Sir Ex
Why is it important for project managers to resist changes to the project baseline?
Under what conditions would a project manager make changes to a baseline?
When would a project manager not allow changes to a baseline?
This original post must contain a minimum of 300 words. Students must demonstrate critical thinking by paraphrasing the material into their own words (direct quotes should be used in a limited manner as this does not display critical thinking). All statements in the post that are not general knowledge should be cited to their source. Be sure to clearly relate the readings to the lesson concepts. Students may further synthesize this research relating to personal experiences. All citations should be in APA format with a reference listing at the bottom of the post in APA format (be sure to include a link to the website of your current event in the reference listing).