImageMemory 524288 /LockDistillerParams true /MaxSubsetPct 100 /Optimize true /OPM 1 /ParseDSCComments true /ParseDSCCommentsForDocInfo true /PreserveCopyPage true /PreserveEPSInfo true /PreserveHalftoneInfo false /PreserveOPIComments false /PreserveOverprintSettings true /StartPage 1 /SubsetFonts false /TransferFunctionInfo /Apply /UCRandBGInfo /Preserve /UsePrologue false /ColorSettingsFile () /AlwaysEmbed [ true ] /NeverEmbed [ true ] /AntiAliasColorImages false /DownsampleColorImages true /ColorImageDownsampleType /Bicubic /ColorImageResolution 150 /ColorImageDepth -1 /ColorImageDownsampleThreshold 1.50000 /EncodeColorImages true /ColorImageFilter /DCTEncode /AutoFilterColorImages false /ColorImageAutoFilterStrategy /JPEG /ColorACSImageDict << /QFactor 0.76 /HSamples [2 1 1 2] /VSamples [2 1 1 2] >> /ColorImageDict << /QFactor 0.76 /HSamples [2 1 1 2] /VSamples [2 1 1 2] >> /JPEG2000ColorACSImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 >> /JPEG2000ColorImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 >> /AntiAliasGrayImages false /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 150 /GrayImageDepth -1 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict << /QFactor 0.76 /HSamples [2 1 1 2] /VSamples [2 1 1 2] >> /GrayImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] >> /JPEG2000GrayACSImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 >> /JPEG2000GrayImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 >> /AntiAliasMonoImages false /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 600 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict << /K -1 >> /AllowPSXObjects false /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile (None) /PDFXOutputCondition () /PDFXRegistryName (http://www.color.org?) /PDFXTrapped /False /Description << /ENU <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> /DEU <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> >> >> setdistillerparams << /HWResolution [2400 2400] /PageSize [5952.756 8418.897] >> setpagedevice