The facility runs two 8-hour shifts per day, with a third shift for maintenance. The industrial engineering department has provided you with thefollowing data on present operations. In addition, you have been told that assembly operations, while not unlimited, can be easily changed tomeet the need.
|
Operation |
Number ofMachines |
Run Time per Piece (min.) |
% Reject Rate |
|
Milling |
5 |
2 |
3 |
|
Grinding |
7 |
3 |
5 |
|
Boring |
3 |
1 |
2 |
|
Drilling |
6 |
2.5 |
7 |
1. Calculate the capacity of each machine center and the capacity of the system.
2. If Beck wants to expand capacity, where should he focus the company's efforts? How much extra capacity can he get without causing anotheroperation to become the bottleneck?
3. How may Mr. Beck expand capacity without purchasing new equipment? Be specific.