Hazard Analysis and Risk Assessment Project
Be sure to read all of the instructions. There are two documents to be prepared and submitted.
SEVERITY:
1 – Catastrophic
2 – Critical
3 – Marginal
4 – Negligible
PROBABILITY (Likelihood of Occurrence):
A – Frequent
B – Probable
C – Occasional
D – Remote
E – Improbable
RISK CODE:
H – High
S – Serious
M – Medium
L – Low
All sections of the form must be completed. Note that the “Post Control Risk Assessment Measures” section reflects the risk assessment AFTER applying the additional control measures.
2. In a separate document of at least 500 words, explain the reasoning behind how you filled out each section of the form. Use references as needed to support the discussion.
Upload both the completed form and the discussion document. Be sure that the discussion document is in APA format with a title page and a reference page.