Construction Engineering Management Project Costing

Bid Package/Documents

Notice to Bidders/Invitation to Bidders

Type of project

Size of project

Location of project

Bid due date

Start and completion date

Bonds

Document location

Legal requirements

Bid Form

Alternates

Contract Agreement

General Conditions

Supplementary General Conditions

Drawings and Technical Specifications

Performance

Prescription

Addenda (Q & A)

Estimating Process

Estimate construction costs

Types of estimates

Lump sum

Unit price

Time and Material (T&M)

Cost price – Guaranteed Maximum price

Quantity takeoff

3

Process of Estimating

Break the project into cost centers

Estimate the quantities required for the cost centers (e.g., cubic yards of earth, lineal feet of pipe, etc.)

Price cost the quantities (most take into consideration analysis of production rates based on resources available)

Calculate the total price of each cost center by multiplying the quantities by the unit price.

Break work into individual work packages

Calculate quantities for each work item (adjust for waste)

Select construct methods to be used

Assign resource group to be used (crew composition, equipment, subcontractors)

Estimate production rate

Calculate crew cost

Calculate total work item cost

Method of Estimating

Learning Curve

Number of Units

Average time per unit

Estimating References

R. S. Means Company, Building Construction Cost Data

MeansCostWorks.com

F. R. Walker’s, The Builders Estimator’s Reference Manual

The Richardson General Construction Estimating Standards

Company Historical records!!!

General Conditions

Overhead & Profit

Cost Adjustment for Locale

San Antonio building cost = Canton building cost

San Antonio index Canton building index

$1,500,000 = Canton building cost

55.0 154.1

Canton building cost = 154.1 x $1,500,000

55.0

Canton building cost = $4,202,277

Using published cost data, compute the cost to construct a 6 story dormitory consisting of 90,000 SF.

Using rough order of magnitude (cost per SF) data:

(a) What is the cost of this dormitory in Philadelphia, San

Francisco, and Miami?

(b) What would the same project cost in 2000, 2010

and today?

(c) Write a brief narrative discussing your methodology used to compute the costs.

(d) Cite your sources

(e) All reports shall be typed.