Running head: MS PROJECT 1

MS PROJECT 2

Microsoft Project: Repairing and repainting My Two Flats

Student’s Name

Professor’s Name

University Affiliation

Microsoft Project- Repair and Repainting of My Two Flats

IP1: scope statement. The scope of this project is to repair and repaint the rest of my two flats walls at a cost of $ 8000. The project is expected to start in mid January and take sixty days to complete.

IP2: MS Project 1

Objective: to complete repairing and repainting my two flats at a cost of $ 8000 by the 5th of February 2014

1.0 Planning phase

1.1 Allocating $8000 for the project from my savings account

1.2 Determining the materials needed for repair and repainting work

1.3 Choosing the kind of products to use

1.4 Making orders for the chosen products

1.5 Bargaining for the best possible resource plan

1.6 Endorsing the project plan after close scrutiny 2.0 Wall Preparation phase

2.1 Avail the required materials and tools in the store (shovel, brushes, buckets, ladder and paint)

2.2 Remove the wall paintings, pictures and wall furnishings

2.3 Scrap off the dirt and insect buildings

2.4 Sustainable disposing of trash (unnecessary paintings and wall marts)

2.5 identify all the repair zones and set up the wall repair and painting plan

2.6 Make arrangement for the next phase

3.0 Execution phase

3.1 wet the wall sections to be repaired

3.2 Fill the broken wall parts with cement sludge

3.2 Plaster the repaired holes and cracks

3.3 Scrap off the cement remains on the wall

3.4 daily watering of the wall till it dry off

3.5 Clean the wall for painting

3.6. Outline the window and door frames with blue tape

3.7 Prime the wall

3.8 Paint the wall

3.9 Remove the outline tape previously used.