Risk plan assessment

profilesolarysystem1
20141121140619risk_list_-3.doc

RISK WATCH LIST

· Develop a Risk Watch List for a program or project you are working on or one with which you are familiar.

· Include, if possible, a risk for each of the following categories: technical, cost, schedule, programmatic/external.

· Develop at least two potential solutions/actions for each risk that is listed.

· Calculate the current levels if possible – #1 is low, #10 is high.

• Use the format provided on page 627-10-12 in your Study Reference Guide.