excel assignment
Excel Assignment: Truck Scheduling
Mal-Wart truck fleet hires temporary drivers for four- and eight-hour shift during holiday sales season. Four-hour shifts start at 6am, noon, and 2pm; eight-hour shifts start at 6am, 8am, noon, and 2pm.
The number of drivers needed varies during the day. The table below shows the minimum number of drivers that are needed each two-hour time block throughout the day. (For example, Mal-Wart needs 37 drivers from 8am to 10am.)
|
Time |
6am |
8am |
10am |
Noon |
2pm |
4pm |
6pm |
8pm |
|
Drivers needed |
63 |
37 |
21 |
33 |
48 |
55 |
27 |
17 |
1. Formulate a linear programming model for this problem and type it in worksheet 1 of your Excel file.
2. In worksheet 2 of your Excel file, formulate an Excel model that corresponds to your mathematical model; and use Solver to find the optimal solution to the problem.