Supporting Plans PMG
6.1. Risk Management
6.1.1 Identifying subcontractors under financial stress 6.1.2 Planning risk events 6.1.3 Planning availability of resources during potential risk events 6.1.4 Projecting possible cost scenarios for different risk events. 6.15 Errors and omissions in Scope of Work packages 6.1.6 Errors and omissions in Estimate and Schedule data entry
6.2. Cost Management Plan
6.2.1. At the conclusion of buyout meetings, project management team will determine subcontractors/vendors to contract with using AIA standard documents. 6.2.2. All scope of work items will be issues a Modern Build accounting code once subcontracts are executed. 6.2.3. Subcontractors shall submit project payments to the corresponding accounting codes every before the 15th of every month. Applications for payment must be notarized originals. 6.2.4. Project manager to verify billing amounts for the aggregate subcontractor invoices and apply for a general contractor application for payment to the ownership team. 6.2.5. General contractor application for payment shall be submitted before the 21st of every month. 6.2.6. Ownership teams shall approve or decline applications for payment before the end of month and release funds within 15 days of approval.
6.3. Test Plan
6.3.1. Project testing shall be conducted per plans and specifications by the specified third-‐ party testing agencies. 6.3.2. Testing includes the following: 6.3.2.1. Soil sample testing 6.3.2.2. Percolation testing 6.3.2.3. Slump testing for Concrete 6.3.2.4. pH testing for Concrete 6.3.2.5. Moisture testing for Concrete slabs 6.3.2.6. Pull-‐Tests for all major caulking joints 6.3.2.7. Roof flood test for leaks
6.4. Vendor Management Plan
6.4.1. All subcontractors/vendors shall participate in Modern Build’s Subcontractor Management System. 6.4.2. Subcontractors shall fully complete registration in SMS program. 6.4.3. Subcontractor/vendor proposals will not be accepted until SMS is complete.
6.5. Quality Plan
6.5.1. Project management team to determine quality standards for each scope of work 6.5.2. Standards shall reflect industry standards for workmanship and warranties. 6.5.3. All installed material shall bear the specified warranties as set forth in the project plans and specifications 6.5.4. Project superintendent shall act as on-‐site quality manager and reserves the right to accept or reject work as a part of Modern Build’s Quality Plan. 6.5.5. It is the responsibility of the subcontractor to replace inadequate material if it is deemed unacceptable by quality manager