MULTIPLE CHOICE FOR SATISTICS
|
When considering the strategy of a Six Sigma initiative, each functional area manager should place emphasis on |
|||||||||||||||
|
|||||||||||||||
|
DMADV is an acronym that stands for |
|||||||||||||||
|
|||||||||||||||
|
When using a balanced scorecard, which perspective helps the organization understand what the customer values? |
|||||||||||||||
|
|||||||||||||||
|
characteristics of a high-functioning organization include I. Customer focus II. Process focus III. Culture focus IV. Tactics focus V. Statistics focus |
|||||||||||||||
|
|||||||||||||||
|
According to George Eckes, the major reason(s) why projects fail is due to I. Failure to obtain stakeholder buy-in II. Scope creep III. Poor/no champion involvement IV. Insufficient use of the statistical tools of Six Sigma (i.e., the tactics of Six Sigma) V. Poor team dynamics |
|||||||||||||||
|
|||||||||||||||
|
Q x A = E means |
|||||||||||||||
|
|||||||||||||||
|
When using a Balanced Scorecard, which of the following is a financial performance indicator? |
|||||||||||||||
|
|||||||||||||||
|
Which of these statements is correct? |
|||||||||||||||
|
|||||||||||||||
|
At what point in a Six Sigma initiative should you move toward creating a Six Sigma culture? |
|||||||||||||||
|
|||||||||||||||
|
of the following statements is incorrect? |
|||||||||||||||
|
Wek14
|
a Measurement System Evaluation (MSE), measurement error |
||||||||||||
|
||||||||||||
|
The process mean over time is normally expected to drift |
||||||||||||
|
||||||||||||
|
Which of the following statements is true? |
||||||||||||
|
||||||||||||
|
Using the Box Cox Transformation formula, if the original value x = 3 and λ = 2, what is the resulting transformed value? |
||||||||||||
|
#
in
|
process characterization |
|||||||||||||
|
|||||||||||||
|
Pre-control charting uses which of the following to determine process goodness? |
|||||||||||||
|
|||||||||||||
|
Which type of data is defined as "anything that can be classified as either/or?" |
|||||||||||||
|
|
||||||||||||
|
|
|
||||||||||||
|
The Central Limit Theorem states that the distribution of the sample means approaches normal ____________. |
|||||||||||||
|
|||||||||||||
|
: What should NEVER be included on a control chart of any kind? |
|||||||||||||
|
|||||||||||||
|
When referring to measurement system linearity, in general |
|||||||||||||
|
|
||||||||||||
|
|
|
||||||||||||
|
|
|||||||||||||
|
|
|
|
|
|
|
||||||||
|
A process is said to be capable and acceptable when |
|||||||||||||
|
|
||||||||||||
|
|
|
||||||||||||
|
What does a negative Cpk or Ppk indicate? |
|||||||||||||
|
|
||||||||||||
|
|
|
|
What varies more, averages or individuals? |
|||||||||||||
|
|||||||||||||
|
Using the Box Cox Transformation formula, if the original value x = 10 and λ = -3, what is the resulting transformed value? |
|||||||||||||
|
|
||||||||||||
|
|
|
||||||||||||
|
Using the Box Cox Transformation formula, if the original value x = 10 and λ = -3, what is the resulting transformed value? |
|||||||||||||
|
|||||||||||||
|
According to Six Sigma philosophy |
|||||||||||||
|
|||||||||||||
|
is the name of the chart that plots the standard deviation of subgroups? |
|||||||||||||
|
|||||||||||||
|
What is the only variable that determines the width of the control limits of the averages portion of the x-bar, R chart? |
|||||||||||||
|
|||||||||||||
|
A run chart can reveal |
|||||||||||||
|
|||||||||||||
|
Which of the following is NOT an assignable cause on a control chart? |
|||||||||||||
|
|||||||||||||
|
The grand average of the subgroup averages is known as |
|||||||||||||
|
|||||||||||||
|
A trend (in control charting) is typically described as |
|||||||||||||
|
|
||||||||||||
|
|
|
||||||||||||
|
Which of the following statements regarding the normal curve is NOT true? |
|||||||||||||
|
|||||||||||||
|
A trend in a run chart is defined as |
|||||||||||||
|
|||||||||||||
|
Which of the following statements are true? I. A process is capable with a Cp ot Pp = 1.0 II. A process may be acceptable with a Cp or Pp = 1.0 III. A Cp or Pp of 1.0 means the process variation is equal to the specification spread IV. A Cp or Pp of 1.0 means Cpk or Ppk = 2.0 |
|||||||||||||
|
|||||||||||||
|
In George Eckes' lecture on ten questions regarding Six Sigma, he explains that Six Sigma can be applied to all businesses EXCEPT those that |
|||||||||||||
|
|||||||||||||
|
What is the physical manifestation of values and beliefs? |
|||||||||||||
|
|||||||||||||
|
Which of the following is not among the desired behaviors discussed in the change agent lectures? |
|||||||||||||
|
|||||||||||||
|
In George Eckes' lecture on ten questions regarding Six Sigma, he gives some advice to those who already have a "full plate." What is that advice? |
|||||||||||||
|
|||||||||||||
|
of the following statements is true? |
|||||||||||||
|
|||||||||||||
|
A "player" is not willing to accept ownership of a problem. |
|||||||||||||
|
|||||||||||||
|
In George Eckes' lecture on ten questions regarding Six Sigma, he states that members of a Six Sigma process improvement team can generally expect to spend ______ of their work time on Six Sigma activities. |
|||||||||||||
|
|||||||||||||
|
To be an effective change agent, it is important that you are able to |
|||||||||||||
|
|||||||||||||
|
In George Eckes' lecture on ten questions regarding Six Sigma, he identifies ________ as the most creative tool available in the Six Sigma toolbox. |
|||||||||||||
|
|||||||||||||
|
What is the only real difference between your company and your competitors'? |
|||||||||||||
|
|
||||||||||||
|
|
|