Greenbelt Examination (1 Hour to Complete)
Name: Date:
Directions: Please answer the following questions based on class material and discusson.
1) What are the seven common types of MUDA?
2) What are the common Lean Tools? (name 8)
3) Name ten of the principles of Lean
4) What are the steps involved in Practical Problem Solving?
5) How is Lean different than Six Sigma?
6) What does DMAIC stand for?
7) What common Tools MUST be used in a Six Sigma project (name 10)
8) Name the most common graphical tools of Quality (at least six)
TRUE OR FALSE
9) Error-Proofing is considered superior to Mistake-Proofing in terms of quality of prevention. ( )
10) C relates to longer-term performance data; P relates to near-term. ( )
11) Problem statements work best when a recommendation of the solution is provided. ( )
12) The 90/50 rule says < 3 Sigma should call for a 50% improvement. ( )
13) Performance problems can be based in data that is not centered as well as data that is spread far from the mean. ( )
14) Cause and Effect Matrix comes after the Failure Mode Effects and after The Control Plan. ( )
15) CTD relates to that which is Critical to Quality in the eyes of the customer. ( )