You are required to choose ONE main component from a way of transportation (Car, Plane, Train, etc…) that has an important function and create a case study on that component. You are required to turn in one hard copy.
The case Study will focus on: (Function, Design, Material, process and Cost)
1.
The Design Communication part:
Sketching
Design drawings
Detail drawings
Fabrication specifications: Including: physical Dimensions, Material used, unusual assembly conditions, operating conditions and parameters
2.
The Design Modeling part
Create well-defined 3D models of all parts required,
Create detail drawings of all parts using Third Angle Projection in accordance to ANSI 14.5-2009 and ANSI14.3 -2003 on B-size papers. Make sure the title block is completely filled as appropriate. Add local notes to assist in the manufacturing process,
Create an assembly drawing with an exploded view, Bill of Materials, section views, and complete title block,
3.
Technical Report
Manufacturing section must the selected manufacturing process (es), the reasons for choosing these processes (i.e. advantages and disadvantages), cost of tools (if applicable), the number of units can manufactured per cycle.
Cost analysis section must include raw materials, hardware (i.e. springs, bolts, nuts etc.), packaging, shipping, tooling etc... For producing 100,000unit
The final report elements:
I. Introduction
II. Generating of design
III. Design selection process
IV. Final design
a. Detailed description
b. Prototype details
V. Cost analysis
VI. Conclusions
VII. References
Expectations:
The report should consist at least of 15 pages, 12 font size and 1.5 spacing.
You may include SW animation of your design, but you must create engineering drawings as discussed in the previous sections. Hand-free sketches can also be included in your report
Complete bibliography of all resources must be included and annotated inside the report according to MLA standards.
Hard-work, dedications, persistence, professionalism, teamwork, and good communication are the minimum expectation for this project.