bus 430 w5

profilematva3
om_chapter_8_1.pptx

FACILITY AND WORK DESIGN

CHAPTER 8

DAVID A. COLLIER AND JAMES R. EVANS

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

1

8-1 Describe four layout patterns and when they should be used.

8-2 Explain how to design product layouts using assembly line balancing.

8-3 Explain the concepts of process layout.

8-4 Describe issues related to workplace design.

8-5 Describe the human issues related to workplace design.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

2

Facility Layout

Facility layout refers to the specific arrangement of physical facilities. Facility-layout studies are necessary whenever:

a new facility is constructed,

there is a significant change in demand or throughput volume,

a new good or service is introduced to the customer benefit package, or

different processes, equipment, and/or technology are installed.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

3

Facility Layout

Purposes of layout studies are to:

minimize delays in materials handling and customer movement.

maintain flexibility.

use labor and space effectively.

promote high employee morale and customer satisfaction.

provide for good housekeeping and maintenance.

enhance sales as appropriate in manufacturing and service facilities.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

4

Facility Layout

A product layout is an arrangement based on the sequence of operations that are performed during the manufacturing of a good or delivery of a service.

Examples: Winemaking industry, credit card processing, Subway sandwich shops, paper manufacturers, insurance policy processing, and automobile assembly lines.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

5

Exhibit 8.1 Product Layout for Wine Manufacturer

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

6

Facility Layout

Product Layout

Advantages: Lower work-in-process inventories, shorter processing times, less material handling, lower labor skills, and simple planning and control systems.

Disadvantages: A breakdown at one workstation can cause the entire process to shut down; a change in product design or the introduction of new products may require major changes in the layout, limiting flexibility.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

7

Facility Layout

A process layout consists of a functional grouping of equipment or activities that do similar work.

Examples: Legal offices, shoe manufacturing, jet engine turbine blades, and hospitals use a process layout.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

8

Exhibit 8.2 Process Layout for a Machine Shop

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

9

Facility Layout

Process Layout

Advantages: A lower investment in equipment, the diversity of jobs inherent in a process layout can lead to increased worker satisfaction.

Disadvantages: High movement and transportation costs, more complicated planning and control systems, longer total processing time, higher in-process inventory or waiting time, and higher worker-skill requirements.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

10

Facility Layout

In a cellular layout, the design is not according to the functional characteristics of equipment, but rather by self-contained groups of equipment (called cells), needed for producing a particular set of goods or services.

Examples: Legal services, such as labor law, bankruptcy, divorce; medical specialties such as maternity, oncology, surgery.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

11

Exhibit 8.3 Cellular Manufacturing Layout

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

12

Facility Layout

Cellular Layout

Advantages: Reduced materials-handling requirements, quicker response to quality problems, more efficient use of floor space, more worker responsibility increasing morale.

Disadvantages: Duplication of equipment among cells, greater worker skills requirements.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

13

Facility Layout

A fixed-position layout consolidates the resources necessary to manufacture a good or deliver a service, such as people, materials, and equipment, in one physical location.

Examples: The production of large items such as heavy machine tools, airplanes, buildings, locomotives, and ships. Service-providing examples include major hardware and software installations, sporting events, and concerts.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

14

Fixed-Position Layout

Advantages: Work remains stationary, reducing movement.

Disadvantages: High level of planning and control required.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

15

Exhibit 8.4 Comparison of Basic Layout Patterns

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

16

Facility Layout in Service Organizations

Service organizations use product, process, cellular, and fixed-position layouts to organize different types of work.

Examples: Libraries, hospitals, insurance companies

Product Layout—Service organizations that provide highly standardized services tend to use product layouts.

Examples: Restaurant kitchens

Process Layout—Services that need the ability to provide a wide variety of services to customers with differing requirements usually use a process layout.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

17

Designing Product Layouts

Product layouts in flow shops generally consist of a fixed sequence of workstations separated by buffers (queues of work-in-process).

Flow-blocking delay occurs when a work center completes a unit but cannot release it because the in-process storage at the next stage is full. The worker must remain idle until storage space becomes available.

Lack-of-work delay occurs whenever one stage completes work and no units from the previous stage are awaiting processing.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

18

Designing Product Layouts

An assembly line is a product layout dedicated to combining the components of a good or service that has been created previously.

Examples: Automobile assembly, Subway sandwich shops, insurance policy processing

Assembly line balancing is a technique to group tasks among workstations so that each workstation has—in the ideal case—the same amount of work.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

19

Assembly-Line Balancing

Required information:

The set of tasks to be performed and the time required to perform each task.

2. The precedence relations among the tasks—that is, the sequence in which tasks must be performed.

3. The desired output rate or forecast of demand for the assembly line.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

20

One workstation: In an eight-hour day, could produce (1 part/1.0 min)(60 minutes per hour)(8 hours per day) = 480 parts/day

Three workstation s (one for each task): The first operator can produce 120 parts per hour, or 960 parts/day. The second could produce 1,600 parts/day. The third operator can produce 2,400 parts/day. Maximum output is 960 parts/day.

Two workstations (A/BC): Since each operator needs 0.5 minute to perform the assigned duties, the line is in perfect balance, and 960 parts per day can be produced.

Exhibit 8.7 A Three-Task Assembly Line

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

21

Assembly-Line Balancing

Cycle time is the interval between successive outputs coming off the assembly line.

In the previous example, with one workstation, the cycle time is 1 minute; that is, one completed assembly is produced every minute.

If two workstations are used, the cycle time is 0.5 minute/unit.

If three workstations are used, the cycle time is still 0.5 minute/unit, because task A is the bottleneck, or slowest operation. The line can produce only one assembly every 0.5 minute.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

22

Assembly-Line Balancing

Cycle time (CT) is related to the output (R) by the following equation:

CT = A/R [8.2]

A = available time to produce the output.

The output (R) is normally the demand forecast in units, adjusted for on-hand inventory if appropriate, or orders released to the factory.

Both A and R must have the same time units of measure (hour, day, week, month, and so on).

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

23

Assembly-Line Balancing

Minimum number of workstations required = Sum of task times/Cycle time = t/CT [8.3]

Total Time Available = (Number of work stations)×(Cycle Time) = (N )(CT ) [8.4]

Total Idle Time = (N )(CT ) − t [8.5]

Assembly-line Efficiency = t/(N ×CT ) [8.6]

Balance Delay = 1 − Assembly-line Efficiency [8.7]

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

24

Assembly-Line Balancing

Line balancing approaches use decision rules, or heuristics, to assign tasks to workstations to attempt to minimize the amount of idle time at workstations, but do not guarantee optimal solutions.

Examples:

Assign the task with the longest task time first to a workstation if the cycle time would not be exceeded.

Assign the shortest task first.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

25

Exhibit 8.9 Precedence Network and Workstation Assignment

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

26

Assembly Line Balance for In-Line Skate

Workstation Tasks Total Time Idle Time

A 1, 2, 5 5.7 0.3

B 3, 4, 6, 7, 8 3.7 2.3

Total 9.4 2.6

Using equations [8.4] to [8.6] we may compute the following:

Total Time Available = (Number workstations)(Cycle Time) = (N )(CT ) = (2)(6) = 12 minutes

Total Idle Time = (N )(CT ) − t = (2)(6) - 9.4 = 2.6 minutes

Assembly-line Efficiency =  t/(N ×CT ) = 9.4/(2 × 6) = 78.3%

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

27

Designing Process Layouts

Arrangement of departments or work centers to minimize costs associated with material movement or maximizing “closeness ratings” between departments.

Software packages:

CRAFT

ALDEP

CORELAP

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

28

Workplace Design

Key Questions:

Who will use the workplace? Will the workstation be shared? How much space is required?

How will the work be performed? What tasks are required? How much time does each task take? How much time is required to setup for the workday or for a particular job? How might the tasks be grouped into work activities most effectively?

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

29

Workplace Design

Key Questions:

What technology is needed? Employees may need a computer or access to customer records and files, special equipment, intercoms, and other forms of technology.

What must the employee be able to see?

What must the employee be able to hear?

What environmental and safety issues need to be addressed?

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

30

Workplace Design

Safety and the work environment:

The job should be designed so that it will be highly unlikely that a worker can injure himself or herself.

The worker must be educated in the proper use of equipment and the methods designed for performing the job.

The surrounding environment must be conducive to safety.

Ergonomics is concerned with improving productivity and safety by designing workplaces, equipment, instruments, computers, workstations, and so on that take into account the physical capabilities of people.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

31

The Human Side of Work

A job is the set of tasks an individual performs.

Job design involves determining the specific job tasks and responsibilities, the work environment, and the methods by which the tasks will be carried out to meet the goals of operations.

Job enlargement is the horizontal expansion of the job to give the worker more variety—although not necessarily more responsibility.

Job enrichment is vertical expansion of job duties to give the worker more responsibility.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

32

Teams

Natural work teams, which perform entire jobs, rather than specialized, assembly-line work.

Virtual teams, in which members communicate by computer, take turns as leaders, and join and leave the team as necessary.

Self-managed teams (SMTs), which are empowered work teams that also assume many traditional management responsibilities.

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

33

Compare and examine the facility layouts of two fast food franchises, such as McDonalds and Burger King.

Evaluate how each of the layouts enhance or hinder productivity and the customer experience. Support your answer.

DISCUSSION: Fast Food Franchises

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN

‹#›

©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.

Chapter 8 facility and work DESIGN