PART (i) (20 marks)

Autovalet Manufacturing uses a job order cost system in each of its three manufacturing departments. Manufacturing overhead is applied to jobs on the basis of direct labour cost in Department A, direct labour hours in Department B and machine hours in Department C. The following estimates were used in establishing the predetermined overhead rates for 2014: Department

A

B

C

Manufacturing Overhead

$840,000

$902,000

$850,000

Direct Labour Cost

$600,000

$100,000

$600,000

Direct Labour Hours

50,000

41,000

50,000

Machine Hours

100,000

120,000

170,000

(a) Calculate the predetermined overhead rate for each department. (4 marks)

(b) During January 2014, the job cost sheets showed the following costs and production data:

Department

A

B

C

Direct materials used

$88,000

$85,000

$69,000

Direct Labour Cost

$50,000

$37,400

$48,600

Direct Labour Hours

4,000

3,500

4,200

Machine Hours

8,000

10,500

12,800

Manufacturing overhead incurred

$78,000

$69,500

$67,200

Calculate the total manufacturing cost assigned to jobs in January in each department.

(c) Calculate the overhead variance for each department at January 31. (4½ marks)

(d) Using the total figures, record the journal entries for:

i) Total direct materials used

ii) Total direct labour costs incurred

iii) Total manufacturing overhead incurred

iv) Total manufacturing overhead applied

v) The manufacturing overhead variance

PART (ii) (20 marks)

The New Beginning Electronics Co. produces an electronic gadget in a three-stage process –Assembly, Programming and Packing. Costs incurred in the Programming Department during October are summarized as follows:

WIP - Programming Department A/C October 1 Bal.

Transfer From Assembly 2,000

Direct Materials Added

Direct Labour

Manufacturing O/H

$ 0

664,400

314,240

802,780

881,100

Normal losses are estimated to be 1% of input during the period. Inspection takes place during the processing operation, at which point bad units are separated from good units and sold as scrap at $550 each.

At inspection, 30 gadgets were rejected as scrap. These units had reached the following degree of completion:

Transfer from Assembly 100%

Direct material added 60%

Conversion costs 40%

Work-in-progress at the end of October was 40 gadgets and had reached the following degree of completion:

Transfer from Assembly 100%

Direct material added 70%

Conversion costs 60%

Direct materials added and conversion costs are incurred uniformly throughout the process.

Required:

i) A statement clearly showing the equivalent units for each cost element, namely Transfer from Assembly, direct material added and conversion costs. (5½ marks)

ii) Calculate:

Cost per unit of finished product, by element of cost and total.

Cost of units completed and transferred to Packing

Cost of unexpected losses

Cost of the units in the Programming Department ending work in process inventory

(6½ marks)

iii) Present the journal entries to record the assignment of direct materials and direct labour and the allocation of manufacturing overhead to the Programming Process. Also give the journal entry to record the cost of the units completed and transferred out to Packing. (3 marks)

iv) Complete the Work in Process Inventory – Programming Department T-account, clearly showing the ending balance. (3 marks)

v) Prepare the abnormal spoilage statement, clearly showing the amount transferred to the costing profit and loss account. (2 marks