construction administration work

profilemwade3
risk_assessment_.docx

Running head: CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT 2

Risk Assessment Project

Construction Management CMT-4130

Activity 1

Visit a construction site and identify all actual and inherent risks seen

Provide the location and time of visit

Take photographs of the risks identified

Activity 2:

Compile a report that lists the risks identified

Determine if those risks are speculative, pure or financial

Provide a determination of whether you assume or shift those risks, as well as how you intend to accomplish this task

Note: If you are unable to visit an actual working construction site choose a local business or campus public building and make your assessment from that location.

IMG_5294

1- Unused wood was in front of the entrance so anyone could step on it and break it

A- they sould have kept it in a corner so that no one could get heart and the wood cannot be broken from someone.

2-

IMG_5274 Macintosh HD:Users:fahadmahnashi:Desktop:IMG_5292.jpg

2- Electricity cables aren’t covered .

They should have caver the electricity cables because if someone touch it, it may take his life away.

IMG_5275

3- the electricity plunger was on the stairway steps and on the ground.

They should have keep it up till they finsh their work

IMG_5303

4- This man here wasn’t wearing safety glasses while he is cutting the wood. Also he was wearing a normal chose that could be crashed of any Niles on the ground.

C:\Users\MAAD TICHA\Downloads\index.jpg

it can be observed that the person carrying out his activities at the top of the building has not taken any safety and he risks falling off fro the building. It can also be seen that there are no climbing-facilities which in real life, it is a crucial requirement.

Location: 1320 Journy Dr

Murfrfreesboro, Tn

The time was 2 pm