Prepare a Project Management Plan for your project Approximately 3,000 words for groups of three.

profilekshitiz
project_management_plan_template.pdf

PROJECT MANAGEMENT PLAN TEMPLATE <PROJECT NAME>

COMPANY NAME

STREET ADDRESS

DATE

This is a template for your second assignment. You are required to prepare a project plan.

Text in Green represents the planning areas you need to cover.

In each case an example/overview is given based on the ‘SmartVoice’ Project. You need to

provide your own project. It should be based on the project you identified in your first

assessment and incorporate any feedback to that assessment.

You may choose a different project but should consult your lecturer first.

Project Management Plan Template

1

TABLE OF CONTENTS INTRODUCTION ................................................................................................................................ 2 PROJECT MANAGEMENT APPROACH ................................................................................................ 2 PROJECT SCOPE ................................................................................................................................ 3 MILESTONE LIST .............................................................................................................................. 3

SCHEDULE BASELINE AND WORK BREAKDOWN STRUCTURE .......................................................... 4 CHANGE MANAGEMENT PLAN ......................................................................................................... 4 COMMUNICATIONS MANAGEMENT PLAN ......................................................................................... 5 COST MANAGEMENT PLAN .............................................................................................................. 7

PROCUREMENT MANAGEMENT PLAN ............................................................................................... 8 PROJECT SCOPE MANAGEMENT PLAN .............................................................................................. 9 SCHEDULE MANAGEMENT PLAN .................................................................................................... 10

QUALITY MANAGEMENT PLAN ...................................................................................................... 11 RISK MANAGEMENT PLAN ............................................................................................................. 12 RISK REGISTER .............................................................................................................................. 13 STAFFING MANAGEMENT PLAN ..................................................................................................... 13

RESOURCE CALENDAR ................................................................................................................... 14 COST BASELINE ............................................................................................................................. 15 QUALITY BASELINE ....................................................................................................................... 16

SPONSOR ACCEPTANCE .................................................................................................................. 17

Project Management Plan Template

2

INTRODUCTION The Introduction provides a high level overview of the project and what is included in this

Project Management Plan. This should include a high level description of the project and

describe the projects deliverables and benefits. Excessive detail is not necessary in this section

as the other sections of the project plan will include this information. This section should

provide a summarized framework of the project and its purpose. Look back at the Project

Charter for information to include in this section.

Total Software Incorporated (TSI) has recently approved the SmartVoice project to move

forward for project initiation within the research and development (R&D) group. This project

will result in the development of new voice recognition software and supports TSI’s corporate

strategy of providing progressive solutions to clients which improve productivity in both the

workplace and home environment. While voice recognition software is currently available, TSI

believes that new technological developments will enable our team to develop a solution far

superior to what is currently available.

TSI has been successful in gaining market share because of its aggressive pursuit of product

quality, ease of use, flexibility, and customer service. Additionally, customers understand that

our products may be applied to a wide range of uses for business and personal functions. By

leveraging our reputation for superior quality and user-friendly products, and capitalizing on new

technology, TSI can position itself as the premier provider of effective and easy to use voice

recognitions software in today’s marketplace.

PROJECT MANAGEMENT APPROACH This section is where you outline the overall management approach for the project. This section

should describe, in general terms, the roles and authority of project team members. It should

also include which organizations will provide resources for the project and any resource

constraints or limitations. If there are any decisions which must be made by specific

individuals—for example authorizing additional funding by the project sponsor—this should also

be stated here. It should be written as an Executive Summary for the Project Management Plan.

The Project Manager, Joe Green, has the overall authority and responsibility for managing and

executing this project according to this Project Plan and its Subsidiary Management Plans. The

project team will consist of personnel from the coding group, quality control/assurance group,

technical writing group, and testing group. The project manager will work with all resources to

perform project planning. All project and subsidiary management plans will be reviewed and

approved by the project sponsor. All funding decisions will also be made by the project sponsor.

Any delegation of approval authority to the project manager should be done in writing and be

signed by both the project sponsor and project manager.

The project team will be a matrix in that team members from each organization continue to

report to their organizational management throughout the duration of the project. The project

manager is responsible for communicating with organizational managers on the progress and

performance of each project resource.

Project Management Plan Template

3

PROJECT SCOPE State the scope of the project in this section. The scope statement from the project charter should

be used as a starting point; however, the project plan needs to include a much more detailed

scope than the charter. This detail should include what the project does and does not include.

The more detail included in this section, the better the product. This will help to clarify what is

included in the project and help to avoid any confusion from project team members and

stakeholders.

The scope of TSI’s SmartVoice project includes the planning, design, development, testing, and

transition of the SmartVoice voice recognition software package. This software will meet or

exceed organizational software standards and additional requirements established in the project

charter. The scope of this project also includes completion of all documentation, manuals, and

training aids to be used in conjunction with the software. Project completion will occur when the

software and documentation package has been successfully executed and transitioned to TSI’s

manufacturing group for production.

All SmartVoice project work will be performed internally and no portion of this project will be

outsourced. The scope of this project does not include any changes in requirements to standard

operating systems to run the software, software updates or revisions.

MILESTONE LIST Provide a summary list of milestones including dates for each milestone. Include an introductory

paragraph in this section which provides some insight to the major milestones. This section

should also mention or discuss actions taken if any changes to the milestones or delivery dates

are required.

The below chart lists the major milestones for the SmartVoice Project. This chart is comprised

only of major project milestones such as completion of a project phase or gate review. There

may be smaller milestones which are not included on this chart but are included in the project

schedule and WBS. If there are any scheduling delays which may impact a milestone or delivery

date, the project manager must be notified immediately so proactive measures may be taken to

mitigate slips in dates. Any approved changes to these milestones or dates will be communicated

to the project team by the project manager.

Milestone Description Date

Complete Requirements

Gathering

All requirements for SmartVoice must be determined

to base design upon

2/28/xx

Complete SmartVoice

Design

This is the theoretical design for the software and its

functionality

5/31/xx

Complete SmartVoice

Coding

All coding completed resulting in software prototype 7/31/xx

Complete SmartVoice

Testing and Debugging

All functionality tested and all identified errors

corrected

8/31/xx

Complete Transition of

SmartVoice to TSI

Completed software and documentation transitioned

to operations group to begin production

11/30/xx

Project Management Plan Template

4

Production

SCHEDULE BASELINE AND WORK BREAKDOWN STRUCTURE This section should discuss the WBS, WBS Dictionary, and Schedule baseline and how they will

be used in managing the project’s scope. The WBS provides the work packages to be performed

for the completion of the project. The WBS Dictionary defines the work packages. The

schedule baseline provides a reference point for managing project progress as it pertains to

schedule and timeline. The schedule baseline and work breakdown structure (WBS) should be

created in Microsoft Project. The WBS can be exported from the MS Project file.

The WBS for the SmartVoice Project is comprised of work packages which do not exceed 40

hours of work but are at least 4 hours of work. Work packages were developed through close

collaboration among project team members and stakeholders with input from functional

managers and research from past projects.

The WBS Dictionary defines all work packages for the SmartVoice Project. These definitions

include all tasks, resources, and deliverables. Every work package in the WBS is defined in the

WBS Dictionary and will aid in resource planning, task completion, and ensuring deliverables

meet project requirements.

The SmartVoice Project schedule was derived from the WBS and Project Charter with input

from all project team members. The schedule was completed, reviewed by the Project Sponsor,

and approved and base-lined. The schedule will be maintained as a MS Project Gantt Chart by

the SmartVoice Project Manager. Any proposed changes to the schedule will follow TSI’s

change control process. If established boundary controls may be exceeded, a change request will

be submitted to the Project Manager. The Project Manager and team will determine the impact

of the change on the schedule, cost, resources, scope, and risks. If it is determined that the

impacts will exceed the boundary conditions then the change will be forwarded to the Project

Sponsor for review and approval. The SmartVoice boundary conditions are:

CPI less than 0.8 or greater than 1.2

SPI less than 0.8 or greater than 1.2

If the change is approved by the Project Sponsor then it will be implemented by the Project

Manager who will update the schedule and all documentation and communicate the change to all

stakeholders in accordance with the Change Control Process.

The Project Schedule Baseline and Work Breakdown Structure are provided in Appendix A,

Project Schedule and Appendix B, Work Breakdown Structure.

CHANGE MANAGEMENT PLAN This section should describe your change control process. Ideally, this process will be some type

of organizational standard which is repeatable and done on most or all projects when a change is

necessary. Changes to any project must be carefully considered and the impact of the change

must be clear in order to make any type of approval decisions. Many organizations have change

control boards (CCBs) which review proposed changes and either approve or deny them. This is

Project Management Plan Template

5

an effective way to provide oversight and ensure adequate feedback and review of the change is

obtained. This section should also identify who has approval authority for changes to the

project, who submits the changes, how they are tracked and monitored.

For complex or large projects the Change Management Plan may be included as an appendix to

the Project Management Plan or as a separate, stand-alone document. We have a detailed

Change Management Plan template available on our website.

The following steps comprise TSI’s organization change control process for all projects and will

be utilized on the SmartVoice project:

Step #1: Identify the need for a change (Any Stakeholder)

Requestor will submit a completed TSI change request form to the project manager

Step #2: Log change in the change request register (Project Manager)

The project manager will maintain a log of all change requests for the duration of the

project

Step #3: Conduct an evaluation of the change (Project Manager, Project Team, Requestor)

The project manager will conduct an evaluation of the impact of the change to cost, risk,

schedule, and scope

Step #4: Submit change request to Change Control Board (CCB) (Project Manager)

The project manager will submit the change request and analysis to the CCB for review

Step #5: Change Control Board decision (CCB)

The CCB will discuss the proposed change and decide whether or not it will be approved

based on all submitted information

Step #6: Implement change (Project Manager)

If a change is approved by the CCB, the project manager will update and re-baseline

project documentation as necessary as well as ensure any changes are communicated to

the team and stakeholders

Any team member or stakeholder may submit a change request for the SmartVoice Project. The

SmartVoice Project Sponsor will chair the CCB and any changes to project scope, cost, or

schedule must meet his approval. All change requests will be logged in the change control

register by the Project Manager and tracked through to completion whether approved or not.

COMMUNICATIONS MANAGEMENT PLAN The purpose of the Communications Management Plan is to define the communication

requirements for the project and how information will be distributed to ensure project success.

You should give considerable thought to how you want to manage communications on every

project. By having a solid communications management approach you’ll find that many project

management problems can be avoided. In this section you should provide an overview of your

communications management approach. Generally, the Communications Management Plan

defines the following:

 Communication requirements based on roles

 What information will be communicated

 How the information will be communicated

 When will information be distributed

Project Management Plan Template

6

 Who does the communication

 Who receives the communication

 Communications conduct

For larger and more complex projects, the Communications Management Plan may be included

as an appendix or separate document apart from the Project Management Plan. We have a

detailed Communications Management Plan template available on our website.

This Communications Management Plan sets the communications framework for this project. It

will serve as a guide for communications throughout the life of the project and will be updated as

communication requirements change. This plan identifies and defines the roles of SmartVoice

project team members as they pertain to communications. It also includes a communications

matrix which maps the communication requirements of this project, and communication conduct

for meetings and other forms of communication. A project team directory is also included to

provide contact information for all stakeholders directly involved in the project.

The Project Manager will take the lead role in ensuring effective communications on this project.

The communications requirements are documented in the Communications Matrix below. The

Communications Matrix will be used as the guide for what information to communicate, who is

to do the communicating, when to communicate it, and to whom to communicate.

Communication

Type Description Frequency Format Participants/

Distribution Deliverable Owner

Weekly Status Report

Email summary of

project status Weekly Email

Project Sponsor, Team and

Stakeholders Status Report

Project Manager

Weekly Project Team Meeting

Meeting to review action register and

status

Weekly In Person Project Team Updated Action

Register

Project Manager

Project Monthly Review (PMR)

Present metrics and

status to team and sponsor

Monthly In Person Project Sponsor,

Team, and Stakeholders

Status and Metric

Presentation

Project Manager

Project Gate Reviews

Present closeout of

project phases and kickoff next phase

As Needed In Person Project Sponsor,

Team and Stakeholders

Phase completion report and

phase kickoff

Project Manager

Technical Design Review

Review of any technical

designs or work

associated with the project

As Needed In Person Project Team Technical

Design Package

Project Manager

Project team directory for all communications is:

Name Title E mail Office Phone Cell Phone

Project Management Plan Template

7

John Davis Project Sponsor [email protected] xxx-xxx-xxxx xxx-xxx-xxxx

Joe Green Project Manager [email protected] xxx-xxx-xxxx xxx-xxx-xxxx

Herb Walker Senior

Programmer [email protected] xxx-xxx-xxxx xxx-xxx-xxxx

Jason Black Programmer [email protected] xxx-xxx-xxxx xxx-xxx-xxxx

Mary White Sr. Quality

Specialist [email protected] xxx-xxx-xxxx xxx-xxx-xxxx

Ron Smith Quality

Specialist [email protected] xxx-xxx-xxxx xxx-xxx-xxxx

Tom Sunday Technical Writer [email protected] xxx-xxx-xxxx xxx-xxx-xxxx

Karen Brown Testing

Specialist [email protected] xxx-xxx-xxxx xxx-xxx-xxxx

Communications Conduct:

Meetings:

The Project Manager will distribute a meeting agenda at least 2 days prior to any scheduled

meeting and all participants are expected to review the agenda prior to the meeting. During all

project meetings the timekeeper will ensure that the group adheres to the times stated in the

agenda and the recorder will take all notes for distribution to the team upon completion of the

meeting. It is imperative that all participants arrive to each meeting on time and all cell phones

and blackberries should be turned off or set to vibrate mode to minimize distractions. Meeting

minutes will be distributed no later than 24 hours after each meeting is completed.

Email:

All email pertaining to the SmartVoice Project should be professional, free of errors, and provide

brief communication. Email should be distributed to the correct project participants in

accordance with the communication matrix above based on its content. All attachments should

be in one of the organization’s standard software suite programs and adhere to established

company formats. If the email is to bring an issue forward then it should discuss what the issue

is, provide a brief background on the issue, and provide a recommendation to correct the issue.

The Project Manager should be included on any email pertaining to the SmartVoice Project.

Informal Communications:

While informal communication is a part of every project and is necessary for successful project

completion, any issues, concerns, or updates that arise from informal discussion between team

members must be communicated to the Project Manager so the appropriate action may be taken.

COST MANAGEMENT PLAN The Cost Management Plan clearly defines how the costs on a project will be managed

throughout the project’s lifecycle. It sets the format and standards by which the project costs are

measured, reported, and controlled. Working within the cost management guidelines is

imperative for all project team members to ensure successful completion of the project. These

guidelines may include which level of the WBS cost accounts will be created in and the

establishment of acceptable variances. The Cost Management Plan:

 Identifies who is responsible for managing costs

Project Management Plan Template

8

 Identifies who has the authority to approve changes to the project or its budget

 How cost performance is quantitatively measured and reported upon

 Report formats, frequency and to whom they are presented

For complex or large projects the Cost Management Plan may be included as an appendix to the

Project Management Plan or as a separate, stand-alone document. We have a detailed Cost

Management Plan template available on our website.

The Project Manager will be responsible for managing and reporting on the project’s cost

throughout the duration of the project. The Project Manager will present and review the

project’s cost performance during the monthly project status meeting. Using earned value

calculations, the Project Manager is responsible for accounting for cost deviations and presenting

the Project Sponsor with options for getting the project back on budget. All budget authority and

decisions, to include budget changes, reside with the SmartVoice Project Sponsor.

For the SmartVoice Project, control accounts will be created at the fourth level of the WBS

which is where all costs and performance will be managed and tracked. Financial performance of

the SmartVoice Project will be measured through earned value calculations pertaining to the

project’s cost accounts. Work started on work packages will grant that work package with 50%

credit; whereas, the remaining 50% is credited upon completion of all work defined in that work

package. Costs may be rounded to the nearest dollar and work hours rounded to the nearest

whole hour.

Cost and Schedule Performance Index (CPI and SPI respectively) will be reported on a monthly

basis by the Project Manager to the Project Sponsor. Variances of 10% or +/- 0.1 in the cost and

schedule performance indexes will change the status of the cost to yellow or cautionary. These

will be reported and if it’s determined that there is no or minimal impact on the project’s cost or

schedule baseline then there may be no action required. Cost variances of 20%, or +/- 0.2 in the

cost and schedule performance indexes will change the status of the cost to red or critical. These

will be reported and require corrective action from the Project Manager in order to bring the cost

and/or schedule performance indexes back in line with the allowable variance. Any corrective

actions will require a project change request and be must approved by the CCB before it can be

implemented.

Earned value calculations will be compiled by the Project Manager and reported at the monthly

project status meeting. If there are indications that these values will approach or reach the

critical stage before a subsequent meeting, the Project Manager will communicate this to the

Project Sponsor immediately.

PROCUREMENT MANAGEMENT PLAN The Procurement Management Plan should be defined enough to clearly identify the necessary

steps and responsibilities for procurement from the beginning to the end of a project. The project

manager must ensure that the plan facilitates the successful completion of the project and does

not become an overwhelming task in itself to manage. The project manager will work with the

project team, contracts/purchasing department, and other key players to manage the procurement

activities.

Project Management Plan Template

9

For larger projects or projects with more complicated procurement management requirements,

you can include the Procurement Management Plan as a separate document apart from the

Project Management Plan. We have a detailed Procurement Management Plan available on our

website.

The Project Manager will provide oversight and management for all procurement activities under

this project. The Project Manager is authorized to approve all procurement actions up to

$50,000. Any procurement actions exceeding this amount must be approved by the Project

Sponsor.

While this project requires minimal or no procurement, in the event procurement is required, the

Project Manager will work with the project team to identify all items or services to be procured

for the successful completion of the project. The Project Manager will then ensure these

procurements are reviewed by the Program Management Office (PMO) and presented to the

contracts and purchasing groups. The contracts and purchasing groups will review the

procurement actions, determine whether it is advantageous to make or buy the items or resource

required services internally, and begin the vendor selection, purchasing and the contracting

process.

In the event a procurement becomes necessary, the Project Manager will be responsible for

management any selected vendor or external resource. The Project Manager will also measure

performance as it relates to the vendor providing necessary goods and/or services and

communicate this to the purchasing and contracts groups.

PROJECT SCOPE MANAGEMENT PLAN It is important that the approach to managing the projects’ scope be clearly defined and

documented in detail. Failure to clearly establish and communicate project scope can result in

delays, unnecessary work, failure to achieve deliverables, cost overruns, or other unintended

consequences. This section provides a summary of the Scope Management Plan in which it

addresses the following:

 Who has authority and responsibility for scope management

 How the scope is defined (i.e. Scope Statement, WBS, WBS Dictionary, Statement of Work, etc.)

 How the scope is measured and verified (i.e. Quality Checklists, Scope Baseline, Work Performance Measurements, etc.)

 The scope change process (who initiates, who authorizes, etc.)

 Who is responsible for accepting the final project deliverable and approves acceptance of project scope

We have a detailed Scope Management Plan available on our website which can be included as

an appendix to the Project Management Plan for larger or more complex projects. Be sure to

review it and determine if it's necessary for managing your project.

Scope management for the SmartVoice Project will be the sole responsibility of the Project

Manager. The scope for this project is defined by the Scope Statement, Work Breakdown

Project Management Plan Template

10

Structure (WBS) and WBS Dictionary. The Project Manager, Sponsor, and Stakeholders will

establish and approve documentation for measuring project scope which includes deliverable

quality checklists and work performance measurements.

Proposed scope changes may be initiated by the Project Manager, Stakeholders or any member

of the project team. All change requests will be submitted to the Project Manager who will then

evaluate the requested scope change. Upon acceptance of the scope change request the Project

Manager will submit the scope change request to the Change Control Board and Project Sponsor

for acceptance. Upon approval of scope changes by the Change Control Board and Project

Sponsor the Project Manager will update all project documents and communicate the scope

change to all stakeholders. Based on feedback and input from the Project Manager and

Stakeholders, the Project Sponsor is responsible for the acceptance of the final project

deliverables and project scope.

The Project Sponsor is responsible for formally accepting the project’s final deliverable. This

acceptance will be based on a review of all project documentation, testing results, beta trial

results, and completion of all tasks/work packages and product functionality.

SCHEDULE MANAGEMENT PLAN This section provides a general framework for the approach which will be taken to create the

project schedule. Effective schedule management is necessary for ensuring tasks are completed

on time, resources are allocated appropriately, and to help measure project performance. This

section should include discussion of the scheduling tool/format, schedule milestones, and

schedule development roles and responsibilities.

Be sure to check out the detailed Schedule Management Plan available on our website. The

separate Schedule Management Plan is suitable for larger projects or projects where the schedule

management is more formalized.

Project schedules for the SmartVoice Project will be created using MS Project 2007 starting with

the deliverables identified in the project’s Work Breakdown Structure (WBS). Activity

definition will identify the specific work packages which must be performed to complete each

deliverable. Activity sequencing will be used to determine the order of work packages and

assign relationships between project activities. Activity duration estimating will be used to

calculate the number of work periods required to complete work packages. Resource estimating

will be used to assign resources to work packages in order to complete schedule development.

Once a preliminary schedule has been developed, it will be reviewed by the project team and any

resources tentatively assigned to project tasks. The project team and resources must agree to the

proposed work package assignments, durations, and schedule. Once this is achieved the project

sponsor will review and approve the schedule and it will then be base lined.

In accordance with TSI’s organizational standard, the following will be designated as milestones

for all project schedules:

 Completion of scope statement and WBS/WBS Dictionary

 Base lined project schedule

Project Management Plan Template

11

 Approval of final project budget

 Project kick-off

 Approval of roles and responsibilities

 Requirements definition approval

 Completion of data mapping/inventory

 Project implementation

 Acceptance of final deliverables

Roles and responsibilities for schedule development are as follows:

The project manager will be responsible for facilitating work package definition, sequencing, and

estimating duration and resources with the project team. The project manager will also create the

project schedule using MS Project 2007 and validate the schedule with the project team,

stakeholders, and the project sponsor. The project manager will obtain schedule approval from

the project sponsor and baseline the schedule.

The project team is responsible for participating in work package definition, sequencing,

duration, and resource estimating. The project team will also review and validate the proposed

schedule and perform assigned activities once the schedule is approved.

The project sponsor will participate in reviews of the proposed schedule and approve the final

schedule before it is base lined.

The project stakeholders will participate in reviews of the proposed schedule and assist in its

validation.

QUALITY MANAGEMENT PLAN This section discusses how quality management will be used to ensure that the deliverables for

the project meet a formally established standard of acceptance. All project deliverables should

be defined in order to provide a foundation and understanding of the tasks at hand and what work

must be planned. Quality management is the process by which the organization not only

completes the work, but completes the work to an acceptable standard. Without a thorough

Quality Management Plan, work may be completed in a substandard or unacceptable manner.

This section should include quality roles and responsibilities, quality control, quality assurance,

and quality monitoring.

For larger or more complex projects, the Quality Management Plan may be included as an

appendix or separate document. A detailed Quality Management Plan is available for use on our

website.

All members of the SmartVoice project team will play a role in quality management. It is

imperative that the team ensures that work is completed at an adequate level of quality from

individual work packages to the final project deliverable. The following are the quality roles and

responsibilities for the SmartVoice Project:

Project Management Plan Template

12

The Project Sponsor is responsible for approving all quality standards for the SmartVoice

Project. The Project Sponsor will review all project tasks and deliverables to ensure compliance

with established and approved quality standards. Additionally, the Project Sponsor will sign off

on the final acceptance of the project deliverable.

The Project Manager is responsible for quality management throughout the duration of the

project. The Project Manager is responsible for implementing the Quality Management Plan

and ensuring all tasks, processes, and documentation are compliant with the plan. The Project

Manager will work with the project’s quality specialists to establish acceptable quality

standards. The Project Manager is also responsible for communicating and tracking all quality

standards to the project team and stakeholders.

The Quality Specialists are responsible for working with the Project Manager to develop and

implement the Quality Management Plan. Quality Specialists will recommend tools and

methodologies for tracking quality and standards to establish acceptable quality levels. The

Quality Specialists will create and maintain Quality Control and Assurance Logs throughout the

project.

The remaining member of the project team, as well as the stakeholders will be responsible for

assisting the Project Manager and Quality Specialists in the establishment of acceptable quality

standards. They will also work to ensure that all quality standards are met and communicate any

concerns regarding quality to the Project Manager.

Quality control for the SmartVoice Project will utilize tools and methodologies for ensuring that

all project deliverables comply with approved quality standards. To meet deliverable

requirements and expectations, we must implement a formal process in which quality standards

are measured and accepted. The Project Manager will ensure all quality standards and quality

control activities are met throughout the project. The Quality Specialists will assist the Project

Manager in verifying that all quality standards are met for each deliverable. If any changes are

proposed and approved by the Project Sponsor and CCB, the Project Manager is responsible for

communicating the changes to the project team and updating all project plans and

documentation.

Quality assurance for the SmartVoice Project will ensure that all processes used in the

completion of the project meet acceptable quality standards. These process standards are in

place to maximize project efficiency and minimize waste. For each process used throughout the

project, the Project Manager will track and measure quality against the approved standards with

the assistance of the Quality Specialists and ensure all quality standards are met. If any changes

are proposed and approved by the Project Sponsor and CCB, the Project Manager is responsible

for communicating the changes to the project team and updating all project plans and

documentation.

RISK MANAGEMENT PLAN This section provides a general description for the approach taken to identify and manage the

risks associated with the project. It should be a short paragraph or two summarizing the

approach to risk management on this project.

Project Management Plan Template

13

Since risk management is a science in itself, we have many risk management templates available

on our website. Look for the detailed Risk Management Plan, Risk Register along with

templates for performing a risk assessment meeting.

The approach for managing risks for the SmartVoice Project includes a methodical process by

which the project team identifies, scores, and ranks the various risks. Every effort will be made

to proactively identify risks ahead of time in order to implement a mitigation strategy from the

project’s onset. The most likely and highest impact risks were added to the project schedule to

ensure that the assigned risk managers take the necessary steps to implement the mitigation

response at the appropriate time during the schedule. Risk managers will provide status updates

on their assigned risks in the bi-weekly project team meetings, but only when the meetings

include their risk’s planned timeframe.

Upon the completion of the project, during the closing process, the project manager will analyze

each risk as well as the risk management process. Based on this analysis, the project manager

will identify any improvements that can be made to the risk management process for future

projects. These improvements will be captured as part of the lessons learned knowledge base.

RISK REGISTER

The Risk Register for this project is provided in Appendix C, Risk Register.

STAFFING MANAGEMENT PLAN Discuss how you plan to staff the project. This section should include discussion on matrixed or

projectized organizational structure depending on which is being used for this project. This

section should also include how resources will be procured and managed as well as the key

resources needed for the project.

The SmartVoice Project will consist of a matrix structure with support from various internal

organizations. All work will be performed internally. Staffing requirements for the SmartVoice

Project include the following:

Project Manager (1 position) – responsible for all management for the SmartVoice Project. The

Project Manager is responsible for planning, creating, and/or managing all work activities,

variances, tracking, reporting, communication, performance evaluations, staffing, and internal

coordination with functional managers.

Senior Programmer (1 position) – responsible for oversight of all coding and programming tasks

for the SmartVoice Project as well as ensuring functionality is compliant with quality standards.

Responsible for working with the Project Manager to create work packages, manage risk,

manage schedule, identify requirements, and create reports. The Senior Programmer will be

managed by the Project Manager who will provide performance feedback to the functional

manager.

Programmer (1 position) – responsible for coding and programming for the SmartVoice Project.

All coding and programming tasks will be reviewed by the Senior Programmer prior to

Project Management Plan Template

14

implementation. Responsibilities also include assisting with risk identification, determining

impacts of change requests, and status reporting. The Programmer will be managed by the

Project Manager and feedback will be provided to the functional manager for performance

evaluations by the Project Manager and Senior Programmer.

Senior Quality Specialist (1 position) – responsible for assisting the Project Manager in creating

quality control and assurance standards. The Senior Quality Specialist is also responsible for

maintaining quality control and assurance logs throughout the project. The Senior Quality

Specialist will be managed by the Project Manager who will also provide feedback to the

functional manager for performance evaluations.

Quality Specialist (1 position) – responsible for assisting the Project Manager and Senior Quality

Specialist in creating and tracking quality control and assurance standards. The Quality

Specialist will have primary responsibility for compiling quality reporting and metrics for the

Project Manager to communicate. The Quality Specialist will be managed by the Project

Manager who will provide feedback, along with the Senior Quality Specialist to the functional

manager for performance evaluations.

Technical Writer (1 position) – responsible for compiling all project documentation and

reporting into organizational formats. Responsible for assisting the Project Manager in

Configuration Management and revision control for all project documentation. Responsible for

scribing duties during all project meetings and maintaining all project communication

distribution lists. The Technical Writer will be managed by the Project Manager who will also

provide feedback to the functional manager for performance evaluations.

Testing Specialist (1 position) – responsible for helping establish testing specifications for the

SmartVoice Project with the assistance of the Project Manager and Programmers. Responsible

for ensuring all testing is complete and documented in accordance with TSI standards.

Responsible for ensuring all testing resources are coordinated. The Testing Specialist will be

managed by the Project Manager who will also provide feedback to the functional manager for

performance evaluations.

The Project Manager will negotiate with all necessary TSI functional managers in order to

identify and assign resources for the SmartVoice Project. All resources must be approved by the

appropriate functional manager before the resource may begin any project work. The project

team will not be co-located for this project and all resources will remain in their current

workspace.

RESOURCE CALENDAR Include a Resource Calendar as part of your project plan. The resource calendar identifies key

resources needed for the project and the times/durations they'll be needed. Some resources may

be needed for the entire length of the project while others may only be required for a portion of

the project. This information must be agreed to by the Project Sponsor and Functional Managers

prior to beginning the project.

Project Management Plan Template

15

The SmartVoice Project will require all project team members for the entire duration of the

project although levels of effort will vary as the project progresses. The Project is scheduled to

last one year with standard 40 hour work weeks. If a project team member is not required for a

full 40 hour work week at any point during the project, their efforts outside of the SmartVoice

Project will be at the discretion of their Functional Manager.

COST BASELINE This section contains the cost baseline for the project upon which cost management will be

based. The project will use earned value metrics to track and manage costs and the cost baseline

provides the basis for the tracking, reporting, and management of costs.

The cost baseline for the SmartVoice project includes all budgeted costs for the successful

completion of the project.

Project Phase Budgeted Total Comments

Planning $350,000 Includes work hours for all

project team members for

gathering requirements and

planning project

Design $250,000 Includes work hours for all

project team members for

work on SmartVoice

conceptual design

Coding $200,000 Includes all work hours for

coding of SmartVoice

Testing $175,000 Includes all work hours for

testing (including beta testing)

SmartVoice Resource Calendar

0

20

40

60

80

100

120

140

160

180

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Month

H o

u rs

p e r

m o

n th PM

Programmers

Quality Specs

Tech Writer

Testing Spec

Project Management Plan Template

16

of SmartVoice software

Transition and Closeout $150,000 Includes all work hours for

transition to operations and

project closeout

QUALITY BASELINE This section should include the quality baseline for the project. The purpose of this baseline is to

provide a basis for ensuring that quality can be measured to determine if acceptable quality

levels have been achieved. It is important for all projects to clearly define and communicate

quality standards and the quality baseline serves this purpose.

The SmartVoice Project must meet the quality standards established in the quality baseline. The

quality baseline is the baseline which provides the acceptable quality levels of the SmartVoice

Project. The software must meet or exceed the quality baseline values in order to achieve

success.

Item Acceptable Level Comments

Voice Recognition At least 98% recognition level

with 2% or less errors in text

Using standard TSI English

language databases

Compatibility No errors associated with

running software with

compatible applications

Using the _______ suite of

applications

Supporting Documentation Less than 1% failure rate in

beta testing new users to run

setup and execute software

functionality

Project Management Plan Template

17

SPONSOR ACCEPTANCE

Approved by the Project Sponsor:

__________________________________________ Date: ___________________

<Project Sponsor>

<Project Sponsor Title>