The following are the deliverables that will be expected in this project:
1. Inception Report (grade A) - this is the very first deliverable of the assignment, it is a very important deliverable and it should have a high grade (A) because it sets the first phase of the project. This report will provide the following: the outline of the final report, the methodology of the assignment and the initial budget estimates.
2. First Interim Report (grade B) – this is the second deliverable; it is graded relatively lower than the first deliverable. This report will provide: Finalized budget, the proposed team of professionals and a stakeholders analysis.
3. Second Interim report (grade A) - this is an important deliverable because it is crucial in monitoring the progress of the project. It will clearly outline the communication plan for this project in order to ensure that all team members understand their roles and the chain of protocol.
4. Design Report (grade A) – this is a crucial deliverable that requires serious work to avoid compromising the quality of the desired products such as uniforms, apparel and the gear; the report has a higher grade due to its importance and relevance to this project. The design report will clearly show the design and engineering aspects of the products.
5. Draft Report (grade B) – this is a reflection of the final report; it has a lower grade than the final report since there is time for incorporation of comments from stakeholders and the team members. This deliverable will be based on the outline that was discussed during the inception meeting along with the proposed final report outline that was documented in the inception report