IT 697 phase 4 IP clarified instructions

Note: Also check the example project reports that we have discussed in the classroom. 

The clarified and updated project deliverables are the following:

Proposed Solution – this has already been mostly completed through Phase 3 in terms of the background, problem discussion, research, scope and MOVs.

Prepare a project plan report for the proposed solution (this requires changes as needed to prior work and adding on to the current report from Phase 3).Include a WBS (tasks and their subtasks and their sub-subtasks) with a time line - using MS Project is a good idea and include screenshots from whatever software you use. Discuss how you determined task times and/or how they would be determined in real life.List required resources – people, equipment, space, software, hardware, etc.List detailed costs for all activities, services, hardware, material, etc. and present source cites for where the costs were obtained

Provide a cost-benefit analysis in an Excel spreadsheet as per the example discussed in class (submit the Excel file along with the Word file).

Be sure to update your Table of Contents before submission.

Name the document "yourname_IT697_IP4.doc."